Workflow
Daqin Railway(601006)
icon
Search documents
大秦铁路(601006.SH):9月大秦线完成货物运输量3305万吨 同比增长3.25%
智通财经网· 2025-10-10 08:50
Core Viewpoint - Daqin Railway (601006.SH) reported a 3.25% year-on-year increase in cargo transportation volume for its core operating asset, the Daqin Line, reaching 33.05 million tons by September 2025 [1] Group 1: Transportation Volume - The average daily transportation volume for the Daqin Line was 1.1017 million tons [1] - The Daqin Line operated an average of 70.3 heavy trains per day, including 52.6 trains of 20,000 tons each [1] - From January to September 2025, the cumulative cargo transportation volume was 28.587 million tons, reflecting a slight decrease of 0.20% year-on-year [1]
大秦铁路:9月大秦线完成货物运输量3305万吨 同比增长3.25%
Zhi Tong Cai Jing· 2025-10-10 08:48
Core Viewpoint - The announcement from Daqin Railway indicates a slight increase in cargo transportation volume for the Daqin Line in September 2025, while showing a minor decline in the cumulative volume for the year-to-date period [1] Group 1: Transportation Volume - In September 2025, the Daqin Line achieved a cargo transportation volume of 33.05 million tons, representing a year-on-year increase of 3.25% [1] - The average daily transportation volume for September 2025 was 1.1017 million tons [1] - The Daqin Line operated an average of 70.3 heavy trains per day, with 52.6 of those being 20,000-ton trains [1] Group 2: Year-to-Date Performance - From January to September 2025, the cumulative cargo transportation volume for the Daqin Line was 285.87 million tons, reflecting a year-on-year decrease of 0.20% [1]
大秦铁路(601006.SH):9月核心经营资产大秦线完成货物运输量3305万吨,同比增长3.25%
Ge Long Hui A P P· 2025-10-10 08:47
Core Viewpoint - The company reported an increase in cargo transportation volume for the Daqin Line in September 2025, indicating a positive trend in operational performance despite a slight decline in year-to-date figures [1] Group 1: Transportation Volume - In September 2025, the Daqin Line achieved a cargo transportation volume of 33.05 million tons, representing a year-on-year increase of 3.25% [1] - The average daily transportation volume reached 1.1017 million tons [1] - The Daqin Line operated an average of 70.3 heavy trains daily, with 52.6 of those being 20,000-ton trains [1] Group 2: Year-to-Date Performance - From January to September 2025, the cumulative cargo transportation volume for the Daqin Line was 285.87 million tons, showing a year-on-year decrease of 0.20% [1]
大秦铁路:暂未实施股份回购
Ge Long Hui· 2025-10-10 08:40
格隆汇10月10日丨大秦铁路(601006.SH)公布,截至2025年9月30日,公司尚在进行回购专用证券账户的 开立,暂未实施股份回购。 ...
大秦铁路:9月货运量同比增长3.25%
Xin Lang Cai Jing· 2025-10-10 08:38
Core Viewpoint - The company reported that its core operating asset, the Daqin Line, achieved a cargo transportation volume of 33.05 million tons in September 2025, representing a year-on-year increase of 3.25% with an average daily volume of 1.1017 million tons [1] Summary by Relevant Categories Cargo Transportation Performance - In September 2025, the Daqin Line completed a cargo transportation volume of 33.05 million tons, which is a 3.25% increase compared to the previous year [1] - For the period from January to September 2025, the cumulative cargo transportation volume reached 286 million tons, showing a slight year-on-year decrease of 0.20% [1]
解密主力资金出逃股 连续5日净流出473股
Core Points - As of October 9, 2023, a total of 473 stocks in the Shanghai and Shenzhen markets have experienced net outflows of main funds for five consecutive days or more [1] - The stock with the longest continuous net outflow is Suda Holdings, which has seen outflows for 32 days, followed by Xilinmen with 22 days [1] - In terms of total net outflow amount, Heertai leads with a cumulative outflow of 5.283 billion yuan over six days, followed by Luxshare Precision with 4.627 billion yuan over five days [1] Summary by Category Continuous Net Outflow Duration - Suda Holdings: 32 days of net outflow [1] - Xilinmen: 22 days of net outflow [1] Total Net Outflow Amount - Heertai: 5.283 billion yuan over 6 days [1] - Luxshare Precision: 4.627 billion yuan over 5 days [1] - Other notable outflows include: - Xian Dao Intelligent: 4.486 billion yuan over 7 days [1] - Zhongji Xuchuang: 4.020 billion yuan over 6 days [1] Proportion of Net Outflow to Trading Volume - Daqin Railway has the highest proportion of net outflow, with a 5-day decline of 3.95% [1]
