Workflow
地质工程一体化
icon
Search documents
渤海钻探一钻公司 钻井队年累进尺首上2万米
Zhong Guo Hua Gong Bao· 2025-09-05 02:46
Core Insights - The company achieved a significant milestone by successfully drilling the Shanxi Anping 10 well to a depth of 2,278 meters, marking the first time a 40-type drilling team surpassed 20,000 meters in annual cumulative drilling [1] - The success is attributed to systematic production organization, refined technical management, and highly coordinated team operations, emphasizing the philosophy that "time equals footage, efficiency equals benefits" [1][2] - The team has maintained a 100% success rate in well quality and cementing quality, as well as a 100% success rate in electrical measurement on the first attempt [1] Production Optimization - The team holds daily "geological engineering integration" meetings to enhance communication with relevant parties, anticipate potential risks, and develop detailed construction plans [2] - Emphasis is placed on benchmark management, with scientific planning for each well's operational schedule and careful personnel allocation to ensure smooth transitions between construction phases [2] - Team leaders are on-site 24/7 to address any factors that may hinder drilling progress, while technical experts oversee critical positions to ensure strict technical control [2] Technical Advancements - The team has intensified technical research efforts, analyzing neighboring well data and summarizing construction experiences to identify bottlenecks and challenges for each well [3] - Customized technical measures and risk prevention strategies are developed for different well sections and geological conditions, implementing a dynamic management approach that allows for real-time adjustments [3] - Team collaboration is emphasized, with technicians actively involved in equipment maintenance and mud management to prevent downhole accidents and optimize drilling performance [3]
中原塔里木钻井进尺突破30万米
Zhong Guo Hua Gong Bao· 2025-08-15 02:08
Core Insights - The company has achieved a significant milestone by surpassing 300,000 meters in drilling depth, becoming the first drilling company under Zhongyuan Petroleum Engineering Company to reach this mark in the domestic market [1] Group 1: Innovation and Technology - The company emphasizes innovation-driven strategies and has integrated geological engineering to enhance operational efficiency [1] - A collaborative expert working mechanism has been established to ensure synchronized design validation, optimization of plans, and joint problem-solving [1] - The company has revised 9 management systems and upgraded technical templates for the Shunbei and Tahe blocks to tackle technical challenges such as annular pressure control and wellbore stability [1] Group 2: Performance Metrics - The company has set 18 new innovation records and received 18 mobile flags from the Northwest Oilfield Company, along with 14 quality well evaluations [1] - The Shunzhong 4-7X well was completed at a depth of 8,476 meters with a drilling cycle of 59.63 days, setting a record for the shortest cycle for wells deeper than 8,000 meters in China [1] Group 3: Automation and Digitalization - The company is advancing the electrification, automation, and digitalization of drilling rigs, enhancing new production capabilities [1] - Currently, the company has equipped 10 sets of automated casing equipment, achieving a coverage rate of 35.71% [1] - Six sets of MRO IoT systems have been deployed for real-time monitoring and intelligent analysis of drilling equipment parameters, enabling remote monitoring of key equipment [1]
渤海钻探一钻刷新施工纪录,渤钻二录井激活创效新动能
Zhong Guo Hua Gong Bao· 2025-08-08 01:44
Group 1 - The Bohai Drilling Company achieved a new record of 151 meters of daily drilling in the Daqing gas storage project, utilizing integrated geological engineering advantages and innovative technologies [1][2] - The company faced challenges such as poor drillability and strong abrasiveness of the target layer, but effectively analyzed geological data and developed detailed emergency plans [1] - The use of a powerful rock-breaking combination of "high torque screw + multi-stage hydraulic impactor" significantly improved rock-breaking efficiency and drill bit lifespan [1] Group 2 - The Bohai Drilling Second Recording Company held a brainstorming session focused on "increasing revenue and reducing costs," recognizing the need to innovate in a challenging pricing environment [2][3] - The company aims to implement digital technologies and strengthen dynamic cost monitoring through a centralized ERP system, while also incorporating cost reduction into annual performance evaluations [2] - A special task force was established to evaluate and implement feasible suggestions from the brainstorming session, with an incentive mechanism to encourage employee participation in cost-saving initiatives [3]
长北:互利共赢铸就天然气项目开发典范
Sou Hu Cai Jing· 2025-06-27 11:13
Core Insights - The Changbei International Cooperation Project has produced a cumulative natural gas output of 62.5 billion cubic meters and generated sales revenue of 65.1 billion yuan, with internal profits for the Chinese side reaching 26 billion yuan, showcasing a successful model for international cooperation in China's petroleum industry [2] Project Background and Integration Effects - The project was initiated in 1999 when China National Petroleum Corporation (CNPC) signed a 30-year product-sharing contract with Shell to develop the Changbei block in the Ordos Basin, marking a significant step in China's "going out" strategy [2] - The project is located in the northern part of the Yulin gas field, characterized by low permeability, low porosity, and low abundance, serving as a key gas supply source for Beijing [2] Technological Innovation and Management Breakthroughs - The Shaanxi 141 well, known as the "meritorious well," has established a foundation for large-scale development of ancient geological natural gas, contributing to the increase in annual natural gas production in the Ordos Basin from 10 billion to 50 billion cubic meters [3] - The project has adopted an integrated geological engineering model to tackle development challenges, utilizing advanced drilling techniques and optimizing the gathering and transportation system to enhance efficiency and reduce costs [3] Excellent Operational Management - The project has implemented an advanced operational management system that integrates people, processes, facilities, and production, achieving unified scheduling, cost accounting, and operational standards [4] - The use of SAP systems for data sharing and the implementation of an intelligent control system have significantly improved efficiency and safety [4] Cultural Leadership and Future Outlook - The project has integrated HSE (Health, Safety, and Environment) culture with CNPC's management philosophy, establishing a robust safety management system and promoting safety awareness through various initiatives [4] - As a training ground for international talent and a platform for learning advanced international experiences, the project has developed a multi-level international talent pool and fostered a unique cooperative culture [5] - The successful development of the Changbei project serves as a valuable practical example for CNPC in its pursuit of becoming a world-class integrated international energy company [5]