40万吨矿石码头
Search documents
40万吨世界一流矿码头比翼双飞,山东港口青岛港码头建设纪实
Qi Lu Wan Bao· 2025-10-30 07:48
Core Viewpoint - The successful completion of the second 400,000-ton ore terminal at Qingdao Port marks a significant milestone in the development of the world's largest ore terminal project, showcasing high-quality construction and advanced engineering capabilities [1][3][6]. Group 1: Project Overview - The second 400,000-ton ore terminal project at Dongjiakou Port, Qingdao, has been completed and passed inspection, featuring advanced construction techniques and significant engineering achievements [1][3]. - The project involved the installation of 662 beam panels, 462 meters of approach bridges, and extensive cable and structural work, highlighting the scale and complexity of the construction [1][3][6]. Group 2: Challenges and Solutions - The construction faced numerous challenges, including tight timelines, complex engineering requirements, and the need for precise measurements, with structural components needing to be within 5 millimeters of specified tolerances [3][4][8]. - The project team worked long hours, averaging 15 to 16 hours a day, to meet deadlines and ensure quality, demonstrating a strong commitment to overcoming obstacles [4][6][15]. Group 3: Government and Organizational Support - Strong support from local government and the Qingdao Port Group was crucial in facilitating the project's progress, providing necessary resources and policy backing [4][6]. - The project was characterized by a collaborative spirit among team members, with a focus on high standards and quality, aiming to create a "century-old quality project" [7][8][12]. Group 4: Technological Innovations - The terminal incorporates innovative technologies, including a smart control platform for dry bulk cargo operations, enhancing efficiency and reducing costs [9][11][12]. - The project has set new standards in the industry, with achievements such as the first comprehensive smart collaborative operation model for dry bulk terminals, showcasing Qingdao Port's leadership in port technology [11][12][13]. Group 5: Future Prospects - The successful completion of this terminal sets the stage for future projects at Qingdao Port, including upgrades and new constructions, reflecting the ongoing commitment to development and innovation in the port industry [20].
比翼双飞四十万 世界一流矿码头
Da Zhong Ri Bao· 2025-10-28 03:07
Core Insights - The Qingdao Port has officially launched its second 400,000-ton bulk cargo terminal, making it the first port in China to have dual 400,000-ton ore terminals, marking a significant milestone in the development of large-scale dry bulk cargo handling in the country [2][3][4] Group 1: Infrastructure Development - The new terminal will increase throughput capacity by 16 million tons per year, contributing to a total annual capacity of over 56 million tons for the dual 400,000-ton berths [4] - The terminal is equipped with advanced unloading and storage facilities, including two 3,500 tons/hour unloaders and a 10,500 tons/hour conveyor system, enhancing operational efficiency [3][4] - The construction of the terminal began in December 2022 and includes a 290,000 square meter front storage area and a 1,020,000 square meter rear storage area [3] Group 2: Technological Advancements - The new terminal is the first smart 400,000-ton bulk cargo terminal in the country, integrating cutting-edge technologies such as 5G, artificial intelligence, and cloud computing [5][6] - It features a universal operating system for bulk cargo terminals (iGTOS) that enables real-time monitoring and decision-making throughout the production process [5] - The project has established a digital management platform for smart water transport engineering, enhancing construction precision and safety [6] Group 3: Strategic Importance - The dual 400,000-ton terminals will serve as a critical artery for iron ore transportation, supporting national energy resource security and stabilizing supply chains [4][9] - The Qingdao Port is positioned as a key hub for energy and raw material transportation in northern China, contributing to the development of an international first-class port and supporting regional economic growth [9][10] - The integration of the two terminals will enhance the port's capability to handle large vessels, further solidifying its leadership in the coastal port sector [9][10] Group 4: Efficient Project Execution - The Qingdao Port has implemented a systematic approach to ensure early production and efficiency, including precise planning and coordination with government departments [7][8] - The project received key operational permits within two days, demonstrating a streamlined approval process that supports rapid development [8]
全国首个!正式投产
中国能源报· 2025-10-27 12:59
Core Viewpoint - The Qingdao Port has officially launched its second 400,000-ton ore terminal, becoming the first port in China to have two 400,000-ton ore terminals and the first in northern China to possess a smart terminal for dry bulk cargo [1][3]. Group 1: Terminal Capacity and Technology - The new terminal, which began construction in December 2022, includes one 300,000-ton iron ore berth designed to accommodate 400,000-ton bulk carriers, increasing the terminal's throughput capacity by 16 million tons per year and enhancing storage capacity by 10 million tons [3]. - The terminal integrates advanced technologies such as 5G, artificial intelligence, and cloud computing, featuring a smart dry bulk terminal operating system (iGTOS) that enables real-time monitoring, intelligent decision-making, and digital perception throughout the production process [3][4]. - The terminal is equipped with the latest automated equipment for unloading, loading, blending, and supply, marking a transition from traditional operations to smart services in the domestic ultra-large dry bulk terminal sector [3][4]. Group 2: Industry Impact and Trends - The trend of increasing ship sizes is evident, with the first 400,000-ton ore terminal in the Dongjiakou area receiving its first large vessel in 2015, marking the beginning of the "large vessel era" in China's dry bulk operations [4]. - By September 2025, the first terminal is expected to have handled over 460 large vessels, totaling 160 million tons, with the second terminal's throughput capacity expected to exceed 56 million tons, providing a "round-the-clock, high-efficiency" transportation artery for iron ore to steel enterprises in China [4][5].
全国首个!青岛港第二座40万吨矿石码头投产
Xin Lang Cai Jing· 2025-10-27 08:44
Core Insights - The launch of the "Gemini" vessel carrying 300,000 tons of ore at Qingdao Port marks the official operation of the second 400,000-ton ore terminal, making Qingdao the first port in China with a 400,000-ton dry bulk smart terminal and the first in northern China to have dual 400,000-ton ore terminal configurations [1] Group 1 - The second 400,000-ton ore terminal at Qingdao Port commenced construction in December 2022 [1] - The new terminal includes one 300,000-ton iron ore berth designed to accommodate 400,000-ton bulk carriers [1] - The operational capacity of the new terminal will add 16 million tons per year and enhance storage capacity by 10 million tons, contributing to an annual throughput capacity exceeding 56 million tons for the dual 400,000-ton berths [1]