湿地经济

Search documents
城市24小时 | 克服“先天不足” 湖南的“外援”到了
Mei Ri Jing Ji Xin Wen· 2025-08-20 16:10
Group 1 - The "Ning Electric into Hunan" project is China's first approved ultra-high voltage transmission channel primarily for renewable energy, spanning 1616 kilometers from Ningxia to Hunan [1] - The project has a total installed capacity of 17.64 million kilowatts, with over 70% coming from renewable sources, setting a new record for similar projects [1] - The project is expected to replace approximately 6 million tons of standard coal annually in Hunan, reducing carbon dioxide emissions by about 18 million tons, equivalent to the annual absorption of 1 billion trees [1] Group 2 - The project began trial operation in June 2023, maintaining a high power output of over 3 million kilowatts during the summer, which is nearly 10% of Hunan's peak load [2] - Once fully operational, the project will have a maximum transmission capacity of 8 million kilowatts, delivering between 36 billion to 40 billion kilowatt-hours of electricity annually to Hunan [2] - Hunan's total electricity consumption is projected to reach 237.4 billion kilowatt-hours in 2024, with external electricity accounting for 22.7% of the total, which is expected to rise to nearly 30% with the new project [2] Group 3 - The Hunan delegation has submitted proposals to support major energy projects, including the "Ning Electric into Hunan" and "Xinjiang Electric into Hunan" projects, as part of the national energy development plan [3] - The proposals emphasize the need for additional external electricity channels to address Hunan's energy supply challenges, aiming for external electricity to exceed 40% in the future [3]
城市24小时 | 克服“先天不足”,湖南的“外援”到了
Mei Ri Jing Ji Xin Wen· 2025-08-20 15:59
Core Points - The "Ning Electric into Hunan" project has officially commenced operations, marking China's first high-voltage transmission corridor primarily for renewable energy from the "Shagehuang" wind and solar base [1] - The project spans 1616 kilometers across six provinces, with a total installed capacity of 17.64 million kilowatts, of which 13 million kilowatts are renewable energy [1] - The project is expected to replace approximately 6 million tons of standard coal annually in Hunan, reducing carbon dioxide emissions by about 18 million tons, equivalent to the annual absorption of 1 billion trees [1] Summary by Sections Project Overview - The "Ning Electric into Hunan" project started construction in June 2023 and has a renewable energy share exceeding 70%, setting a new record for similar projects [1] - The project will enable the transmission of rich green electricity from Ningxia to Hunan in just 0.0054 seconds [1] Energy Demand and Supply - During the summer of 2023, the project maintained a high power output of over 3 million kilowatts, accounting for nearly 10% of Hunan's peak load [2] - Once fully operational, the project will have a maximum transmission capacity of 8 million kilowatts, delivering between 36 billion to 40 billion kilowatt-hours of electricity annually to Hunan [2] - Hunan's total electricity consumption is projected to reach 237.4 billion kilowatt-hours in 2024, with a year-on-year growth of 4.3% [2] Future Energy Needs - Hunan's reliance on external electricity is expected to rise to nearly 30% with the project's completion, although the province will still face a "tight balance" in electricity supply [2] - Experts suggest that Hunan will need to construct 3-4 additional external electricity channels to increase the external electricity share to over 40%, which is crucial for addressing local electricity supply issues [2]
奋力实现三季度经济目标任务 龚正主持市政府常务会议
Jie Fang Ri Bao· 2025-08-20 01:56
Group 1 - The Shanghai government aims to achieve economic growth targets for the third quarter by enhancing economic operation scheduling and supporting enterprises in market expansion [1] - From January to July, Shanghai's economy has shown a stable and positive trend, necessitating the implementation of detailed measures to ensure the completion of growth targets [1] - The government emphasizes the importance of macroeconomic analysis and the need to dynamically improve policy tools to maintain growth momentum [1] Group 2 - The meeting approved the "Shanghai Wetland Space Planning and Construction Pilot Action Plan," highlighting the importance of preserving the authenticity and integrity of wetland ecosystems [2] - There is a focus on creating accessible wetland spaces for the public, integrating urban, wetland, and community environments [2] - The government also approved the "Implementation Opinions on Accelerating the Establishment of a Modern Ecological Environment Monitoring System," aiming to enhance monitoring capabilities through advanced technologies [2]