Workflow
米拉多铜矿
icon
Search documents
铜陵有色:目前铜陵有色金属集团股份有限公司持有中铁建铜冠70%股权
Zheng Quan Ri Bao· 2025-12-30 12:07
证券日报网讯 12月30日,铜陵有色在互动平台回答投资者提问时表示,中铁建铜冠投资有限公司其境 外子公司EcuacorrienteS.A.系米拉多铜矿主要经营主体。目前,铜陵有色金属集团股份有限公司持有中 铁建铜冠70%股权。米拉多铜矿二期扩建项目于2025年7月开始重负荷试车。具体相关情况请以公司在 法定信息披露平台的公告为准。 (文章来源:证券日报) ...
铜陵有色:目前,铜陵有色金属集团股份有限公司持有中铁建铜冠70%股权
Mei Ri Jing Ji Xin Wen· 2025-12-30 09:24
Core Viewpoint - The company is responding to investor inquiries regarding the operational status and ownership of the Mirador copper mine, indicating that the mine's second phase is set to begin heavy load testing in July 2025, and it holds a 70% stake in the operating entity [2]. Group 1 - The Mirador copper mine's second phase expansion project is scheduled to start heavy load testing in July 2025 [2]. - The company holds a 70% equity stake in China Railway Construction Copper Crown Investment Co., Ltd., which is the main operating entity of the Mirador copper mine [2]. - Investors are interested in the projected profits from the Mirador copper mine based on the average LME copper price for 2025, specifically for the year 2026 [2].
铜陵有色:公司米拉多铜矿二期扩建项目试车工作顺利进行,正进行轻载调试和相关系统参数进一步优化工作
Mei Ri Jing Ji Xin Wen· 2025-08-20 06:15
铜陵有色(000630.SZ)8月20日在投资者互动平台表示,截至目前,公司米拉多铜矿二期扩建项目试车 工作顺利进行,正在按既定方案进行轻载调试和相关系统参数进一步优化工作。 (文章来源:每日经济新闻) 每经AI快讯,有投资者在投资者互动平台提问:贵公司的米拉多铜矿二期重负试车后是否顺利?是否 己全面投产?如果没投产,预计几月投产? ...