Workflow
载人月球探测
icon
Search documents
突破再+1!不起飞的“点火发射” “系留”如何进行?一文读懂↓
Yang Shi Wang· 2025-08-16 04:47
央视网消息:8月15日,我国在文昌航天发射场成功组织实施长征十号系列运载火箭"系留点火试验"。这是我国载人月球探测工程研制工作取 得的又一项重要阶段性突破。此次试验名为"系留点火试验",什么是"系留","系留"又将如何进行? 此次试验可以看作一次不起飞的"点火发射",是火箭最接近飞行状态的大型地面试验。所谓"系留试验"就是将试验箭体牢牢固定在试验平台上 点火试车,拴住它不要让它飞走。 试验所使用的箭体是长征十号系列运载火箭一子级试验箭,直径5米、高25米。在点火过程中,试验箭的7台发动机产生近千吨的推力,创造了 我国火箭发动机试车推力的新纪录。 而长征十号火箭是由3个这样的火箭模块组成,起飞推力是这次试验的3倍。为了避免推力过大导致火箭脱离试验平台,研制人员通过200多个 螺栓将试验箭体与试验平台相固连,确保试验顺利进行,安全可控。 据介绍,发动机试车对试验台的要求极高。目前,我国还没有能够满足千吨级发动机试车的试验台,研制团队因此将试验搬到了发射场来进 行。 徐洪平表示,之后再结合回收的一些技术验证,做一个低空飞行,然后再做一个7台发动机真正入轨的技术验证分析。 中国航天科技集团彭越介绍,由于这型火箭的推力 ...
新目标!我国新一代载人登月运载火箭研制再突破
Xin Hua She· 2025-08-15 14:56
Core Viewpoint - China's new generation manned lunar landing carrier rocket, the Long March 10 series, has achieved significant breakthroughs in its development, marking an important milestone in the country's lunar exploration program [1][6]. Group 1: Development and Technical Requirements - The Long March 10 series is designed to meet the complex technical requirements of manned lunar missions, which exceed those of low Earth orbit tasks [3]. - The engineering plan requires two rockets to accurately deliver the lunar lander and the new generation manned spacecraft into the translunar transfer orbit, necessitating a payload capacity of no less than 27 tons [3][4]. - Current active rockets in China, such as the Long March 2F, Long March 7, and Long March 5, do not meet this 27-ton requirement for translunar transfer [4]. Group 2: Reliability and Precision - The manned lunar exploration program adopts a "two launches, lunar rendezvous" approach, which imposes higher reliability and safety standards on the rocket systems [5]. - The design standards for the new generation carrier rocket include redundancy, escape systems, and intelligent fault diagnosis to ensure astronaut safety and mission success [5]. - High precision in launch and orbit insertion is critical, requiring the rockets to deliver their payloads into the translunar transfer orbit within strict timing sequences [5]. Group 3: Long March 10 Series Overview - The Long March 10 series consists of two configurations: Long March 10 and Long March 10A, specifically developed for manned lunar exploration [6]. - Long March 10 is a three-stage rocket with a diameter of 5 meters and a maximum height of 92.5 meters, designed to launch the manned spacecraft and lunar lander [7]. - Long March 10A is a two-stage rocket with a recoverable first stage, aimed at supporting both lunar missions and space station operations [7].
“长十火箭系留点火试验成功为载人月球探测任务奠定重要技术基础”
Xin Hua She· 2025-08-15 14:01
Core Viewpoint - The successful tethered ignition test of the Long March 10 rocket series marks a significant technological milestone for China's manned lunar exploration program, aiming for a lunar landing by 2030 [1][2]. Group 1: Mission and Design - The Long March 10 rocket series is designed for both manned lunar missions and cargo transport, featuring two versions: the lunar version and the near-Earth version [2]. - The Long March 10 rocket is a three-stage rocket with a core diameter of 5 meters, while the Long March 10A is a two-stage rocket with a reusable first stage [2]. Group 2: Testing and Development - The tethered ignition test is a crucial step in the rocket development process, allowing for the verification of the propulsion system under controlled conditions [2][3]. - This test is the first of its kind conducted at the launch site for the Long March series, providing a vital technical foundation for the lunar exploration mission [2][3]. - The test achieved a thrust scale of nearly 1,000 tons, making it the largest full-system test conducted domestically [3]. Group 3: Future Plans - The Long March 10 rocket's development will proceed in four phases, with the tethered ignition test being the second phase, followed by additional ignition tests and a low-altitude flight test [4]. - Future tests will include a true orbital flight validation, further advancing the capabilities of China's manned space transportation system [4].
