Workflow
显示用PI成品材料
icon
Search documents
万润股份:正筹备万润工业园二期C05项目 包含约700吨显示用PI成品材料产能
人民财讯9月18日电,万润股份(002643)9月18日于互动平台表示,公司结合自身情况与下游需求,正 在筹备万润工业园二期C05项目,该项目包含约700吨的显示用PI成品材料产能,未来建成后将为公司 显示用PI成品材料发展提供产能支撑。 ...
万润股份:公司正在筹备万润工业园二期C05项目,该项目包含约700吨的显示用PI成品材料产能
Mei Ri Jing Ji Xin Wen· 2025-09-18 09:14
万润股份(002643.SZ)9月18日在投资者互动平台表示,公司结合自身情况与下游需求,正在筹备万润 工业园二期C05项目,该项目包含约700吨的显示用PI成品材料产能,未来建成后将为公司显示用PI成品 材料发展提供产能支撑。 每经AI快讯,有投资者在投资者互动平台提问:公司OLED材料竞争对手奥来德最新定增计划显示将投 入大笔资金在"OLED 显示核心材料 PSPI 材料设备和产能",请问公司PSPI布局多少吨产能?随着国内 8.6 代 OLED 大尺寸面板产线的建设开启,公司能否抓住此次市场机遇? (记者 王晓波) ...
万润股份:PEEK材料已有中试产品产出,并向多家下游送样
Ju Chao Zi Xun· 2025-09-18 09:07
Core Viewpoint - The company has made progress in the development of polyether ether ketone (PEEK) materials, with pilot production already achieved and a capacity of approximately 100 tons established for further market promotion and verification [2] Group 1: Production and Capacity Expansion - The company is actively promoting and verifying its PEEK materials, having sent samples to multiple downstream clients [2] - The company is preparing for the second phase of the Wanrun Industrial Park, which includes a planned capacity of approximately 700 tons for display-use polyimide (PI) finished materials [2] - The project is expected to require an initial investment of 287 million yuan to expand the production capacity of photolithography-related materials and display-use polyimide materials by 1,451 tons [2] Group 2: Financial Performance - In the first half of the year, the company achieved a main operating revenue of 1.87 billion yuan, a year-on-year decrease of 4.42% [2] - The net profit attributable to the parent company was 218 million yuan, reflecting a year-on-year increase of 1.35% [2] - The net profit excluding non-recurring gains and losses was 209 million yuan, which represents a year-on-year increase of 6.9% [2]
万润股份(002643.SZ):正在筹备万润工业园二期C05项目
Ge Long Hui· 2025-09-18 08:08
Core Viewpoint - Wanrun Co., Ltd. is preparing the C05 project for the second phase of Wanrun Industrial Park, which will support the production capacity of display PI finished materials [1] Group 1 - The C05 project will include approximately 700 tons of production capacity for display PI finished materials [1] - The project is being developed in response to the company's own situation and downstream demand [1]