Workflow
收费系统
icon
Search documents
湾区发展(00737):广深珠公司与广东新粤订立机电工程施工合同(JD1标段)
智通财经网· 2025-09-26 09:41
2. 与北京公科飞达订立机电工程施工合同(JD2标段),签约合同价为人民币2.89亿元。 机电工程施工合同(JD1标段)标的事项为广东新粤(作为承建商)将承接自 K2+270起始至 K71+130.658终 止(不含萝岗立交范围、新塘立交范围、火村和新联互通枢纽范围),总长度约 68.861 公里路段的收费系 统、监控系统和通信系统的施工,以及通信管道工程,并统筹机电系统的联合调试和测试。 机电工程施工合同(JD2标段)标的事项为北京公科飞达(作为承建商)将承接自K2+270起始至 K71+130.658 终止(不含萝岗立交范围、新塘立交范围、火村和新联互通枢纽范围),总长度约 68.861 公 里路段的供配电(含外供电)及照明系统的施工。 高速公路的投资、建设、营运和维护为集团的主要业务之一。订立机电工程施工合同(JD1及JD2标段)为 实施经批准路段改扩建项目的一部分。实施经批准路段改扩建项目,将有助于提升经批准路段的通行能 力和服务水平,壮大集团在收费公路行业的核心竞争力,符合集团的发展战略。 1. 与广东新粤订立机电工程施工合同(JD1标段),签约合同价为人民币4.22亿元;及 智通财经APP讯,湾区 ...
建行山东省分行扎实落实黄河重大国家战略 40亿元,金融护航济南“穿黄”起势
Qi Lu Wan Bao· 2025-07-09 10:54
Core Viewpoint - The article highlights the significant infrastructure developments in Jinan, particularly the construction of multiple tunnels and bridges across the Yellow River, which are crucial for the city's urban expansion and connectivity [1][2][4]. Infrastructure Development - The Jinan government has initiated the construction of four tunnels and four bridges across the Yellow River, with all four bridges already completed and operational [1]. - The Jinan Huanghe Jiluo Road Tunnel, one of the key projects, has an average daily traffic capacity of 15,000 vehicles [1]. - The Jiluo Road North Extension Tunnel, a subsequent project, is 4.3 kilometers long and is expected to significantly reduce travel time between the main urban area and the new development zones to just 8 minutes [2]. Financial Support - The Construction Bank of Shandong Province has provided substantial financial backing for these projects, approving a total of 40 billion yuan in fixed asset loans, with 36.42 billion yuan already disbursed [1]. - For the Jiluo Road North Extension Tunnel, the total investment is 66.28 billion yuan, with the Construction Bank quickly mobilizing to create a financing plan to meet urgent funding needs [2][3]. - The bank has also approved 20 billion yuan in basic construction loans for the tunnel projects, demonstrating a strong commitment to supporting infrastructure development [3]. Technological Advancements - The construction of the Yellow River Crossing Tunnel has utilized the world's largest diameter underwater shield tunneling machine, which has successfully completed the excavation of the Yellow River section [4]. - This machine, named "Shanhe," features an intelligent system that allows for efficient operation with a minimal workforce [4]. Future Prospects - The Jinan Aerospace Avenue Tunnel, the last of the four tunnels to commence construction, is designed to connect key areas including the airport and logistics zones, enhancing the region's transportation network [6]. - The total investment for this tunnel is 61 billion yuan, with a diversified funding structure involving bank loans, special bonds, and self-raised funds [6]. - The Construction Bank is also involved in the project's operational management by participating in the toll system development, which will further stimulate regional economic growth [6]. Economic Impact - As of May, the Construction Bank's public loan balance for the nine cities along the Yellow River in Shandong Province reached 398.66 billion yuan, reflecting a year-to-date increase of 47.6 billion yuan and a growth rate of 13.6% [7].