Workflow
GREENTECH INTL(00195)
icon
Search documents
绿科科技国际(00195):雷尼森项目第四季度锡产量为3319 吨,环比上升46.1%
智通财经网· 2026-01-29 14:30
智通财经APP讯,绿科科技国际(00195)发布公告,Bluestone Mines Tasmania 合营企业 (BMTJV) 的雷尼 森项目,其中 YT Parksong Australia Holding Pty Limited (YTPAH) 持50%权益,2025年10月至12月季度 (季度)的锡产量为 3319 吨,比上一季度的锡产量上升 46.1%。矿石开採品位为 2.34%,较上一季度上升 0.83 个百分点。季度平均回收率为 82.34%,比上一季度上升 5.95 个百分点。 ...
绿科科技国际:雷尼森项目第四季度锡产量为3319 吨,环比上升46.1%
Zhi Tong Cai Jing· 2026-01-29 14:26
绿科科技国际(00195)发布公告,Bluestone Mines Tasmania合营企业(BMTJV)的雷尼森项目,其中YT Parksong Australia Holding Pty Limited(YTPAH)持50%权益,2025年10月至12月季度(季度)的锡产量为 3319吨,比上一季度的锡产量上升46.1%。矿石开採品位为2.34%,较上一季度上升0.83个百分点。季度 平均回收率为82.34%,比上一季度上升5.95个百分点。 ...
绿科科技国际(00195.HK):BMTJV雷尼森项目四季度锡产量为3319吨 环比上升46.1%
Ge Long Hui· 2026-01-29 14:24
格隆汇1月29日丨绿科科技国际(00195.HK)宣布,Bluestone Mines Tasmania合营企业 (「BMTJV」) 之雷 尼森项目,2025年10月至12月季度 (「季度」)之生产数量。本季度锡产量为3,319吨,比上一季度的锡 产量上升46.1%。矿石开采品位为2.34%,较上一季度上升0.83个百分点。季度平均回收率为82.34%,比 上一季度上升5.95个百分点。 ...
绿科科技国际(00195) - 二零二五年十月至十二月季度之生產数量
2026-01-29 14:14
香港交易及結算所有限公司及香港聯合交易所有限公司對本公告之內容概不負責,對其準 確性或完整性亦不發表任何聲明,並表明不會就因本公告全部或任何部分內容而產生或因 依賴該等內容而引致之任何損失承擔任何責任。 GREENTECH TECHNOLOGY INTERNATIONAL LIMITED 綠科科技國際有限公司 (於開曼群島註冊成立之有限公司) (股份代號:00195) 本季度錫產量為 3,319 噸,比上一季度的錫產量上升 46.1%。礦石開採品位為 2.34%,較上一 季度上升 0.83 個百分點。季度平均回收率為 82.34%,比上一季度上升 5.95 個百分點。 請注意,本公告中的信息是摘錄自 BMTJV 內部管理記錄,並未經本公司之核數師審核或審 閱。 本公告乃承董事會之命而刊發,各董事願對本公告所載資料之準確性個別及共同承擔責任。 二零二五年十月至十二月季度之生產數量 本公告乃由綠科科技國際有限公司(「本公司」) 自願刊發。 本公司董事會 (「董事會」) 宣佈,Bluestone Mines Tasmania 合營企業 (「BMTJV」) 之雷 尼森項目,其中 YT Parksong Austral ...
绿科科技国际(00195.HK)拟1月30日举行董事会会议批准年度业绩
Ge Long Hui· 2026-01-20 13:09
格隆汇1月20日丨绿科科技国际(00195.HK)宣布,公司将于2026年1月30日(星期五)假座香港九龙尖沙咀 海港城港威大厦6座22楼2202-04室举行董事会会议,以(其中包括)考虑及批准公司及其附属公司截至 2024年12月31日止期间的已经审核年度业绩及其刊发,以及考虑是否建议派发末期股息(如有)。 ...
绿科科技国际(00195) - 董事会召开日期
2026-01-20 13:02
香港交易及結算所有限公司及香港聯合交易所有限公司對本公告之內容概不負責,對其準 確性或完整性亦不發表任何聲明,並表明不會就因本公告全部或任何部分內容而產生或因 依賴該等內容而引致之任何損失承擔任何責任。 1 GREENTECH TECHNOLOGY INTERNATIONAL LIMITED 綠科科技國際有限公司 (於開曼群島註冊成立之有限公司) (股份代號:00195) 董事會召開日期 茲提述綠科科技國際有限公司(「本公司」)日期為二零二五年三月三十一日及二零二五年八 月二十九日的公告,內容有關(其中包括)延遲刊發本公司及其附屬公司截至二零二四年十 二月三十一日止年度之經審核年度業績。 本公司董事會 (「董事會」)謹此宣佈,本公司將於二零二六年一月三十日(星期五)假座香港 九龍尖沙咀海港城港威大廈 6 座 22 樓 2202-04 室舉行董事會會議,以 (其中包括) 考慮及批 准本公司及其附屬公司截至二零二四年十二月三十一日止期間的已經審核年度業績及其刊 發,以及考慮是否建議派發末期股息 (如有)。 於本公告日期,本公司董事會包括五名執行董事,分別為丹斯里皇室拿督古潤金 P.S.M., D.P.T.J. J ...
