MONGOLIA ENERGY(MOAEY)
Search documents
蒙古能源(00276) - 薪酬委员会之职权范围书

2026-01-28 08:57
MONGOLIA ENERGY CORPORATION LIMITED 蒙古能源有限公司* (於百慕達註冊成立之有限公司) (股份代號:276) 薪酬委員會 職權範圍書 1. 成員 2. 秘書 3. 會議 1 1.1 薪酬委員會須由董事會委任。 1.2 薪酬委員會之過半數成員(「成員」)須為獨立非執行董事 (「獨立非執行董事」)。 1.3 薪酬委員會之主席須由董事會委任,並須為獨立非執行董事。 5.1 薪酬委員會之主席或(如其缺席)薪酬委員會之另一名成員 (必須為獨立非執行董事)須出席本公司之股東周年大會,並 回應股東就薪酬委員會之活動及彼等之責任作出之提問。 6. 權力及責任 薪酬委員會須具有下列權力及責任: 2 2.1 薪酬委員會之秘書由公司秘書擔任。 2.2 薪酬委員會可不時委任其他任何具備合適資格及經驗之人士為 薪酬委員會之秘書。 3.1 薪酬委員會每年最少須舉行一次會議。 3.2 除非全體成員一致通過豁免會議之通知,否則任何會議之通知 最少須於該會議舉行前十四天作出。不論所作出之通知期之長 短,成員出席會議將被視為成員豁免所需之通知期。倘續會於 少於十四天內舉行,則任何續會毋須作出通知。 4. 出席 ...
*ST金比(002762.SZ):预计2025年净亏损1.3亿元-1.9亿元
Ge Long Hui A P P· 2026-01-27 10:24
Core Viewpoint - *ST Jinbi (002762.SZ) expects a net profit attributable to shareholders of the listed company for 2025 to be between -190 million and -130 million yuan, with a net profit excluding non-recurring gains and losses projected to be between -120 million and -80 million yuan, and operating revenue estimated at 350 million to 380 million yuan [1] Group 1: Revenue Changes - The revenue change is attributed to the acquisition of Zhuhai Hanfei and Zhongshan Hanfei at the end of 2024, which is expected to contribute approximately 68 million yuan to operating revenue in 2025 [1] - In 2025, the company will continue to expand its online channels and extend its product line strategy from maternal and infant products to fast-moving consumer goods for families, driving revenue growth [1] Group 2: Profit Indicators - The change in profit indicators is primarily due to the continuous losses from the associated company Guangdong Hanfei Hospital Investment Co., Ltd., which will require the company to recognize corresponding investment losses and make provisions for long-term equity investment impairment in 2025 [1]
华电内蒙古能源公司增资至70.8亿
Jin Rong Jie· 2026-01-26 08:40
天眼查显示,近日,华电内蒙古能源有限公司发生工商变更,注册资本由约54.8亿人民币增至约70.8亿 人民币。该公司成立于2009年3月,法定代表人为那仁满都拉,经营范围包括 电力、 热力和 新能源项 目的开发、投资、建设、生产经营管理及产品销售等,由中国华电集团有限公司全资持股。 ...
内蒙古能源集团煤炭板块以有解思维破难题 以实干担当交优卷
Xin Hua Cai Jing· 2026-01-23 09:31
纳林希里煤矿项目成功取得国家发展改革委核准批复和采矿许可证,正全速推进开工建设筹备工作;布 拉格煤矿矿区总规获得国家发展改革委批复,如期取得采矿许可证,产能置换承诺书待国家能源局复 函,项目核准等后续工作加速推进;板洞梁煤矿矿区总规环评补充报告顺利取得国家生态环境部复函; 达海庙煤矿取得勘查许可证,地质勘探施工全面完成;李家塔煤矿产能置换方案获得国家发展改革委批 复,为矿井后续产能有序释放提供了关键支撑。 在攻坚"破题"、真抓实干的强劲势头下,蒙能煤业公司项目建设投资规模实现大幅增长,累计完成投资 较煤炭板块重组时增长超过120%,彰显了企业深耕能源保供主责主业的坚定、韧性与活力。 安全生产形势持续向好,主要经营指标稳步攀升,项目前期工作扎实推进,减亏治亏行动多点突破…… 内蒙古能源集团煤炭板块始终坚持"稳中求进、守正创新、干字当头",以有解思维主动破局攻坚克难, 在逆势承压中稳固发展基本盘,在大战大考中锤炼高素质队伍,在提质增效中蓄积高质量动能。 安全筑基以实干筑牢发展"压舱石" 安全是发展的生命线,更是企业的立身之本。内蒙古能源集团蒙能煤业有限公司(以下简称蒙能煤业公 司)将安全生产摆在战略核心位置,锚定 ...
