Workflow
城市生命线安全工程
icon
Search documents
着力建设安全可靠的韧性城市(现代化人民城市这样建·韧性)
Ren Min Ri Bao· 2025-09-18 21:45
Group 1: Housing Safety Improvement in Xuzhou - Xuzhou has enhanced housing safety by utilizing housing provident fund returns to finance the repair of old buildings, addressing funding challenges faced by older communities [1][2] - The city has implemented a pilot program for comprehensive safety management of old buildings, including insurance coverage for structural failures and regular inspections by third-party agencies [2][3] - A total of 1,225 multi-owner residential buildings built before 2002 have been insured for old building safety, with an insurance amount of 7.5 million yuan [3] Group 2: Urban Safety Initiatives in Hefei - Hefei has initiated urban lifeline safety engineering projects, utilizing advanced monitoring technology to prevent damage to underground utilities during construction [4][5] - The city has developed a comprehensive data platform covering 170,000 kilometers of underground pipelines and 1,230 square kilometers of above-ground structures for real-time monitoring [5] Group 3: Sponge City Concept in Jiujiang - Jiujiang is implementing the sponge city concept to improve urban drainage and flood control, integrating natural water management solutions into urban planning [6][7] - The city has established regulations to promote sponge city construction, focusing on source prevention and ecological methods [8] Group 4: Disaster Prevention and Emergency Response in Zaozhuang - Zaozhuang has developed a smart AI platform for flood prevention, providing real-time alerts and facilitating emergency response through data analysis [9][10] - The city has established 73 emergency rescue points to ensure rapid response capabilities, aiming for full coverage across communities by the end of the year [10][11]
测绘股份: 关于公司可转债募集资金投资项目延期的公告
Zheng Quan Zhi Xing· 2025-08-11 16:16
Core Viewpoint - The company has decided to extend the expected completion date for two fundraising projects to December 31, 2027, due to current market conditions and project progress [1][12][13] Fundraising Overview - The company raised a net amount of approximately RMB 398.48 million from the issuance of convertible bonds on March 2, 2023, with all funds received by March 8, 2023 [1][2] - The funds are being managed in accordance with relevant regulations, ensuring dedicated accounts for their storage and use [2][6] Project Progress - The two main projects funded by the raised capital are: 1. Urban Lifeline Safety Monitoring Platform Construction 2. Computing Power Center and Production Base for Digital Twin [3][4] - As of June 30, 2025, the cumulative investment in these projects was approximately RMB 39.85 million, with a progress rate of 9.66% [5][6] Delay Reasons - The delay in project completion is attributed to: - A total of RMB 84.20 million planned for property acquisition and renovation not yet implemented, representing 26.17% of the total planned investment [6][8] - A slowdown in investment in urban infrastructure due to macroeconomic pressures [8][10] Project Details - The Urban Lifeline project aims to integrate and enhance government and enterprise monitoring systems using advanced technologies like IoT and big data [7][8] - The Computing Power Center is designed to optimize cost structures and enhance data security, although it currently does not generate direct revenue [8][9] Future Plans - The company plans to use the remaining funds primarily for equipment purchases and research and development, while actively exploring potential market demands related to the projects [10][12] - The company will optimize resource allocation and monitor project progress closely to ensure timely completion [10][11]
建设安全可靠的韧性城市
Jing Ji Ri Bao· 2025-08-01 21:53
Core Viewpoint - The recent Central Urban Work Conference emphasizes the need to advance urban infrastructure safety projects and accelerate the renovation and upgrading of old pipelines, marking a foundational task for safeguarding urban lifelines and ensuring high-quality urban development [1]. Group 1: Urban Development Goals - China's urban development is shifting from large-scale expansion to enhancing existing infrastructure, with key goals including innovation, livability, beauty, resilience, civilization, and intelligence [1]. - Upgrading critical infrastructure such as gas, water supply, drainage, and bridges is essential and should not be limited to simple repairs but rather require a comprehensive operational system that integrates efficiency, safety, intelligence, and resilience [1]. Group 2: Local Practices and Innovations - Local practices show that advancing urban lifeline safety projects is viewed as a crucial strategy for building modern cities, with Anhui province establishing a monitoring system covering 170,000 kilometers of underground pipelines for precise risk management [1]. - The collaboration between technology, funding, and information is vital for achieving urban infrastructure safety goals, with a focus on enhancing technological innovation and integrating academic and research resources [2]. Group 3: Funding and Data Management - A robust financing mechanism is necessary due to the substantial funds required for systematic renovations, suggesting the establishment of special funds and the use of fiscal tools to attract diverse capital for sustainable funding [2]. - Breaking down data barriers is essential for effective pipeline system construction, necessitating the creation of an intelligent management hub for information sharing and integration across departments, thereby supporting comprehensive management throughout the lifecycle of urban infrastructure [2].
