箱梁
Search documents
新质引擎丨看智能制造如何“挑大梁”
Ke Ji Ri Bao· 2026-01-26 06:16
Core Viewpoint - The construction of major transportation infrastructure projects in China is progressing smoothly during the 14th Five-Year Plan period, with a particular emphasis on bridge construction, where intelligent technology is significantly enhancing manufacturing efficiency and quality [1]. Group 1: Intelligent Manufacturing in Bridge Construction - The Ma City beam factory in Hubei Province utilizes an AI intelligent management system to achieve comprehensive intelligent control over production, personnel, quality, safety, technology, equipment, processes, and materials [2]. - The intelligent management system improves temperature monitoring during concrete pouring, allowing for real-time data collection and analysis, which helps maintain quality standards [3]. - The factory has achieved a 90% connectivity rate for key equipment, reducing the time to produce a box beam by 42 hours and the number of workers required from 120 to 77 [3]. Group 2: Advanced Equipment Utilization - The introduction of intelligent equipment, such as robotic arms and smart CNC bending machines, has improved production efficiency by over 30% while ensuring precision in steel reinforcement processing [4]. - The use of integrated robotic systems for concrete surface treatment has streamlined operations, significantly enhancing efficiency compared to traditional methods [5]. - The Ma City beam factory has over 40 sets of intelligent equipment, with more than 80% of construction equipment being automated and intelligent [5]. Group 3: Green and Low-Carbon Transformation - The factory employs intelligent temperature and humidity control systems to optimize concrete curing, reducing water usage by 16 cubic meters per single beam compared to traditional methods [6][7]. - Wastewater generated during production is recycled and treated for reuse, achieving zero wastewater discharge [7]. - Overall, the implementation of advanced intelligent equipment and systems has led to a 30% increase in production efficiency, a 25% improvement in product quality, and a 10% reduction in overall energy consumption [7].
通苏嘉甬铁路常熟段首榀箱梁完成架设
Su Zhou Ri Bao· 2025-11-02 00:23
Core Viewpoint - The construction of the Tongsu-Jiaxing-Ningbo Railway's Changshu section has progressed to the box girder erection phase, marking a significant milestone in the project [1] Group 1: Project Details - A 720-ton box girder was successfully erected on the Su-Yu Grand Bridge, specifically between piers 445 and 446, with dimensions of 32.6 meters in length and 12.6 meters in width [1] - The box girder was prefabricated at the Xiangcheng Beam Factory, which utilizes advanced technologies such as AI, IoT, and the Internet to enhance production efficiency and safety [1] - The Xiangcheng Beam Factory has a maximum monthly production capacity of 96 girders and can store up to 106 girders at a time [1] Group 2: Safety and Management - China Railway Guangzhou Engineering Bureau adhered to strict safety management protocols and developed scientific plans for equipment handling and transportation to ensure the successful erection of the box girder [1] - As of now, a total of 81 box girders have been erected since the first one was successfully placed on July 14 of this year [1] Group 3: Strategic Importance - The Tongsu-Jiaxing-Ningbo Railway is a crucial part of the national high-speed railway network and serves as a key component of the coastal railway passenger transport corridor [1] - This railway will enhance the connectivity of the Yangtze River Delta's transportation network by linking with several existing rail lines, thereby improving the overall infrastructure in the region [1]
通过认证!潍宿高铁至青岛连接线1标青岛制梁场进入批量生产阶段
Qi Lu Wan Bao· 2025-05-27 01:39
Core Viewpoint - The Qingdao beam yard, constructed by China Railway 10th Bureau Group Co., Ltd., has successfully passed the production license certification, marking its entry into large-scale and batch production, which supports the timely progress of the Weishui High-speed Railway project [1][9]. Group 1: Project Overview - The Qingdao beam yard is located in Wangtai Town, Huangdao District, covering an area of 174.6 acres and is responsible for the prefabrication and erection of 711 box beams along the line [3]. - The yard is designed with 10 beam casting platforms and 54 beam storage platforms, with a maximum monthly production capacity of 60 beams and a storage capacity of 106 beams [3]. Group 2: Construction and Quality Control - The project team adheres to the "lean construction" philosophy, implementing standardized management and technological innovation to ensure the quality of the box beams [5]. - A standardized operating process has been established, and smart equipment such as digital mixing stations and welding robots have been introduced to create an intelligent management platform for the entire production process [5]. Group 3: Certification Process - The expert group conducted a comprehensive inspection of the beam yard, focusing on the dimensional accuracy and appearance quality of finished beams, raw material testing, and the operational status of machinery [7]. - The expert group unanimously agreed that the construction site is well-planned, equipped with complete production facilities, and has a high level of automation, confirming the yard's capability for batch production [9]. Group 4: Strategic Importance - The Weishui High-speed Railway to Qingdao connection line is part of the national "eight vertical and eight horizontal" high-speed rail network, expected to be completed by the end of June 2028 [11]. - Upon completion, the project will enhance the rapid transit corridor for Qingdao, strengthening its position as a railway hub and improving the accessibility of the national high-speed rail network, thereby contributing to regional economic development [11].