能源动脉大秦铁路开始秋季集中修施工
Xin Hua She· 2025-10-07 14:54
Core Viewpoint - The Daqin Railway, a crucial coal transportation route in China, is undergoing a 20-day autumn maintenance period from October 7 to October 26, aimed at ensuring stable coal supply for the upcoming winter and spring [1] Group 1: Maintenance Details - The Daqin Railway spans 653 kilometers, connecting Shanxi Datong in the west to Hebei Qinhuangdao in the east, and is the first double-track electrified heavy-load coal transport line in China [1] - During the maintenance period, the railway aims to maintain an average daily transport volume of over 1 million tons, despite a daily suspension of operations for 180 minutes [1] - The maintenance work includes replacing 107.438 kilometers of rail and 15,700 sleepers, as well as tasks such as tunnel remediation, cable updates, and contact network maintenance [1] Group 2: Resource Allocation - A total of 67 sets of large construction machinery, including tamping and screening machines, and 114 small machines like excavators, have been mobilized for the maintenance work, along with over 10,000 construction personnel [1] - The investment in human and machine resources has increased compared to the previous year, indicating a focus on improving construction quality and efficiency through detailed coordination and multi-disciplinary operations [1]
中国能源运输通道大秦铁路启动秋季集中修施工
Zhong Guo Xin Wen Wang· 2025-10-07 10:19
Core Points - The Daqin Railway has commenced its 2025 autumn concentrated repair construction, which will last for 20 days from October 7 to October 26, aimed at restoring railway facilities and ensuring energy supply for the upcoming winter and spring [1][3] Group 1: Construction Details - The Daqin Railway, spanning 653 kilometers from Datong in Shanxi to Qinhuangdao in Hebei, is China's first double-track electrified heavy-load coal transport line, with an annual coal transport capacity of approximately 400 million tons [3] - During the 20-day concentrated repair, the railway will experience a daily suspension of operations for 180 minutes, with tasks including the replacement of 107.438 kilometers of rail and 15,700 sleepers, as well as extensive maintenance work on tunnels, cables, and contact networks [3][4] - The construction will involve a total of 67 large construction machines and 114 small machines, with over 10,000 personnel organized into 126 construction teams to enhance efficiency and quality [3][4] Group 2: Coordination and Efficiency - To ensure the simultaneous execution of construction and transportation, the Daqin Railway has increased its workforce by over 900 personnel compared to the same period last year and added 14 large and 17 small maintenance machines [4] - The construction department has prepared a daily construction plan three days in advance, while the transportation department adjusts the transport scheme dynamically to maintain a daily average transport volume of over 1 million tons during the repair period [4]
为期20天,每天停运3小时!大秦铁路开启秋季集中修施工
Xin Lang Cai Jing· 2025-10-07 04:34
转自:北京日报客户端 10月7日上午,我国重要能源通道大秦铁路开启2025年秋季集中修施工,将全面恢复迎峰度夏能源运输后的铁路设施设备性能,为今冬明春电煤保供夯实线路基础。 此次集中修施工从10月7日至10月26日,为期20天,大秦铁路每天将停运180分钟,累计完成成段更换钢轨107.438公里、成段更换轨枕1.57万根,大机捣固线路519.408公里、大机打磨线路 大秦铁路西起山西大同,东至河北秦皇岛,全长653公里,是我国西煤东运主要通道,年运输煤炭4亿吨以上,承担着全国各大电网、发电公司、钢铁公司和300多家主要发电厂、6000多家企业 来源:央视新闻客户端 作者: 宋云屹 另外,为确保施工和运输"两不误",此次集中修施工较去年同期增派900余名作业人员,增加14台大型机械、17台小型养路机械,更换钢轨作业队伍由去年的一支增加到三支;同时,运输部门 ...
为期20天 每天停运3小时!大秦铁路开启秋季集中修施工
Xin Lang Cai Jing· 2025-10-07 03:47
10月7日上午,我国重要能源通道大秦铁路开启2025年秋季集中修施工,将全面恢复迎峰度夏能源运输 后的铁路设施设备性能,为今冬明春电煤保供夯实线路基础。此次集中修施工从10月7日至10月26日, 为期20天,大秦铁路每天将停运180分钟,累计完成成段更换钢轨107.438公里、成段更换轨枕1.57万 根,大机捣固线路519.408公里、大机打磨线路758公里等任务,以及隧道整治、电缆更新、接触网维修 等施工。国铁太原局大规模使用大型捣固车、清筛车等大型施工机械67组,挖掘机等小型机械114台, 10000余人组成126支施工队伍,同时上道,多工种立体式作业,提高施工质量和效率。(央视新闻) ...