Workflow
载人着陆系统(月球着陆器)
icon
Search documents
美航天局:SpaceX 研发月球着陆器进度滞后 拟重新开放竞标
Yang Shi Xin Wen· 2025-10-21 13:32
Core Points - NASA plans to reopen the contract for the "Artemis 3" crewed lunar lander due to delays in SpaceX's development progress, allowing other U.S. companies to compete for the contract [2] - The "crewed landing system" is a crucial component of the "Artemis 3" mission, responsible for transporting astronauts between lunar orbit and the lunar surface [2] - SpaceX was awarded a contract worth approximately $2.9 billion in April 2021 to develop and manufacture the lunar lander [2] - Elon Musk stated that SpaceX is progressing rapidly compared to other U.S. space companies and that the new heavy-lift rocket "Starship" will eventually complete the entire lunar mission [3] - Other U.S. companies involved in the "Artemis" program include Blue Origin, Boeing, and Lockheed Martin [3] - The "Artemis" lunar program was announced in 2019, with the "Artemis 1" unmanned lunar flyby test conducted in November 2022 [3] - NASA has postponed the timelines for the "Artemis 2" crewed lunar flyby and "Artemis 3" crewed lunar landing to April 2026 and mid-2027, respectively [3]
美航天局:SpaceX研发月球着陆器进度滞后 拟重新开放竞标
Xin Hua Wang· 2025-10-21 09:08
Core Points - NASA's acting administrator Sean Duffy announced that due to delays in SpaceX's development of the Artemis 3 crewed lunar lander, the agency plans to reopen the contract for bidding by other U.S. companies [1] - Duffy emphasized that competition and innovation are crucial for maintaining U.S. leadership in space, hence the decision to allow other companies like Blue Origin to participate in the lunar lander production [1] - The crewed landing system is a vital component of the Artemis 3 mission, responsible for transporting astronauts between lunar orbit and the moon's surface [1] Company Developments - SpaceX currently holds a contract worth approximately $2.9 billion from NASA to develop and manufacture the lunar lander [1] - Elon Musk, founder of SpaceX, responded that the company is progressing "at lightning speed" compared to other U.S. space industry players and stated that the new heavy-lift rocket, Starship, will ultimately complete the entire lunar mission [2] - Other U.S. companies involved in the Artemis program include Blue Origin, Boeing, and Lockheed Martin, indicating a collaborative effort in various aspects of the mission [2] Mission Timeline - The Artemis program was announced by the U.S. in 2019, with the Artemis 1 unmanned lunar flyby test conducted in November 2022 [2] - NASA has postponed the timelines for the Artemis 2 crewed lunar flyby and Artemis 3 crewed lunar landing to April 2026 and mid-2027, respectively [2]
美航天局:SpaceX研发月球着陆器进度滞后 拟重新开放竞标
Xin Hua She· 2025-10-21 09:02
Core Points - NASA plans to reopen the contract for the "Artemis 3" crewed lunar lander due to delays in SpaceX's development progress, allowing other U.S. companies to participate in the bidding process [1][2] - The "crewed landing system" is a critical component of the "Artemis 3" mission, responsible for transporting astronauts between lunar orbit and the lunar surface [1] - SpaceX was awarded a contract worth approximately $2.9 billion in April 2021 to develop and manufacture the lunar lander [1] Group 1 - NASA Administrator Sean Duffy announced the decision to open the contract to other companies, emphasizing that competition and innovation are key to maintaining U.S. leadership in space [1] - SpaceX founder Elon Musk responded that the company is progressing rapidly compared to other U.S. space industry players and that their next-generation heavy-lift rocket, Starship, will ultimately complete the entire lunar mission [2] - Other U.S. companies involved in various aspects of the "Artemis" program include Blue Origin, Boeing, and Lockheed Martin [2] Group 2 - The "Artemis" lunar program was announced by the U.S. in 2019, with the "Artemis 1" unmanned lunar flyby test mission executed in November 2022 [2] - NASA has postponed the timelines for the "Artemis 2" crewed lunar flyby and "Artemis 3" crewed lunar landing missions to April 2026 and mid-2027, respectively [2]