内蒙古能源集团工程建设板块跨越式发展实现新突破
Xin Hua Cai Jing· 2026-01-20 03:34
Core Viewpoint - The Inner Mongolia Energy Group's Engineering Construction Division has achieved a transformative development from scale expansion to a focus on quality and efficiency, demonstrating high-quality growth through practical actions and innovation [1] Market Development - The Engineering Construction Division adopts a strategy of "consolidating local markets and expanding external markets," aiming for a total contract amount exceeding 17 billion yuan by 2025 and a cumulative total of over 60 billion yuan during the 14th Five-Year Plan period [2] - Projected revenue for 2025 is over 12 billion yuan, with a cumulative total exceeding 50 billion yuan during the 14th Five-Year Plan [2] - The division has secured four large-scale thermal power projects with a total installed capacity of 8 million kilowatts and has a market share exceeding 60% in the regional thermal power engineering market [2] - In the renewable energy sector, the division has undertaken projects with an installed capacity exceeding 23 million kilowatts, achieving over 50% market share in the regional renewable energy engineering market [2] External Market Breakthroughs - The division has established regional market development centers in Xinjiang and Beijing, focusing on energy-rich areas in Northwest and Northeast China, successfully entering high-end markets such as the Southern Power Grid and State Grid [3] - During the 14th Five-Year Plan, the division has completed over 6,300 kilometers of transmission lines and 108 substation projects, demonstrating capabilities in ±800kV ultra-high voltage engineering [3] - The division is actively developing emerging businesses in energy storage, green hydrogen, and coal reserve bases, successfully winning multiple energy storage projects [3] Operational Management - The division has implemented a collaborative management model centered on projects, focusing on cost control and performance, resulting in continuous profit growth from 2022 to 2024, with a projected profit of 420 million yuan in 2025 [4] - Digital management upgrades have been achieved through the deep application of ERP systems, optimizing 75 processes and integrating safety and internal control systems [4] - A comprehensive cost control system has been established, leading to savings exceeding 2.4 billion yuan through transparent procurement practices [4] - The division has implemented an incentive assessment mechanism to promote management improvement and has adopted a rigorous approach to project cost pre-control and benchmarking [5] Future Development - The Engineering Construction Division aims to continue its development philosophy of "precise positioning, quality improvement, risk prevention, collaborative integration, and brand enhancement" to create a new high-quality development landscape for the entire industry chain [5]
“十四五”以来 内蒙古能源科技装备
Xin Lang Cai Jing· 2026-01-18 19:30
Group 1: Green Hydrogen and Coal Chemical Integration - The system successfully addresses the core contradiction between the intermittent and volatile nature of wind and solar power generation and the continuous stable production of hydrogen from coal chemical processes [1] - A multi-time scale control mechanism has been established to accurately smooth out fluctuations in wind and solar output and flexibly adapt hydrogen production loads, ensuring continuity in hydrogen production under high proportions of renewable energy [1] - The system utilizes laser wind radar and all-sky instruments combined with machine learning technology to achieve second-level wind and solar power forecasting with an accuracy exceeding 95% [1] Group 2: High-Efficiency Dual Extraction Thermal Power Generation - The 1000MW dual extraction thermal power generation unit is the first of its kind in China, designed to reduce coal consumption to 278.5 grams per kilowatt-hour, which is a reduction of 23 grams compared to conventional ultra-supercritical air-cooled units [2] - This unit can save approximately 115,000 tons of standard coal annually and reduce carbon emissions by 30.59 tons [2] - The maximum industrial steam extraction capacity of the unit is 600 tons per hour, providing a significant solution for centralized thermal power supply in industrial parks and urban residential users [2] Group 3: Grid-Based Pure Renewable Energy Systems - The construction and demonstration of this system break the traditional reliance on conventional rotating units, validating the correctness of grid-based energy storage technology for large-scale grid operations [3] - It opens new application scenarios for grid-based energy storage technology, enhancing grid short-circuit capacity, improving system inertia, and optimizing frequency and voltage control [3] - The system supports the development of clean energy consumption and explores new pathways for the renewable energy industry, contributing to the national "dual carbon" goals [3] Group 4: Intelligent Reactive Power Transformer - The 66kV magnetic-controlled intelligent reactive power transformer combines controllable reactors with transformers, effectively addressing the challenges of reactive power balance and voltage stability after large-scale renewable energy integration [4] - This transformer can quickly respond to reactive power changes from renewable generation, providing stable reactive support for grid integration [4] - It promotes the optimization and transformation of the energy structure [4] Group 5: Green Power Station Demonstration Project - The project achieves intelligent coordinated operation of high-proportion energy storage and wind-solar renewable energy, ensuring reliable energy supply and promoting the development of the "new energy + energy storage" model [5] - It features a storage system that accounts for approximately 30% of the total installed capacity of wind and solar, making it the largest integrated wind-solar storage power station under construction globally [5] - The project includes a digital management system that enhances the digital intelligence level of wind-solar storage stations [5]
