40万吨矿石码头
Search documents
比翼双飞四十万 世界一流矿码头
Da Zhong Ri Bao· 2025-10-28 03:07
10月27日,随着载有巴西淡水河谷铁矿的30万吨矿石船舶"双子座"轮在山东港口青岛港董家口港区矿石码头D31泊位开启第一抓斗作业,青岛港第二座40 万吨矿石码头正式投产。 这一重大突破,让青岛港成为全国首个拥有40万吨干散货数智码头、北方首个拥有双40万吨矿石码头配置的港口。这不仅是青岛港枢纽能级、青岛国际航 运中心建设的新跨越,更是我国超大型干散货码头建设与运营的新高峰,对推动我国港口行业转型升级具有重要意义。 双40万泊位,年通过能力突破5600万吨 作为国家重点水运建设项目、《青岛港总体规划(2035年)》落地的核心项目,青岛港第二座40万吨矿石码头是紧抓国家战略机遇,强力推进产业链、供应 链延伸拓展的关键举措。 一直以来,青岛港加速推动港口功能从"运输枢纽"向"供应链枢纽"升级,董家口港区凭借区位与资源优势,成为推动高质量发展的新增长极。当前,国际 船舶的大型化趋势越来越明显,董家口港区首座40万吨矿石码头2024年接卸量突破4000万吨、泊位利用率高达90%,能力趋近饱和。 而此次新码头建成投产,正是青岛港直面码头能力瓶颈,不断扩大泊位效能、稳定供应链保障的生动实践,对支撑区域高质量发展、更好服务国 ...
全国首个!正式投产
中国能源报· 2025-10-27 12:59
Core Viewpoint - The Qingdao Port has officially launched its second 400,000-ton ore terminal, becoming the first port in China to have two 400,000-ton ore terminals and the first in northern China to possess a smart terminal for dry bulk cargo [1][3]. Group 1: Terminal Capacity and Technology - The new terminal, which began construction in December 2022, includes one 300,000-ton iron ore berth designed to accommodate 400,000-ton bulk carriers, increasing the terminal's throughput capacity by 16 million tons per year and enhancing storage capacity by 10 million tons [3]. - The terminal integrates advanced technologies such as 5G, artificial intelligence, and cloud computing, featuring a smart dry bulk terminal operating system (iGTOS) that enables real-time monitoring, intelligent decision-making, and digital perception throughout the production process [3][4]. - The terminal is equipped with the latest automated equipment for unloading, loading, blending, and supply, marking a transition from traditional operations to smart services in the domestic ultra-large dry bulk terminal sector [3][4]. Group 2: Industry Impact and Trends - The trend of increasing ship sizes is evident, with the first 400,000-ton ore terminal in the Dongjiakou area receiving its first large vessel in 2015, marking the beginning of the "large vessel era" in China's dry bulk operations [4]. - By September 2025, the first terminal is expected to have handled over 460 large vessels, totaling 160 million tons, with the second terminal's throughput capacity expected to exceed 56 million tons, providing a "round-the-clock, high-efficiency" transportation artery for iron ore to steel enterprises in China [4][5].
全国首个!青岛港第二座40万吨矿石码头投产
Xin Lang Cai Jing· 2025-10-27 08:44
10月27日,来自巴西的30万吨矿石船舶"双子座"轮在青岛港董家口港区矿石码头D31泊位开启第一抓斗 作业,标志着青岛港第二座40万吨矿石码头正式投产。青岛港也成为全国首个拥有40万吨干散货数智码 头、北方首个拥有双40万吨矿石码头配置的港口。据了解,青岛港第二座40万吨矿石码头于2022年12月 正式开工,建设1个30万吨级铁矿石泊位(水工结构按靠泊40万吨散货船设计),投产运营后,新增码 头通过能力1600万吨/年、提升堆存能力1000万吨,助力"双40万泊位"年通过能力突破5600万吨。 ...