Workflow
芯片制程良率
icon
Search documents
良品率拖后腿 曝英特尔Panther Lake量产再“爽约”
Xi Niu Cai Jing· 2025-08-19 07:48
Group 1 - Intel's first processor based on the 18A process, Panther Lake, has been delayed from mass production originally scheduled for the end of 2025 to the first quarter of 2026 due to poor yield rates [2] - The current yield rate for the 18A process is approximately 10%, significantly below the 50% threshold required for mass production, and profitability typically requires a yield of 70%-80% [2] - The delay in Panther Lake's production could lead to increased production costs and impact timely product delivery, posing a risk to Intel's market share amid ongoing competition with AMD [2] Group 2 - Intel is projected to incur a loss of $18.76 billion in 2024, prompting CEO Pat Gelsinger to implement cost-cutting measures, including a 15% workforce reduction and the divestment of non-core businesses [3] - The company aims to transform its Integrated Device Manufacturing (IFS) segment into a "U.S. version of TSMC" to alleviate financial pressures [3]
台积电美国厂芯片可能涨价30%
Guan Cha Zhe Wang· 2025-06-04 05:53
Group 1 - TSMC's 2nm process yield for memory products has surpassed 90%, indicating significant manufacturing efficiency [1] - TSMC is targeting orders from major US tech companies such as Nvidia, Apple, Qualcomm, AMD, and Broadcom, with expectations of reaching full capacity utilization soon [1] - The Arizona facility is currently producing N4 chips, corresponding to 5nm and 4nm technologies, with Nvidia's AI chips undergoing process validation and expected to start production by the end of this year [1] Group 2 - TSMC's 2nm wafer production is projected to reach four times the volume of the previous year's 5nm production, reflecting strong demand [2] - Major clients like Apple, MediaTek, Qualcomm, and AMD are planning to utilize TSMC's 2nm process for their next-generation chips, which is expected to drive revenue growth [2] - Analysts predict TSMC's revenue growth of 26.3% and 14.1% for 2025 and 2026, respectively, with advanced process nodes below 7nm increasing from 68.8% in 2024 to 79.3% in 2026 [2] Group 3 - In advanced packaging, TSMC's CoWoS shipments are expected to increase from 585,000 units in 2026 to 923,000 units, with capacity rising from 660,000 to 1,000,000 units, representing year-on-year growth of 52% and 58% [3] - Despite currency fluctuations affecting profit expectations for 2025-2027, TSMC's revenue is still anticipated to grow by approximately 25% in 2025 [3]