7000TEU集装箱船
Search documents
中铁四局:7000TEU集装箱船工程建造项目首船发运
Zhong Guo Jing Ji Wang· 2025-12-24 14:41
Core Viewpoint - The successful shipment of the first non-water-tight compartment segment of a 7000TEU container ship project by China Railway Fourth Group marks a significant milestone for the construction of subsequent ship segments and highlights the importance of this project for local industry upgrades and high-end shipbuilding development [1] Group 1: Project Details - The container ship is designed specifically for standardized container transportation, featuring large hatches, gridded cargo holds, and multi-layered deck stacking to meet the demands of rapid loading and unloading as well as large-scale maritime transport [1] - The transverse compartment is a core structure of the container ship, divided into water-tight and non-water-tight compartments, with guiding rails installed at both ends for loading and unloading operations as well as securing during navigation [1] Group 2: Economic Impact - The successful shipment of the first segment is expected to promote local industrial upgrades, drive the development of high-end shipbuilding industry clusters, and create job opportunities while advancing technological progress [1]
从“建桥”到“造船” 中铁四局承建7000TEU集装箱船首段成功发运
Ke Ji Ri Bao· 2025-12-22 07:46
Core Insights - The construction project of a 7000TEU container ship, undertaken by China Railway Fourth Group, has reached a significant milestone with the successful dispatch of the first non-water-tight bulkhead segment, marking the ship's entry into the rapid segment construction phase [1][4] Group 1: Project Details - The dispatched non-water-tight bulkhead segment measures 36 meters in length, 22 meters in width, 1.9 meters in height, and weighs 240 tons, serving as a core component of the container ship's structure [3] - Container ships are designed for efficient loading and unloading, featuring large hatches, gridded cargo holds, and multi-layered deck stacking, making them the mainstay of modern maritime transport [3] Group 2: Technical Innovations - The project team has integrated large-scale steel structure precision control experience from bridge manufacturing into shipbuilding processes, optimizing positioning tools and support settings to achieve precise and rapid positioning of bulkhead components [3] - Various specialized techniques, including flame adjustment, segment flipping, external structural pressure, and ship-specific welding, have been implemented to address technical challenges related to deck flatness and assembly complexity [3] Group 3: Equipment Development - To support large-scale segment hoisting and modular shipbuilding, China Railway Fourth Group has developed a 1000-ton gantry crane at the base, which features a dual main beam design and multiple functionalities for lifting, longitudinal, and lateral movement [4] Group 4: Strategic Implications - The successful dispatch of the first segment reflects advancements in high-value ship manufacturing processes and project management capabilities in China, contributing positively to local industrial upgrades and the aggregation of high-end shipbuilding clusters [4] - This project aligns with national strategies for becoming a "maritime power" and a "manufacturing power," injecting new momentum into the autonomous and modern development of China's shipping logistics equipment [4]
中船集团外高桥造船超额完成年度交船目标
Zhong Guo Xin Wen Wang· 2025-12-01 10:21
Core Viewpoint - The successful delivery of the 158,000-ton Suez-type oil tanker "SEA POLARIS" marks a significant achievement for the Shanghai Waigaoqiao Shipbuilding Company, contributing to the company's overall performance in shipbuilding and enhancing its reputation in the industry [1][3]. Group 1: Delivery Achievements - The company has delivered a total of 29 vessels by 2025, achieving a cumulative deadweight tonnage of 2.7065 million tons, exceeding its target by 7 vessels [1]. - The delivered vessels include 19 units of 114,000-ton Aframax product tankers, 2 units of 158,000-ton Suez-type oil tankers, 7 PCTC (Pure Car and Truck Carrier) vessels, and 1 unit of 7000 TEU container ship [1]. Group 2: Efficiency and Innovation - The company has established a stable and efficient batch construction rhythm for oil tankers, with a dock cycle successfully controlled at around 78 days and the period from undocking to trial voyage compressed to 40-45 days [3]. - Innovations such as "total segment shaft installation" and "main engine load testing before undocking" have significantly improved construction efficiency and safety [3]. - The integration of digital management with construction processes has led to the development of an information system for real-time monitoring and closed-loop management of process nodes, enhancing overall project management efficiency [3]. Group 3: Environmental Initiatives - The company is contributing to the global shipping industry's green and low-carbon transformation by delivering the world's first wind-assisted Aframax product tanker, which integrates traditional wind power with modern navigation technology [3]. Group 4: Progress in Large Cruise Ship Construction - The second domestically produced large cruise ship project (H1509) is progressing steadily, with the project team effectively managing the construction rhythm and optimizing multi-disciplinary collaboration through digital tools [4]. - The project has achieved over 88% of the overall progress, with key milestones such as hull integration and floating completed with high quality, improving construction efficiency by 20% compared to the first ship (H1508) [5].