“长十火箭系留点火试验成功为载人月球探测任务奠定重要技术基础”——访中国航天科技集团一院长征十号系列运载火箭总指挥徐洪平
Xin Hua She· 2025-08-15 13:51
Core Viewpoint - The successful tethered ignition test of the Long March 10 rocket series marks a significant technological milestone for China's manned lunar exploration program, paving the way for future missions [1][3]. Group 1: Mission and Design - The Long March 10 rocket series is designed to support China's goal of landing humans on the moon by 2030, requiring a high-safety, high-reliability, and high-thrust launch vehicle [2]. - The rocket features a modular design that allows for independent assembly and different configurations, with two versions: the lunar version and the near-Earth version [2]. - The Long March 10 is a three-stage rocket with a core diameter of 5 meters, intended to launch the crewed "Dream Boat Y" spacecraft and the lunar lander [2]. Group 2: Testing and Development - The tethered ignition test is the first of its kind conducted at a launch site for the Long March series, establishing a crucial technical foundation for the lunar exploration mission [3]. - This test involved a short-duration ignition of seven engines simultaneously, utilizing a temporary setup due to the lack of a dedicated test stand for such a configuration [3][4]. - The test achieved a thrust scale of nearly 1,000 tons, making it the largest full-system test conducted domestically [4]. Group 3: Future Plans - The ignition test is part of a four-step process for the Long March 10's engine testing, with subsequent tests planned to further validate the rocket's capabilities [5]. - Future tests will include low-altitude flight tests and actual orbital flight validation, contributing to the development of a new manned space transportation system [5].
我国载人月球探测工程研制工作取得重要阶段性突破
Xin Jing Bao· 2025-08-15 09:37
新京报讯(记者张建林)8月15日,由中国运载火箭技术研究院(简称"火箭院")组织实施的长征十号系列运 载火箭(简称"长十系列火箭")首次系留点火试验在中国文昌航天发射场取得成功。 记者从火箭院获悉,这是继圆满完成梦舟载人飞船零高度逃逸试验和揽月着陆器着陆起飞综合验证试验 之后,我国载人月球探测工程研制工作取得的又一项重要阶段性突破。 据介绍,本次试验是我国开展的国内最大推力规模的全系统试车试验,推力规模达到近千吨,也是我国 首次在航天发射场开展试车试验。 该型号副总指挥郭葳介绍,我国现有的试验台难以满足该系列火箭大推力的载荷要求,团队创新性地提 出利用发射场现有条件,开展这个近千吨规模的试验。 此次试验全面验证了长十系列火箭一子级动力系统模块,重点考核了多机并联、故障诊断等一系列关键 技术。试验队队员朱平平介绍,本次试验也同步考核和验证了设计中应用到的新型防热涂层、防热结构 等。 该试验是长十系列火箭研制过程中最重要的地面试验之一,将为型号后续大型地面试验和飞行任务积累 宝贵经验,也为载人月球探测任务奠定了重要技术基础。后续,长十系列火箭将全面应用于载人航天工 程(603698)任务,与梦舟载人飞船一起,实现 ...
6分钟,垂直涨停!军工股,突发异动
Zheng Quan Shi Bao· 2025-08-08 04:45
Group 1: Market Overview - A-shares experienced slight fluctuations with major indices showing mixed results, including minor gains in the Shanghai Composite Index and Shenzhen Component Index, while the North Star 50 and Sci-Tech 50 indices showed slight declines [1] - The number of declining stocks outnumbered advancing stocks, indicating a shrinking trading volume [1] Group 2: Brain-Computer Interface (BCI) Sector - The BCI sector continued its strong performance, with the index rising nearly 4% and reaching a five-year high, driven by favorable policies [2][4] - The Ministry of Industry and Information Technology and other government bodies released an implementation opinion aimed at promoting BCI industry innovation, targeting breakthroughs in key technologies by 2027 [4] - The opinion emphasizes the development of new brain signal sensors and chips, as well as the enhancement of decoding software using AI technology [4] Group 3: Defense and Aerospace Sector - The defense and aerospace sector saw a resurgence, with commercial space initiatives leading the charge, and the index reaching a historical high [5] - Notable companies like Feiwo Technology and De'en Precision Engineering experienced significant stock price increases, with some stocks hitting the daily limit [5] - Successful tests of the lunar landing vehicle mark a significant advancement in China's manned lunar exploration program [7]
影响市场重大事件:七部门表态,到2027年脑机接口关键技术取得突破,研发用于植入脑机接口的高精度手术机器人
Mei Ri Jing Ji Xin Wen· 2025-08-07 23:45
Group 1: Brain-Computer Interface Development - The Chinese government has issued implementation opinions to promote innovation in the brain-computer interface industry, focusing on the development of high-precision surgical robots for implanting brain-computer interfaces [1] - By 2027, breakthroughs in key technologies for brain-computer interfaces are expected, with the establishment of advanced technology, industry, and standard systems [1] - The industry aims to cultivate 2 to 3 globally influential leading enterprises and a number of specialized small and medium-sized enterprises by 2030 [1] Group 2: Southbound Capital Inflows - As of August 7, southbound capital has recorded a cumulative net purchase of 894.5 billion HKD, surpassing the total net purchase for the entire year of 2024 by 111% [2] - Southbound capital has seen net inflows for three consecutive trading days, with significant purchases in Tencent, Alibaba, and Xiaomi [2] - There has been a notable increase in investor inquiries regarding Hong Kong Stock Connect business this year [2] Group 3: RWA Registration Platform Launch - The RWA registration platform has officially launched in Hong Kong, initiated by the Hong Kong Web3.0 Standardization Association, aiming to facilitate the entire process of RWA asset tokenization [3] - Three Web3.0 standards have been established, including guidelines and technical specifications for RWA tokenization [3] Group 4: Central Bank Operations - The People's Bank of China will conduct a 700 billion CNY reverse repurchase operation on August 8, with a term of three months, to maintain ample liquidity in the banking system [4] Group 5: U.S. Manufacturing Sector Challenges - U.S. manufacturing is facing ongoing pressure due to uncertainties from tariff policies, with economic activities related to manufacturing shrinking since Trump's administration [5] - The ISM reported a manufacturing PMI of 48% for July, indicating contraction, while the unemployment rate has risen and job creation has fallen short of expectations [5] Group 6: Semiconductor Industry Update - Semiconductor manufacturer SMIC reported a 1.7% decline in Q2 sales revenue to 2.209 billion USD, with a projected revenue growth of 5% to 7% for Q3 [7] - The company achieved a 22% year-on-year increase in sales revenue for the first half of the year, with a gross margin improvement [7] Group 7: Central Bank Gold Reserves - The People's Bank of China has increased its gold reserves for nine consecutive months, with a total of 739.6 million ounces as of the end of July [9] - The central bank's strategy aims to diversify its foreign exchange reserves away from the U.S. dollar [9] Group 8: Early Childhood Education Funding - The Ministry of Finance is committed to supporting local governments in improving early childhood education funding mechanisms, emphasizing the importance of increased investment [8] - Recent government meetings have reiterated the need for sustained financial support for the development of early childhood education [8]
新款航天服、健身器材……天舟九号“太空包裹”里装了啥?
Group 1: Key Features of Tianzhou-9 Cargo Spaceship - Tianzhou-9 is the fourth cargo spaceship in the application and development phase of the space station, tasked with delivering supplies to the Shenzhou-20 and Shenzhou-21 crews, with a total payload of approximately 6.5 tons [1][3] - This mission marks the largest cargo load since Tianzhou-6, with the cargo compartment fully packed and some items protruding [3] - Tianzhou-9 is the first cargo spaceship capable of emergency launch within three months, enhancing its operational flexibility [5] Group 2: Technological Improvements - The spaceship employs a rapid rendezvous and docking mode that has evolved from 2 days to a fixed 3-hour model, optimizing resource use and ensuring reliable docking [7] - It features a relay terminal that can autonomously capture and track the Tianlian relay satellites, maintaining real-time two-way communication throughout the delivery process [7] Group 3: New Extravehicular Suits - Tianzhou-9 carries two new models of extravehicular suits, designated D and E, which have undergone optimization based on previous flight data and ground experiments [9] - The lifespan of the new suits has been improved from 3 years and 15 missions to 4 years and 20 missions, indicating enhanced durability and performance [11] Group 4: Core Muscle Training Device - A new core muscle training device, weighing approximately 130 kg, is included in the cargo to support astronauts during long-duration missions, addressing issues like muscle atrophy and cardiovascular decline [15][19] - The device utilizes gas as a resistance source, allowing astronauts to perform exercises that target core muscles effectively in microgravity conditions [19][21]
金十图示:2025年06月17日(周二)新闻联播今日要点
news flash· 2025-06-17 13:31
Group 1 - The successful zero-height escape flight test of the "Dream Boat" manned spacecraft marks a significant breakthrough in China's manned lunar exploration program [5][6] - The test was conducted at the Jiuquan Satellite Launch Center, with the spacecraft achieving a safe separation from the escape tower and landing successfully [4][5] - The development of the Long March 10 rocket and lunar lander for the manned lunar exploration mission is progressing steadily, with related tests planned [6] Group 2 - The third Chain Expo will be held from July 16 to 20 in Beijing, featuring over 650 domestic and foreign enterprises and institutions [7] - The expo will include a new innovation chain section and the launch of a global supply chain index matrix, with over 100 new products expected to debut [7] - More than 35% of the exhibitors will be from overseas, and over 65% will be from Fortune 500 and industry-leading companies [7]