Workflow
隧道与地下空间领域垂直大模型
icon
Search documents
AI进化速递丨国内首个隧道与地下空间领域垂直大模型发布
Di Yi Cai Jing· 2025-08-10 12:42
①因赛集团:AI"大模型+算法"双备案成功;②国内首个隧道与地下空间领域垂直大模型发布;③北京亦庄启动具身智能社会实验计划,打造全域实训场。 因赛集团:AI"大模型+算法"双备案成功 国内首个隧道与地下空间领域垂直大模型发布 北京亦庄启动具身智能社会实验计划,打造全域实训场 Interna 来 大模型+ 国赛集团: Al ■■ 国内首个隧道与地下空间领域 北京亦庄启动具身徑 ...
国内首个隧道与地下空间领域垂直大模型发布
Xin Lang Cai Jing· 2025-08-10 06:35
Core Viewpoint - The China Railway Group has announced the release of the country's first vertical large model in the field of tunnels and underground space, developed by the China Railway Tunnel Bureau's Tunnel Boring Machine and Intelligent Operation and Maintenance National Key Laboratory [1] Group 1 - The large model is based on a data center that includes 773 engineering lines and 120 billion construction data points, establishing a technology system for large model scheduling driven by general small models [1] - The model has been validated in various projects, including the plateau railway tunnel, Chongqing-Taiwan Yangtze River Tunnel, and Shenzhen-Jiang Railway Pearl River Estuary Tunnel, achieving safe, high-quality, efficient, and green tunnel construction [1] - This development is expected to promote the digital and intelligent transformation and upgrading of the industry [1]