电力工程建设

Search documents
系统打好改革组合拳 中国能建安徽电建二公司连续三年荣膺国资委“双百企业”“标杆”评价
Zhong Guo Jin Rong Xin Xi Wang· 2025-07-11 11:35
Core Viewpoint - The State-owned Assets Supervision and Administration Commission (SASAC) has recognized China Energy Construction Anhui Electric Power Construction No. 2 Company as a "benchmark" enterprise for the third consecutive year in the 2024 special assessment of the "Double Hundred Action" initiative, highlighting its significant achievements in reform and growth since its selection in 2018 [1][2]. Group 1: Company Performance - The company has achieved remarkable growth in key financial metrics, with average annual growth rates of 34.09% in new contract amounts, 18.76% in operating income, 20.93% in total profit, and 21.63% in net profit since the 14th Five-Year Plan began, effectively meeting its doubling target ahead of schedule [1]. - The company is set to successfully achieve Group 2.0 quality improvement in 2024, demonstrating the effectiveness of its reforms [1]. Group 2: Governance and Management - The company has optimized its governance mechanism by enhancing the "three meetings and one layer" operational framework, updating the decision-making matters list, and improving the effectiveness of the Party committee's preliminary research [2]. - The company has maintained a 100% rate in public recruitment, key position competition, and overall performance evaluation, while expanding market-oriented management practices to senior executives and permanent secondary institution leaders [2]. Group 3: Future Focus - The company aims to leverage its recognition as a benchmark to further enhance its core competitiveness and functions, focusing on technological innovation, industrial development, and safety assurance, with the goal of becoming a leading international engineering company [3].
无人机秦岭“绣”电网
Huan Qiu Wang· 2025-07-07 00:57
Core Viewpoint - The article highlights the construction and significance of the Huangjinxia Water Conservancy Hub, which is a key component of the Yinhang-Jiwei project, providing multiple functions such as water supply and power generation [1][2]. Group 1: Project Overview - The Huangjinxia Water Conservancy Hub has a total storage capacity of 221 million cubic meters and an annual water supply capacity of 1 billion cubic meters, with a power station installed capacity of 135,000 kilowatts [1]. - The project aims to connect two 110 kV lines from the hub to the 330 kV Yangxian substation to meet energy consumption and regional grid upgrade needs [1]. Group 2: Construction Techniques - The construction utilizes drone technology for line laying, which significantly reduces time and labor compared to traditional manual methods, allowing for completion of tasks in minutes instead of days [2]. - The project involves the construction of 83.71 kilometers of new lines and 216 towers, with significant progress reported as of June 30, including the assembly of 108 towers and a total line length of 42.375 kilometers [2]. Group 3: Impact on Local Economy - The Huangjinxia Water Conservancy Hub's power generation will contribute to the regional grid, addressing the single power supply issue in Foping County and providing strong green energy support for economic and social development [2].
中企参建的沙特国王港项目陆域工程全面完成
news flash· 2025-07-02 10:22
Core Viewpoint - Saudi Aramco and China Electric Power Construction Group Shandong Company celebrated the completion of land works for the King Salman International Port project, which is a key part of Saudi Arabia's Vision 2030 [1] Group 1: Project Overview - The King Salman Port project is located in the Ras Al Khair Industrial City in the Eastern Province of Saudi Arabia and was personally inaugurated and named by King Salman [1] - The project is a joint investment between Saudi Aramco and IMI International Port Company, with the main contract for sections P4-P5-P6 exceeding $3 billion [1]
新疆首个户内GIS超高压工程开工
Zhong Guo Dian Li Bao· 2025-06-30 06:27
Core Viewpoint - The construction of the Shisanjianfang 750 kV substation project in Xinjiang is a significant initiative aimed at enhancing the region's power infrastructure and facilitating the integration of renewable energy sources [1][2] Group 1: Project Overview - The total investment for the Shisanjianfang 750 kV substation project is 1.326 billion yuan [1] - The project includes the installation of three sets of 1.5 million kVA transformers and the construction of 23.2 kilometers of new 750 kV transmission lines [1] - The project is expected to be completed and operational by December 2026 [2] Group 2: Strategic Importance - The project will optimize the 220 kV power grid structure in western Hami and alleviate power transmission bottlenecks [2] - It will accommodate an additional 7.7 million kW of renewable energy access, significantly increasing the region's energy consumption capacity [2] - The project is positioned to support the development of large-scale pumped storage power stations, thereby boosting the renewable energy sector in Xinjiang [2] Group 3: Technological Innovation - The project employs the first indoor GIS layout in Xinjiang, placing core substation equipment indoors to enhance operational safety in challenging environmental conditions [1] - This innovative approach offers advantages such as reduced land use, higher reliability, easier maintenance, and stronger resistance to electromagnetic interference compared to traditional outdoor layouts [1]