内蒙古能源集团2025年绿证销售实现跨越式增长
Xin Hua Cai Jing· 2026-01-14 08:29
Core Insights - In 2025, Inner Mongolia Energy Group's renewable energy sector achieved significant growth in green certificate sales, driven by abundant wind and solar resources and favorable regional policies, marking a benchmark for green certificate operations and enhancing the company's green transformation efforts [1][2] Sales and Revenue - The company issued over 800,000 tradable green certificates in 2025, representing a year-on-year increase of over 330% - Green certificate sales revenue exceeded 16 million yuan, becoming a new growth point for the company's revenue [1] Market Performance - The domestic green certificate market in 2025 exhibited a differentiation between "new certificates at high prices" and "existing certificates at low prices" - The company strategically focused on trading newly produced wind power green certificates to maximize revenue while avoiding risks associated with low prices of existing certificates [1] Trading Strategy and Market Positioning - Leveraging the Inner Mongolia power grid as a platform for green electricity trading, the company established a diversified trading system - The company actively engaged in the Mongolian West electricity multilateral trading market, employing a "bundled electricity and certificates" approach, with 80% of green certificate transactions being long-term agreements, ensuring stable sales [2] Policy and Capacity Support - The rapid growth of the company's green certificate business is supported by policy initiatives and increased capacity - In March 2025, new policies from the National Development and Reform Commission and the comprehensive market entry of Inner Mongolia's renewable energy created rigid market demand - The company accelerated the deployment of new renewable energy capacity, ensuring a solid foundation for green certificate supply [2] Future Outlook - The company plans to continue focusing on wind and solar energy, expanding green electricity capacity, and deepening cooperation with market participants - With the advancement of the "Shagehuang" base and external transmission channels, the green certificate business is expected to break regional boundaries and contribute to national energy structure transformation [3]
蒙古能源正索取法律意见并考虑对判决提出上诉
Zhi Tong Cai Jing· 2026-01-09 09:03
Core Viewpoint - Mongolian Energy (00276) is facing a significant tax dispute, with a court ruling against its claims and in favor of the tax authority, requiring the company to pay a substantial amount in back taxes [1] Group 1: Tax Dispute Details - On January 5, 2026, MoEnCo representatives attended a hearing at the Mongolian Administrative Court regarding a tax assessment dispute [1] - The tax authority ruled that MoEnCo must pay a total of 412.3 billion Mongolian Tugrik for the tax periods from 2017 to 2020 [1] - The hearing lasted only one day, and the court issued a verbal judgment favoring the tax authority, dismissing MoEnCo's claims [1] Group 2: Next Steps and Company Response - A detailed written judgment is expected to be provided within fourteen days from the date of the hearing, depending on the court's workload [1] - MoEnCo has the right to appeal the judgment within fourteen days of receiving the written decision [1] - The company is seeking legal advice and is considering an appeal against the ruling, while closely monitoring the situation for further developments [1]
蒙古能源(00276)正索取法律意见并考虑对判决提出上诉

智通财经网· 2026-01-09 09:01
Core Viewpoint - Mongolia Energy (00276) is involved in a tax dispute with the Mongolian Tax Dispute Resolution Committee, which has ruled that MoEnCo must pay a total of 412.3 billion Mongolian Tugrik for the tax periods from 2017 to 2020 [1] Group 1: Legal Proceedings - On January 5, 2026, MoEnCo representatives attended a hearing at the Mongolian Administrative Court regarding the tax ruling [1] - The hearing lasted only one day, resulting in an oral judgment favoring the Tax Dispute Resolution Committee and dismissing MoEnCo's claim [1] - A detailed written judgment is expected to be provided within fourteen days from the date of the hearing [1] Group 2: Company Actions - MoEnCo has the right to appeal the judgment within fourteen days from the receipt of the written judgment [1] - The company is currently seeking legal advice and considering an appeal against the ruling [1] - Mongolia Energy will closely monitor the situation and will issue further announcements to keep shareholders and potential investors informed of any developments [1]
蒙古能源(00276) - 内幕消息有关蒙古税务争议

2026-01-09 08:52
香港交易及結算所有限公司及香港聯合交易所有限公司對本公告之內容概不負責,對其準確性 或完整性亦不發表任何聲明,並明確表示概不就因本公告全部或任何部分內容而產生或因依賴 該等內容而引致之任何損失承擔任何責任。 MONGOLIA ENERGY CORPORATION LIMITED 蒙古能源有限公司* (於百慕達註冊成立之有限公司) (股份代號:276) 內幕消息 有關蒙古稅務爭議 本公告乃蒙古能源有限公司 (「本公司」,連同其附屬公司,統稱「本集團」) 根 據香港聯合交易所有限公司證券上市規則 (「上市規則」) 第 13.09(2)(a) 條及香 港法例第 571 章證券及期貨條例第 XIVA 部項下的內幕消息條文 (定義見上 市規則) 而刊發。 聆訊僅進行了一天,而該法院作出口頭判決宣告有利於稅務爭議解決委員會的判 決和撤銷 MoEnCo 的申索。視乎該法院工作量,詳細的書面判決預計由聆訊日起 計十四天內可予提供。MoEnCo 有權於收到書面判決之日期起計十四天內就判決 提出上訴。本集團正索取法律意見並考慮對判決提出上訴。本公司將密切監察事 態發展,並將適時及有需要時另行刊發公告,讓股東及本公司的有意投資者及 ...