输变电
Search documents
“项”上生长 能量满格
Zhong Guo Neng Yuan Wang· 2025-10-10 10:04
Core Viewpoint - The Inner Mongolia Energy Group is actively engaged in major construction projects during the holiday season, demonstrating a commitment to maintaining progress and meeting deadlines, particularly for the Jinshan Third Thermal Power Company project, which is crucial for energy supply and heating in the region [1]. Group 1: Project Progress and Achievements - The Jinshan Third Thermal Power Company is a significant national construction project, with over 3,000 personnel working tirelessly to achieve the ignition goal during the holiday period [1]. - As of now, the main plant enclosure for Unit 1 is 90% complete, and for Unit 2, it is 80% complete. The installation of turbine equipment for Unit 1 is 70% complete, while for Unit 2, it is 45% complete [19]. - The construction of the coal supply system is progressing, with 80% of the main engineering completed [19]. Group 2: Operational Challenges and Solutions - The operational team faced challenges with the vacuum system, which was stuck at 35 kPa. A leak detection team was formed to address the issue, successfully identifying and correcting two minor leak points [4][5]. - The vibration levels of the condensate pump motor exceeded the standard, prompting a dedicated team to stabilize the readings through testing and adjustments [8][9]. Group 3: Safety and Quality Control Measures - The safety and environmental department emphasized the importance of maintaining safety standards during holiday construction, implementing enhanced monitoring systems and real-time oversight [16]. - A comprehensive safety management system was established, including video surveillance and mobile inspection terminals to ensure quick reporting and resolution of hazards [16]. Group 4: Future Outlook and Strategic Planning - The company has initiated a "National Day Offensive Special Plan" to tackle progress challenges, focusing on the critical closure of the boiler, which is essential for subsequent operations [13]. - The company is also expanding its project portfolio, with new contracts for major power transmission and transformation projects, indicating a robust growth trajectory in the energy sector [27].
中国能建党委副书记、总经理倪真拜会埃及总理马德布利
Sou Hu Cai Jing· 2025-08-31 16:08
Core Viewpoint - The meeting between China's Energy Construction Group (China Energy) and Egyptian Prime Minister Mostafa Madbouly emphasizes the deepening cooperation between China and Egypt in energy, infrastructure, and sustainable development, aligning with both countries' strategic initiatives [1][3]. Group 1: Cooperation and Strategic Initiatives - The discussions focused on implementing the strategic consensus between the leaders of China and Egypt, promoting the alignment of the Belt and Road Initiative with Egypt's Vision 2030 [1]. - Both parties aim to enhance practical cooperation in energy, electricity planning, new energy, power transmission, and water resources, accelerating the implementation of key projects [1][3]. Group 2: Contributions and Future Plans - Prime Minister Madbouly expressed gratitude for China Energy's significant contributions to Egypt's green and sustainable development, highlighting the company's professional strength and reliability as a partner [3]. - China Energy plans to deepen its investment in Egypt, particularly in new energy development, seawater desalination, and grid planning, while also exploring third-party electricity transmission cooperation with Europe [3]. Group 3: Project Implementation and Local Development - China Energy is focusing on energy, electricity, and water resources, promoting green, efficient, and stable infrastructure construction globally, with Egypt being a core overseas market [3]. - The company has engaged in multiple practical cooperation projects in Egypt, including solar power, energy storage, power transmission, and municipal engineering, aiming to support the realization of Egypt's Vision 2030 [3].