中国电建:2025年1-5月新签合同金额4740.07亿元
news flash· 2025-06-20 07:37
Core Insights - China Power Construction (601669) announced that from January to May 2025, the company signed 3,501 new projects with a total contract value of 474.007 billion yuan, representing a year-on-year decrease of 0.93% [1] Contract Value Breakdown - The new contract value for energy and power reached 301.248 billion yuan, showing a year-on-year increase of 4.44% [1] - The new contract value for hydropower was 65.387 billion yuan, reflecting a significant year-on-year increase of 60.66% [1] - The new contract value for wind power amounted to 101.801 billion yuan, with a year-on-year growth of 67.33% [1] - The new contract value for solar power was 85.481 billion yuan, indicating a year-on-year decline of 32.61% [1] - The new contract value for water resources and environment reached 60.796 billion yuan, down 17.06% year-on-year [1] - The new contract value for urban construction and infrastructure was 101.711 billion yuan, marking a year-on-year increase of 4.71% [1] Domestic vs. International Contracts - The domestic new contract value totaled 377.608 billion yuan, which is a year-on-year decrease of 6.67% [1] - The international new contract value was 96.399 billion yuan, showing a year-on-year increase of 30.51% [1]
中国能建广东火电违规被罚
Qi Lu Wan Bao· 2025-06-19 07:20
Group 1 - The company China Energy Construction Group Guangdong Thermal Power Engineering Co., Ltd. was fined 50,000 yuan for safety violations at the construction site of the Jingneng Mengxi Linggai 1018MW renewable energy project [1] - The violations included the lack of hard cover plates and safety guardrails for eight excavation holes, as well as the absence of clear safety warning signs [1] - The company is a key enterprise of China Energy Construction Group, established in 1956, with assets exceeding 10 billion yuan and over 20 billion yuan in bank credit [1] Group 2 - The company holds various qualifications including special grade for power engineering construction, first-grade for construction in building, municipal, and mechanical and electrical engineering, as well as qualifications for environmental and nuclear engineering [2] - It is capable of undertaking projects in traditional energy (gas, coal, hydro, and transmission), nuclear power, renewable energy (offshore and onshore wind, solar, energy storage, hydrogen), and municipal infrastructure [2] - The company has completed over 300 large and medium-sized projects domestically and internationally, with a total installed capacity exceeding 130 million kilowatts, operating in various provinces in China and over 20 countries abroad [2]
中国能建年内五度中标累计405.6亿 开拓市场净利四连增总资产9045.8亿
Chang Jiang Shang Bao· 2025-06-17 23:40
Core Viewpoint - China Energy Engineering Group (China Energy) has achieved significant project wins, with a total contract value of approximately 405.64 billion yuan in 2025, indicating strong market performance and growth potential [2][5]. Group 1: Project Wins - On June 16, China Energy announced it won the EPC contract for the Jiangyin Sulong 2×66 MW Phase IV expansion project, valued at approximately 50.0508 million yuan [3]. - The project involves the construction of two 660 MW ultra-supercritical coal-fired power units, with a total construction period of about 22 months [3]. - Since the beginning of 2025, China Energy has disclosed five major project wins, contributing to a total contract value of 405.64 billion yuan [5]. Group 2: Financial Performance - China Energy's total assets have grown significantly, from 4,761 billion yuan at the end of 2020 to 9,045.8 billion yuan by the end of Q1 2025 [5]. - The company has reported continuous growth in revenue and net profit for four consecutive years, with 2024 figures showing a revenue of 436.71 billion yuan and a net profit of 83.96 billion yuan, representing year-on-year increases of 7.56% and 5.13%, respectively [7][8]. - In Q1 2025, the company achieved new contract signings of 388.90 billion yuan, revenue of 100.37 billion yuan, and a net profit of 1.61 billion yuan, all marking historical highs for the same period [8]. Group 3: Innovation and R&D - China Energy has established a robust innovation framework, with over 14 post-doctoral research stations and 143 high-tech enterprises, leading to significant technological advancements [7]. - The company has consistently increased its R&D expenditure, surpassing 10 billion yuan annually since 2022, with 2025 Q1 R&D expenses growing by 31.80% to 2.13 billion yuan [7]. Group 4: Market Position and Expansion - China Energy has maintained a strong global presence, ranking among the top in various international engineering and construction lists, with operations in over 140 countries [6]. - The company has been proactive in expanding its market reach, evidenced by its recent project wins both domestically and internationally [4][5].
