船队运力结构优化
Search documents
招商局南京油运股份有限公司 第十一届董事会第十三次会议决议公告
Zhong Guo Zheng Quan Bao - Zhong Zheng Wang· 2025-09-24 04:26
Group 1 - The company held its 13th meeting of the 11th Board of Directors on September 23, 2025, via electronic communication, with all 9 directors participating in the vote, ensuring the legality and validity of the resolutions [2][4]. - The Board approved the construction of two 65,000-ton PANAMAX oil tankers at a maximum investment of 976.06 million RMB (including tax) to enhance the company's operational capacity and competitiveness in the crude oil transportation market [3][5]. - The new tankers are designed to meet the IMO Tier III emission standards and will feature a dual-fuel methanol reserve design, with delivery expected in the second half of 2028 [3][5]. Group 2 - The company also approved the construction of a 9,500 cubic meter ethylene ship at a contract price of 365 million RMB (including tax) through its subsidiary, Shanghai Changshi Shipping Co., Ltd., from the related party, Jiangsu Dingheng Shipbuilding Co., Ltd. [12][13]. - This transaction is classified as a related party transaction and does not constitute a major asset restructuring as per the regulations [12][15]. - The new ethylene ship is expected to be delivered in the first half of 2028 and aims to optimize the company's ethylene fleet and strengthen its market position [13][25].