绿科科技国际:尾矿选矿厂FEED包授予GR Engineering Services Limited
Zhi Tong Cai Jing· 2026-01-16 15:07
Group 1 - The company, Green Tech International (00195), announced the latest information regarding the Renison Tin Mine's tailings reprocessing project, in which it holds a 50% interest through its indirect non-wholly owned subsidiary, YT Parksong Australia Holding Pty Limited [1] - The Renison project is managed by Bluestone Mines Tasmania Joint Venture Pty Ltd (BMTJV), which is co-owned by Metals X Limited, holding the other 50% stake [1] - The latest information is based on data provided by Metals X [1] Group 2 - BMTJV is currently reviewing and updating its previous feasibility study and advancing environmental permits to facilitate investment decisions regarding the tailings [2] - BMTJV has awarded the front-end engineering and design (FEED) package for the tailings processing plant to GR Engineering Services Limited, which includes the construction of a new tailings reprocessing facility with an annual processing capacity of 2.4 million tons [2] - The FEED package is expected to be completed by the third quarter of 2026, with a final investment decision anticipated by the end of 2026 [2]
绿科科技国际(00195.HK):BMTJV已将尾矿选矿厂前端工程与设计包授予GR Engineering Services
Ge Long Hui· 2026-01-16 15:05
Group 1 - The company, Green Technology International (00195.HK), announced updates regarding the Renison tin mine project, in which it holds a 50% interest through its indirect subsidiary YT Parksong Australia Holding Pty Limited [1] - The Renison project is managed by Bluestone Mines Tasmania Joint Venture Pty Ltd (BMTJV), which is co-owned by Metals X Limited, holding the other 50% [1] - The latest information is based on data provided by Metals X [1] Group 2 - BMTJV is currently reviewing and updating the pre-feasibility study and advancing environmental permits to facilitate investment decisions regarding the tailings [2] - BMTJV has awarded the front-end engineering and design (FEED) package for the tailings processing plant to GR Engineering Services Limited, which includes the construction of a new facility with an annual processing capacity of 2.4 million tons [2] - The FEED package is expected to be completed by the third quarter of 2026, with a final investment decision anticipated by the end of 2026 [2]
绿科科技国际(00195):尾矿选矿厂FEED包授予GR Engineering Services Limited
智通财经网· 2026-01-16 15:05
Group 1 - The core point of the article is that GreenTech International (00195) has provided an update on the Renison tailings reprocessing project, in which it holds a 50% interest through its indirect subsidiary YT Parksong Australia Holding Pty Limited [1] - The Renison project is managed by Bluestone Mines Tasmania Joint Venture Pty Ltd (BMTJV), which is co-owned by Metals X Limited, holding the other 50% stake [1] - The latest information is based on data provided by Metals X [1] Group 2 - BMTJV is currently reviewing and updating its previous feasibility study and advancing environmental permits to facilitate investment decisions regarding the tailings [2] - BMTJV has awarded the front-end engineering and design (FEED) package for the tailings processing plant to GR Engineering Services Limited, which includes the construction of a new facility with an annual processing capacity of 2.4 million tons [2] - The FEED package is expected to be completed by the third quarter of 2026, with a final investment decision anticipated by the end of 2026 [2]
绿科科技国际(00195) - 自愿公告-尾矿选矿厂FEED包授予
2026-01-16 14:57
香港交易及結算所有限公司及香港聯合交易所有限公司對本公告之內容概不 負責,對其準確性或完整性亦不發表任何聲明,並表明不會就因本公告全部 或任何部分內容而產生或因依賴該等內容而引致之任何損失承擔任何責任。 GREENTECH TECHNOLOGY INTERNATIONAL LIMITED 綠科科技國際有限公司 (於開曼群島註冊成立之有限公司) (股份代號:00195) 自願公告- 尾礦選礦廠FEED包授予 本公告乃綠科科技國際有限公司(「本公司」,連同其附屬公司,統稱「本集團」) 作出之自願公告。 本公司董事會(「董事會」)謹此提供雷尼森錫礦業務(「雷尼森」)的雷尼森尾礦 再選項目(「尾礦」)之最新資料,本公司透過YT Parksong Australia Holding Pty Limited(「YTPAH」)(本集團的間接非全資附屬公司)於該項目擁有50%的權 益。雷尼森由Bluestone Mines Tasmania Joint Venture Pty Ltd(「BMTJV」)管理。 Metals X Limited(「Metals X」,一家在澳大利亞註冊成立的有限公司,其股份 在澳大利亞證券交易所 ...