助力智能社会发展与治理
Ren Min Ri Bao· 2025-06-15 21:52
Core Viewpoint - The article highlights the successful implementation of a comprehensive urban lifeline safety monitoring system in Hefei, which utilizes advanced technologies to enhance public safety and efficiently manage potential risks in urban infrastructure [1][2][3]. Group 1: Urban Lifeline Safety Monitoring System - Hefei has established a robust urban lifeline safety monitoring center that effectively detects and responds to potential hazards, significantly improving the city's safety resilience [1]. - The monitoring center processes over 10 billion data points daily, allowing for real-time risk assessment and timely warnings [2]. - The average response time for various warning events has been reduced to 7 minutes, with joint handling time cut from over 24 hours to 1 hour [2]. Group 2: Technological Innovations - The Hefei urban lifeline safety project has developed over 85,000 monitoring devices, covering 137 bridges and 7,316 kilometers of underground pipelines [2]. - Innovations include highly sensitive gas detectors with a sensitivity of 0.1% and intelligent balls for water pipeline leak detection with a precision of 1 meter within a 25-kilometer range [3]. - A new cybersecurity framework has been established to ensure the secure operation of the monitoring system, addressing data confidentiality and integrity throughout the data lifecycle [3]. Group 3: Expansion and Future Plans - The successful model initiated in Hefei has been expanded to over 70 cities across the country, demonstrating its scalability and effectiveness [4]. - The Hefei Public Safety Research Institute aims to further integrate public safety technology with industry innovation to enhance smart societal governance [4].
南京累计建成502条幸福河湖 水环境监测质量连续六年稳居全省第一
Xin Hua Ri Bao· 2025-03-31 00:27
Core Viewpoint - Nanjing is actively enhancing its water environment through the construction of "happy rivers and lakes," focusing on ecological restoration and improving water quality, with a goal to create a harmonious relationship between people and water [1][3][4]. Group 1: Water Quality and Environmental Management - Nanjing has achieved a 100% compliance rate for water quality in 42 national and provincial monitoring points, with a continuous six-year record of being the best in the province [1]. - The city has built 502 "happy rivers and lakes" and plans to create an additional 40 by the end of the year, emphasizing unique characteristics and ecological restoration [4]. - The implementation of a three-year action plan (2023-2025) aims to address issues in the underground drainage system, with over 1,200 kilometers inspected and 280 kilometers identified for urgent maintenance [6][9]. Group 2: Innovative Water Management Solutions - Nanjing is utilizing aquatic plants to purify water in historical sites, demonstrating a novel approach to ecological restoration [2]. - The city is enhancing its sewage treatment capacity by expanding existing facilities and constructing new ones, which will significantly improve the efficiency of wastewater management [5][7]. - The introduction of digital monitoring systems for urban water management allows for real-time data collection and efficient emergency responses during flooding events [10][11]. Group 3: Water Resource Efficiency - Nanjing faces a significant water scarcity issue, with per capita local water resources at approximately 400 cubic meters, below the international threshold for severe water scarcity [12]. - The city aims to reduce water consumption per unit of GDP to 20 cubic meters by 2024, reflecting an 18% decrease from 2020 levels, showcasing improved water efficiency [12]. - The promotion of recycled water usage is underway, with a target to increase the utilization rate to 25% this year, supporting various applications such as irrigation and road cleaning [13][14].