安全生产责任
Search documents
中金黄金两日市值蒸发47亿元,律师怎么看6名学生死亡事件责任
Di Yi Cai Jing· 2025-07-25 11:36
Group 1 - The incident involving the fall of six university students at a subsidiary of China National Gold Group has raised concerns about the responsibilities of China National Gold Group Inner Mongolia Mining Co., Northeast University, and local safety production regulatory departments [1][2][3] - Following the incident, the stock price of Zhongjin Gold (600489.SH) fell to 14.92 yuan per share, a decline of nearly 1.8%, resulting in a total market value loss of approximately 4.7 billion yuan over two days [1] - The direct cause of the accident was identified as an old crack in the weld of the steel grating above the flotation tank, which failed under concentrated load, leading to the grating falling [1][2] Group 2 - The company had previously conducted a partial replacement of the grating in February but did not perform non-destructive testing on all welds, indicating a lack of thorough safety measures [2][3] - The safety measures during the student visit were inadequate, as there was no specific safety inspection conducted prior to the large group visit, and the area lacked proper load-bearing signage [2][4] - Legal experts suggest that the company may face significant civil liability due to the safety hazards present and the failure to rectify known issues, potentially leading to administrative penalties and criminal charges for responsible personnel [3][4]
公司副总亲自送货被压倒身亡!深圳官方通报
券商中国· 2025-06-21 12:25
Core Viewpoint - The article discusses the investigation report of a general object strike accident that occurred during the installation of a bus station in Shenzhen's Guangming District, resulting in one fatality and an economic loss of approximately 2.6 million RMB [2][11]. Group 1: Accident Overview - On April 14, 2024, a general object strike accident occurred during the installation project of the bus station on Sun Road, leading to one death and direct economic losses of about 2.6 million RMB [2][11]. - The accident was attributed to the failure of the supplier to fulfill safety management responsibilities and workers violating operational regulations [3]. Group 2: Project and Involved Companies - The construction unit for the project is the Shenzhen Guangming District Construction Engineering Office, with the main contractor being Shenzhen Yuetong Construction Engineering Co., Ltd. [4]. - The project involves several companies, including Guangdong Aizhuo Precision Manufacturing Co., Ltd. as the supplier and Guangdong Chengjiao Construction Engineering Co., Ltd. as the installation unit [4]. Group 3: Accident Details - The accident occurred when workers were unloading large glass panels, which became unstable due to improper handling and the vehicle's position, leading to the glass falling and striking a worker [6][9]. - The glass panels measured 1810mm in width, 3800mm in length, and weighed 150kg, which contributed to the severity of the incident [9]. Group 4: Responsibility and Recommendations - The investigation identified two main causes: unsafe behavior by the worker and unsafe conditions related to the vehicle's positioning and the lack of proper securing measures for the glass [12]. - Recommendations for administrative penalties were made against the responsible parties, including the main person in charge of Guangdong Aizhuo for failing to ensure safety measures [15][16].