苏布雷水电站
Search documents
“为科特迪瓦能源转型和经济增长作出重要贡献”
Ren Min Wang· 2025-11-25 22:38
Core Insights - The construction of the Gessibo-Boboli Hydropower Station in Côte d'Ivoire by China Power Construction Group is a significant step towards meeting the local electricity demand and promoting green transformation [2][3] - The project is part of a larger initiative to develop the Sassandra River basin, which has been a long-standing goal for the Ivorian government since the 1970s [3] - The hydropower station is expected to add approximately 550 million kilowatt-hours of clean electricity annually, increasing the share of hydropower in the energy mix to 33% [3] Energy Demand and Structure - The Gessibo-Boboli Hydropower Station is the second hydropower project constructed by Chinese enterprises in the Sassandra River basin, following the successful commissioning of the Soubré Hydropower Station in 2017 [3] - The Soubré Hydropower Station has generated over 11 billion kilowatt-hours of electricity, providing stable and green power for Côte d'Ivoire's economic development [3] - The new hydropower station will help balance the country's energy structure, which has been predominantly reliant on thermal power [3] Employment and Local Development - The construction of the Gessibo-Boboli Hydropower Station has created approximately 2,000 direct jobs, with around 1,300 jobs in the core construction phase and nearly 1,000 indirect jobs [5] - Local workers have been trained and promoted to various technical positions, contributing to the high-quality completion of the project [5] - The project aims to provide a growth platform for local workers, fostering the development of qualified technical talent [5] Training and Capacity Building - The collaboration between China Power Construction Group and the Ivorian Energy Company has focused on training local operation and maintenance personnel [6] - Local teams have gained proficiency in operating digital monitoring systems for the hydropower stations, enhancing their technical capabilities [6] - The successful operation of the Soubré Hydropower Station has provided valuable experience for the ongoing and future projects in the Sassandra River basin [6] Future Prospects - The Ivorian government has entrusted additional hydropower projects in the Sassandra River basin to China Power Construction Group, indicating confidence in their capabilities [6] - The ongoing collaboration is expected to yield further economic growth and energy transformation in Côte d'Ivoire [6]
中企积极参与科特迪瓦萨桑德拉河流域梯级开发——“为科特迪瓦能源转型和经济增长作出重要贡献”
Ren Min Ri Bao· 2025-11-25 22:10
在科特迪瓦西南部的萨桑德拉河上,一道绵延4.2公里的水坝横亘在河面上。水坝中央坐落着一栋灰白 色调的发电厂房,伴随发电机组的轰鸣声,清洁电力源源不断地被送出。这座崭新的水电站是由中国电 力建设集团(以下简称"中国电建")承建的格西波—波波里水电站(以下简称"波波里水电站")。 近年来,中国电建积极参与萨桑德拉河流域梯级开发,建造多个水电站项目,不仅满足当地日益增长的 电力需求,推动绿色转型,还培养了一批优秀的水电技术人才,为当地经济社会发展提供助力。 满足电力需求,改善能源结构 萨桑德拉河流域的梯级开发承载着科特迪瓦民众近半个世纪的期盼。 早在上世纪70年代,科特迪瓦政府就提出在萨桑德拉河流域开发水电的构想,但种种原因导致这一规划 迟迟未能付诸实践。中国电建的到来改变了这一局面。2017年11月,总装机容量达275兆瓦的苏布雷水 电站建成投运,实现了科特迪瓦人民长久以来的梦想。2018年,中国与科特迪瓦建交35周年之际,苏布 雷水电站作为中科务实合作的标志性工程,被印到科特迪瓦的纪念邮票上。票面上,苏布雷水电站大坝 巍然耸立,湍急的水流从闸口倾泻而出。截至目前,该水电站已累计发电超110亿千瓦时,为科特迪瓦 ...