水下盾构技术
Search documents
经济新方位|铁龙过江,见证水下盾构技术跃迁
Ren Min Ri Bao· 2025-10-11 00:54
Core Viewpoint - The successful completion of the Chongqing Caiyuanba Yangtze River Railway Tunnel marks a significant advancement in China's underwater shield tunneling technology, showcasing the country's ability to construct complex infrastructure projects with high precision and safety [2][3][11]. Group 1: Project Overview - The Chongqing Caiyuanba Yangtze River Railway Tunnel is approximately 11.9 kilometers long, connecting the Yuzhong District and the Nan'an District of Chongqing, and it traverses four different environments: mountain, city, water, and river [3]. - The underwater section of the tunnel is 1,282 meters long, with challenging geological conditions including varying mudstone and sandstone, and a minimum cover thickness of only 10 meters [3][4]. Group 2: Technology and Equipment - The project utilized a domestically designed large-diameter slurry balance shield machine named "Yangtze No. 1," which has a diameter of 12.66 meters and weighs approximately 3,500 tons [5]. - The shield machine is equipped with a high-precision gas-liquid pressure balance control system, allowing for precise adjustments to withstand significant water and soil pressure during tunneling [5][6]. Group 3: Construction Techniques - Innovative techniques such as precise tunnel axis control and intelligent shield management were applied, enabling real-time data collection and cloud-based collaborative management [6]. - The construction process was conducted entirely underground, minimizing disruption to surface traffic and urban life, marking it as the first high-speed rail large-diameter shield project in China to complete all operations underground [7]. Group 4: Historical Context and Development - The development of underwater tunneling technology in China has evolved significantly over the past two decades, transitioning from reliance on imported technology to achieving self-sufficiency and leading in the field [12][14]. - The successful construction of the Wuhan Yangtze River Tunnel in 2008 and the Nanjing Yangtze River Tunnel in 2009 marked critical milestones in the advancement of China's underwater shield tunneling capabilities [10][11]. Group 5: Industry Competitiveness - China's shield machine industry has rapidly advanced, achieving a 60% share of the global market and developing machines with diameters ranging from 2 meters to 16 meters [12]. - Despite significant progress, challenges remain in the ultra-large diameter shield machine sector, particularly in the complete localization of key components [14].
二十年间,从“万里长江第一隧”到“万里长江高铁第一隧” 铁龙过江,见证水下盾构技术跃迁(经济新方位)
Ren Min Ri Bao· 2025-10-11 00:46
Core Points - The successful completion of the Chongqing Caiyuanba Yangtze River Railway Tunnel marks a significant advancement in China's underwater shield tunneling technology, showcasing the country's capabilities in high-precision construction and innovative engineering solutions [3][4][6][12]. Group 1: Project Overview - The Chongqing Caiyuanba Yangtze River Railway Tunnel is approximately 11.9 kilometers long, connecting the Yuzhong District and the Nan'an District of Chongqing, and it traverses four different environments: mountain, city, water, and river [3]. - The underwater section of the tunnel is 1,282 meters long, with challenging geological conditions including varying mudstone and sandstone, and a minimum cover thickness of only 10 meters [3][4]. Group 2: Technology and Equipment - The project utilized a domestically designed large-diameter slurry balance shield machine named "Yangtze No. 1," which has a diameter of 12.66 meters and weighs approximately 3,500 tons [5]. - The shield machine is equipped with a high-precision gas-liquid pressure balance control system, allowing for precise adjustments to the excavation face pressure to withstand significant water and soil pressure [5][6]. Group 3: Construction Techniques - Innovative techniques such as precise tunnel axis control and intelligent shield management were employed, enabling real-time data collection and cloud-based collaborative management [6][8]. - The construction process was conducted entirely underground, minimizing disruption to surface traffic and allowing for the assembly and disassembly of the shield machine within a deep underground chamber [7][8]. Group 4: Industry Development - The development of underwater tunneling technology in China has evolved significantly over the past two decades, transitioning from reliance on imported equipment to achieving self-sufficiency in shield machine manufacturing [12][13]. - China now holds a 60% market share in the global shield machine market and has developed the capability to produce machines with diameters ranging from 2 meters to 16 meters [12][13]. Group 5: Future Prospects - Despite advancements, challenges remain in the field of ultra-large diameter shield machines, particularly in achieving full domestic production of key components [13][14]. - The industry is also focusing on enhancing the integration of intelligent technologies, although there is still a gap compared to global standards for automation [14].
铁龙过江,见证水下盾构技术跃迁(经济新方位)
Ren Min Ri Bao· 2025-10-10 22:10
Core Points - The successful completion of the Chongqing Caiyuanba Yangtze River Railway Tunnel marks a significant advancement in China's underwater shield tunneling technology, being the first high-speed rail tunnel to cross the Yangtze River [3][12] - The tunnel, approximately 11.9 kilometers long, connects the Yuzhong District and the Nan'an District of Chongqing, navigating through complex geological conditions including mountains, urban areas, water bodies, and the main channel of the Yangtze River [3][4] - The project utilized domestically designed large-diameter slurry balance shield machines, showcasing China's advancements in tunneling technology and equipment [5][12] Technology and Equipment - The "Yangtze" shield machine, with a diameter of 12.66 meters and a total weight of about 3,500 tons, features a high-precision pressure balance control system to manage the significant water and soil pressure encountered during tunneling [5][6] - Innovative techniques such as precise tunnel axis control and intelligent shield management systems were employed to ensure accurate navigation and tunneling, minimizing risks from surrounding structures and environments [6][8] - The project demonstrated the ability to assemble and operate the shield machine entirely underground, which is a first for high-speed rail projects in China [7] Industry Development - The construction of underwater tunnels is recognized as a highly challenging task, often referred to as "dancing on the edge of a knife," due to the complex geological conditions encountered [8][9] - China has made significant strides in shield tunneling technology over the past two decades, transitioning from reliance on imported machines to developing and deploying domestically produced shield machines [12][13] - The industry has achieved a high level of self-sufficiency, with over 90% of components for shield machines being domestically produced, although challenges remain in the ultra-large diameter segment [13][14] Future Prospects - The successful implementation of the Chongqing tunnel project is expected to enhance connectivity within the region, facilitating faster transit between key railway stations [7] - The ongoing development of shield tunneling technology positions China as a leader in this field, with increasing applications in various infrastructure projects across the country [11][12]