数字储能技术
Search documents
HICOOL全球创业者峰会将开幕,超400个项目已落地顺义
Xin Jing Bao· 2025-10-11 11:55
Group 1 - The HICOOL 2025 Global Entrepreneur Summit will be held from October 16 to 18 at the Capital International Exhibition Center, with over 400 competitions and related projects attracted to Shunyi District in the past six years [1] - The HICOOL Global Entrepreneur Competition received a record 10,055 entrepreneurial projects and 13,150 entrepreneurs from 139 countries and regions, with 48 projects advancing to the finals [1] - Winning projects have the opportunity to receive direct investment of up to 10 million yuan and access to high-quality resources in Beijing's science and technology innovation sector [1] Group 2 - The HICOOL Industrial Park Phase II is under construction and is expected to open in 2024, focusing on high-tech enterprises in artificial intelligence, healthcare, and intelligent equipment [3] - The park serves as a landing platform for projects from the HICOOL competition, providing support for innovation and entrepreneurship [5] - The park has introduced government service windows for businesses to handle administrative tasks conveniently [6] Group 3 - The dynamic reconfigurable battery network technology developed by Yunshu (Beijing) New Energy Technology Co., Ltd. won first place in the HICOOL Global Entrepreneur Competition, showcasing a significant advancement in energy systems [4][5] - The technology allows for the removal of faulty battery units without affecting the overall system, enhancing reliability and efficiency [4] - The company is currently conducting capacity validation experiments, showing a 3% higher capacity retention compared to traditional storage methods [5] Group 4 - The HICOOL Industrial Park has expanded its facilities, including a new 2,000 square meter basketball and football field, enhancing the living and working environment for employees and local residents [7] - The park's total carrying space has reached 121,100 square meters, with ongoing improvements to create a conducive ecosystem for innovation and entrepreneurship [7]
全球首座百兆瓦时级数字储能电站验收成功!
中关村储能产业技术联盟· 2025-09-26 06:15
文 | 中国电力报 9 月 2 5 日 从 三 峡 集 团 获 悉 , 大 规 模 先 进 电 力 储 能 关 键 技 术 研 究 与 示 范 项 目 —— 5 0 兆 瓦/ 100兆瓦时 数字储能示范工程,于9月24日在内蒙古自治区三峡乌兰察布新一代电网友 好绿色电站项目2号场站通过验收。该工程为 全球首座百兆瓦时级数字储能电站 ,其成 功验收标志着我国数字储能技术从科研攻关迈向规模化工程应用。 预定展位详情咨询: 曹先生 13 5 5 2 7 1 2 1 8 9 王先生 13 5 8 1 8 8 5 5 2 0 李先生 13 5 8 1 7 4 1 6 8 0 该项目由三峡科研院牵头,联合清华大学共同研发,由46个容量为1.075兆瓦/ 2 . 15兆瓦时 的储能集装箱构成,包含数字能量交换系统、数字储能集成系统、能量管理与智能运维平 台三大核心组件。 项目所在的三峡乌兰察布新一代绿色友好电站,总装机200万千瓦,配套55万千瓦电化学 储能。该场站以"源、网、储"整体联动为示范,可缓解电网灵活性调节压力,提升地区清 洁能源消纳水平。 ESIE 2026 储能产业发展的风向标 相关阅读 2025"钠离子电池 ...
百兆瓦时级!全球首座,完成验收
中国能源报· 2025-09-25 06:40
Core Viewpoint - The successful acceptance of the 50 MW / 100 MWh digital energy storage demonstration project marks a significant advancement in China's digital storage technology, transitioning from research to large-scale engineering application [1]. Group 1: Project Overview - The digital energy storage demonstration project is the world's first 100 MWh level digital storage station, located in Inner Mongolia [1]. - The project was led by the China Three Gorges Corporation and involved collaboration with Tsinghua University, consisting of 46 storage containers with capacities of 1.075 MW / 2.15 MWh [3]. Group 2: Technological Innovations - The project features a digital energy exchange system, a digital storage integration system, and an energy management and intelligent operation and maintenance platform, enabling millisecond-level dynamic switching [3]. - The innovative battery network structure allows for flexible and dynamic reconfiguration, supporting low-cost and long-life digital storage technology [3]. Group 3: Integration with Renewable Energy - The project is part of the Three Gorges Ulanqab New Generation Green Friendly Power Station, which has a total installed capacity of 2 million kW and includes 550,000 kW of electrochemical storage [5]. - The station demonstrates an integrated operation of wind, solar, and storage, enhancing the flexibility of the power grid and improving the consumption of clean energy in the region [5].
全球首座,验收成功!
Ke Ji Ri Bao· 2025-09-25 06:36
Core Insights - The successful acceptance of the 50 MW/100 MWh digital energy storage demonstration project marks a significant advancement in China's digital energy storage technology, transitioning from research to large-scale engineering application [1] Group 1: Project Overview - The project is the world's first 100 MWh level digital energy storage station, located in Inner Mongolia at the Three Gorges Ulanqab new generation green power station [1] - The project was led by the Three Gorges Research Institute in collaboration with Tsinghua University, consisting of 46 energy storage containers with capacities of 1.075 MW/2.15 MWh [1] Group 2: Technical Components - The project includes three core components: digital energy exchange system, digital energy storage integration system, and energy management and intelligent operation and maintenance platform [1] Group 3: Impact on Energy Sector - The total installed capacity of the Three Gorges Ulanqab new generation green power station is 2 million kW, with an accompanying 550,000 kW of electrochemical energy storage [1] - The project demonstrates an integrated approach of "source, grid, and storage," which can alleviate the flexibility adjustment pressure on the power grid and enhance the region's clean energy consumption level [1]