Workflow
1.4nm制程
icon
Search documents
台积电美国厂将提前量产3nm!
国芯网· 2025-12-19 14:12
Group 1 - TSMC's Arizona facility will begin equipment installation in Q3 2026, with production of 3nm process expected to start in 2027, one year earlier than originally planned [2] - The third wafer fab, utilizing 2nm process, is set to commence construction in Q2 2026, following the progress of the second factory [2] Group 2 - TSMC is actively transferring capacity to the U.S. while addressing concerns about technology leakage, stating that the most advanced processes will remain in its headquarters [4] - Key technologies will be regulated, and personnel involved will be monitored, ensuring that overseas production will lag behind domestic capabilities by two generations [4] - For instance, the current advanced production process is 2nm (N2), while overseas production will be at 5nm (N5), with a gap of 3nm process in between [4]
三星招聘!年薪230万!
国芯网· 2025-06-24 13:26
Group 1 - Samsung is intensifying recruitment efforts for local sales talent in the U.S. semiconductor market, offering competitive salaries, with the highest base salary reaching $320,000 (approximately 2.3 million RMB) for managerial positions [1] - The recruitment includes positions for sales and business development directors and managers, as well as a senior engineering manager for customer quality management, with total annual compensation potentially reaching $400,000 [1] - Samsung has restructured its local sales team and appointed a former TSMC executive to lead U.S. foundry sales, aiming to attract major clients like NVIDIA and Qualcomm [1] Group 2 - Samsung has identified the 2nm process as a core focus for its foundry division, planning to introduce mass production equipment at its Texas facility by early 2026 [2] - The construction of clean rooms at the Texas site has resumed and is expected to be completed by the end of this year, paving the way for subsequent equipment installation [2] - To concentrate resources on the 2nm process, Samsung has postponed the construction of its Pyeongtaek No. 2 fab's 1.4nm test line, with mass production now expected to be delayed until 2028 [2]
台积电1.4nm制程重大突破!
国芯网· 2025-03-31 13:10
Core Viewpoint - TSMC has made significant progress in advancing its 1.4nm process technology and is preparing for production at its facilities in Taiwan, indicating a strategic shift in its manufacturing focus [1][2]. Group 1 - TSMC has notified suppliers to prepare equipment for the 1.4nm process, with plans to set up a pilot production line at the new Hsinchu Baoshan factory this year [1]. - The company is shifting its production focus southward, as evidenced by the recent groundbreaking ceremony for the 2nm facility in Kaohsiung, which highlights TSMC's commitment to advanced manufacturing in Taiwan [1]. - The original plan for four 2nm fabs at Baoshan has been revised to incorporate 1.4nm production, while Kaohsiung will have at least three 2nm fabs, indicating a robust expansion strategy [1]. Group 2 - TSMC retains flexibility for the construction of a sixth factory in Kaohsiung, with no current plans but potential future advancements in process technology being considered [2].