中国能建浙江火电被罚:安全设备的安装等不符合国家或行业标准
Qi Lu Wan Bao· 2025-06-16 23:15
Core Viewpoint - China Energy Construction Group Zhejiang Thermal Power Construction Co., Ltd. has recently been penalized for safety violations related to the installation, use, testing, modification, and decommissioning of safety equipment [1][2] Group 1: Penalty Information - The company was fined 20,000 RMB for failing to meet national or industry standards regarding safety equipment [2] - The penalty was issued by the Central China Energy Regulatory Bureau, with the decision document number Huazhong Jian Neng Fa Jue Zi [2025] No. 29 [2] - The penalty execution status is reported as normal [2] Group 2: Previous Violations - On September 24 of the previous year, the company received another fine of 100,000 RMB for multiple violations during the construction of the Honghe Power Plant expansion project, including inadequate safety measures [3] - In July of the previous year, the company was fined 6,194,289.74 RMB for not following engineering design drawings in the Qingyuan Baihuayan Wind Power Project [3] Group 3: Company Overview - China Energy Construction Group Zhejiang Thermal Power is a key member of the state-owned China Energy Construction Group, established in 1982 with a registered capital of 100.5 million RMB [6] - The company specializes in various sectors, including traditional power energy, renewable energy, ecological protection, water conservancy, comprehensive transportation, municipal projects, real estate, and equipment manufacturing [5] - As of 2022, the company has completed a total installed capacity of over 108,768.9 MW, with conventional power projects accounting for 103,133.43 MW and renewable energy projects totaling 5,635.47 MW [5]
中国能建:中标50.0508亿元江阴苏龙项目
news flash· 2025-06-16 09:05
Group 1 - The company, China Energy Engineering Corporation (601868), announced that its subsidiary, Jiangsu Electric Power Design Institute Co., Ltd., has led a consortium that won the bid for the Jiangyin Sulong 2×660MW Phase IV Expansion Project EPC contract, with a bid amount of approximately 5.00508 billion RMB [1] - The project involves the construction of two 660MW ultra-supercritical, reheat coal-fired power generation units, along with the installation of flue gas desulfurization and denitrification devices [1] - The total construction period for the project is approximately 22 months, but the contract has not yet been formally signed, indicating some uncertainty regarding the project [1]
湖北一山上现“银龙”盘旋:“宁电入湘”铁塔绵延数十公里,有的在悬崖边
Huan Qiu Wang· 2025-06-16 06:48
转自:潇湘晨报 在山顶搭帐篷居住,奋战1个半月完成建塔 记者 | 於广强 "这些铁塔好大,看起来就像一条巨龙。"6月13日,在湖北巴东县一山上,游客李女士看着眼前的风景,赞叹不已。 这幅"巨龙"风景,是"宁电入湘"工程湖北段线路上特有的风光之一。湖北段线路长189.8公里,全部在海拔一两千米的崇山峻岭中。 "景色很美,但建设难度也大。"鄂2标段项目经理熊梓奥表示,在约1年半时间中,他们克服了山区施工特有的困难,在今年3月实现湖北段全线贯通。目 前线路正在调试,不久后就能投用。 山间"银龙盘旋"颇壮观,吸引游客打卡 6月13日早上,潇湘晨报记者跟随"宁电入湘"工程采访团,前往湖北巴东县线路段探访。当车进入巴东县后,只见两边都是绿油油的山丘,一座连着一 座,显出勃勃生机。 中午时分,记者来到位于水布垭镇围龙坝村附近的N3900号铁塔。此处视野开阔,可以看到一座座铁塔由近及远,在山间绵延数十公里,消失在远处。同 时,该塔下方为当地有名的清江,此处也可以看江景。 "这些铁塔好大,看起来就像一条巨龙。"在周边游玩的李女士介绍,这里本来就是一个很美很凉快的地方,很多人夏天来此避暑。这些高压塔线构成 的"银龙"也是一道独特 ...