卡姆巴拉塔1号水电站
Search documents
卡姆巴拉塔1号水电站项目融资工作持续推进
Shang Wu Bu Wang Zhan· 2025-10-24 16:48
Core Viewpoint - The Kyrgyzstan Ministry of Energy is exploring financing options for the Kambarat-1 hydropower project, with around 10 international financial institutions expressing interest in providing funding [1] Financing Details - The project requires approximately $1.5 billion in external financing if the local funding contribution is 34% [1] - Various funding proposals totaling $3.1 billion have been presented, including grants and concessional loans with repayment periods exceeding 20 years [1] - The Ministry is particularly interested in the financing proposals from the Asian Development Bank, the Italian Development Bank, and the Islamic Development Bank [1] Project Viability - The Kambarat-1 hydropower station is expected to be self-sustaining and will not receive state subsidies [1] - The profitability of the project has been recognized by various financial institutions [1]
卡姆巴拉塔1号水电站项目有望获得15亿美元贷款支持
Shang Wu Bu Wang Zhan· 2025-10-24 16:48
Core Insights - The European Bank for Reconstruction and Development (EBRD) is considering providing a $1.5 billion loan for the Kambaratinskaya-1 hydropower project, which will be implemented in three phases of $500 million each [1] Group 1 - The EBRD President, Odile Renaud-Basso, confirmed the potential loan during an interview with Reuters [1] - The funding aims to support the development of the Kambaratinskaya-1 hydropower station in Kyrgyzstan [1] - The project is expected to enhance the energy infrastructure in the region [1]