自主三代核电技术

Search documents
核能不再是“美国专属”!中国核电全球第二,俄罗斯全服务抢市场
Sou Hu Cai Jing· 2025-10-06 05:05
预计到2025年,俄罗斯的核电总装机容量将达到32吉瓦。通过这种"全包式"服务,俄罗斯不仅提升了核电项目的国际竞争力,还借此增强了与各国的战略合 作。 在全球能源领域,核电的发展格局正在经历显著的变化,特别是在中国、美国和俄罗斯之间的竞争中。这一变化背后有一个令人关注的数字:从2017年到 2024年,全球新建的52座核反应堆中,中国设计了其中的25座,俄罗斯设计了23座,而美国仅有4座。这一差距不仅表现在数量上,更反映了全球核电实力 的对比正在发生转变。过去,美国在核电领域曾占据绝对领先地位,但如今,中俄的快速崛起让美国的优势不再显著。 为了更好地理解这一变化,我们可以先看看中俄两国在核能领域做出了哪些努力。 中国:核电领域迅速发展 中国在核电领域取得了快速发展,目前其总装机容量位居全球第二。中国已有102座在运、在建及获批的核反应堆,总装机容量达到1.13亿千瓦。国内已建 立起完整的核电产业链,涵盖了设备制造、工程建设、燃料供应以及运营维护等各个环节。 中国的自主三代核电技术,如"华龙一号"和"国和一号",已经投入商业运行,并开始进入国际市场。当前,核电发电量占全国总发电量的5.2%,预计到2025 年, ...
探寻自主三代核电技术从1到41背后的蜕变故事:华龙十年,如何打造核电“国家名片”
Huan Qiu Wang· 2025-05-05 22:52
Core Viewpoint - The article highlights the significant achievements and advancements of China's "Hualong One" nuclear technology over the past decade, showcasing its transition from a follower to a leader in the global nuclear power industry, with a focus on safety, efficiency, and international collaboration [1][11]. Group 1: Development and Achievements - "Hualong One" has seen the successful operation of 7 units domestically and internationally, with a total of 41 units either in operation or under construction globally [1][2]. - The first "Hualong One" unit has achieved nearly 1000 days of safe operation, generating approximately 65 billion kilowatt-hours of electricity, demonstrating its operational excellence [7][11]. - The construction of the first unit was completed in just 68.7 months, setting a global record for the construction of third-generation nuclear power plants [4]. Group 2: Technical Innovations - The "Hualong One" design features a rated power of over 1100 MWe, a lifespan of 60 years, and advanced safety measures, including the ability to withstand a magnitude 9 earthquake and protection against large aircraft impacts [2][3]. - The development process involved the establishment of a comprehensive standard system and a robust intellectual property framework, including over 700 domestic patents and 65 international patents [3]. Group 3: International Expansion - The "Hualong One" technology has been successfully implemented in the K-2/K-3 units at the Karachi Nuclear Power Plant in Pakistan, providing clean electricity for approximately 2 million people and creating over 60,000 local jobs [9][10]. - The project is recognized as a model for international energy cooperation, significantly contributing to Pakistan's energy structure and reducing carbon emissions [9]. Group 4: Talent Development - The establishment of the Hualong International Training Center aims to cultivate skilled personnel for the nuclear industry, with 538 operators and 293 senior operators trained to date [8][10]. - The training initiatives support the ongoing development and international deployment of "Hualong One" technology, enhancing the competitiveness of the Chinese nuclear industry [10].