智慧运河
Search documents
年货物运量 3.4亿吨!苏北运河彰显水运主通道优势
Yang Zi Wan Bao Wang· 2026-01-05 08:09
扬子晚报/紫牛新闻记者笪越 2025年,苏北航务管理处持续深化"智慧运河"建设成果应用,智慧化转型取得关键进展,运调系统融入全省运行调度与监测系统,实现全省一个APP过闸 服务,"智能扩容"成效显著,全线年船舶通过量提升1亿吨;航闸运行安全高效,十个梯级船闸累计开放闸次29.2万次,船舶通过量达22.7亿吨,货物通过 量达17.6亿吨,同比分别增长3.3%和4.7%,通航效能得到进一步释放;煤炭、矿建材料等重点物资运输保障有力,全年煤炭运量达1.17亿吨,同比增长 11.1%,矿建材料运量稳定在1亿吨,集装箱运输虽增幅平缓,但运量规模持续保持高位。2025年苏北运河通航保障率保持在95%以上,成为驱动沿线经济 发展的稳定引擎。 下一步,苏北航务管理处将继续坚持"以船员为中心、以服务为根本"的理念,推动管理与服务深度融合,加速从经验管理向数据驱动、智慧决策转型,着 力建设更安全、更绿色、更智慧、更人文的现代化运河,为交通强国建设贡献"运河"力量。 通讯员许晓婧骆明辉 2025年苏北运河运输生产稳健增长,年货物运量3.4亿吨,同比增长5.2%;集装箱运量达75.2万标箱,同比增长2.8%。水运主通道优势凸显,运行 ...
平陆运河累计完成投资592.5亿元
Ren Min Wang· 2025-09-15 09:22
Core Insights - The Guangxi Zhuang Autonomous Region is advancing the construction of the Pinglu Canal, with a total investment of 592.5 billion yuan completed as of September 10, accounting for 81.5% of the total investment [1] - The construction is expected to be completed by the end of 2026, with significant progress in earthwork excavation, concrete pouring for the lock, and waterway engineering [1] - The project has achieved breakthroughs in technology and management, including the establishment of a national first full lifecycle smart canal construction platform for real-time monitoring and precise management [1] - The economic belt transportation system is being accelerated, with ongoing work on the intermodal terminal project and the construction of an integrated logistics information platform [1][2] Infrastructure Development - Guangxi is leveraging the strategic role of the Pinglu Canal to enhance interconnectivity among railways, highways, civil aviation, postal services, and water transport [2] - The region is focused on improving infrastructure layout, enhancing transportation service efficiency, and promoting a smart and green transformation [2] - The transition from "point breakthroughs and local efforts" to "overall collaboration and systematic upgrades" in transportation is being emphasized [2]
通过交工验收!推动苏北运河数字化转型升级
Yang Zi Wan Bao Wang· 2025-08-28 12:29
Core Points - The Jiangsu section of the Grand Canal's green modern shipping comprehensive renovation project has successfully completed the construction acceptance of the smart canal project, including the lock perception and software platform [1][9] - The project includes the establishment of a comprehensive intelligent perception system for 18 locks, 4 emergency command centers, and various monitoring and scheduling systems [3][4] - The implementation of the project supports fully automated operation of locks, enhancing safety supervision, autonomous equipment operation, and intelligent scheduling of vessels [4][6] Group 1 - The project has created a comprehensive intelligent perception system for locks, ensuring a closed-loop safety supervision throughout the entire process of lock operation [6] - The smart canal project has improved the efficiency and accuracy of shipping operations, enabling timely passage and enhancing the user experience with transparent services [6][9] - Since its full operation on June 1, 2025, the hardware and software systems have been running stably, providing a model for future applications [9]