Workflow
空中交通管制服务
icon
Search documents
深圳空管站2025年保障航班量近45万架次 “三跑道时代”开启新篇
Group 1 - The core viewpoint of the articles highlights the successful operation and management of Shenzhen Baoan International Airport, particularly with the introduction of the third runway, which has significantly improved flight operations and safety measures [1][2][3] Group 2 - In 2025, Shenzhen air traffic control managed a total of 447,800 flight takeoffs and landings, marking a 4.6% year-on-year increase, with an average of 1,227 flights per day and a peak of 1,379 flights in a single day [1] - The third runway was officially put into operation on November 27, 2025, marking the beginning of the "three-runway era" for Shenzhen Airport, which has led to enhanced operational efficiency and safety [2] - The air traffic control has implemented a dual prevention mechanism for risk management, introducing a new alert function for "preventing wrong runway landings" and successfully handling multiple emergency situations [2] - The optimization of flight procedures has been significant, reducing the number of procedures from 107 to 36, which has alleviated operational pressure during peak times [2] - Shenzhen air traffic control is entering a phase of normalized operations with a focus on refined management and smart technology to enhance multi-runway operational potential and ensure safe and efficient air traffic [3]
深圳空管站完成深圳机场三跑道运行全部准备工作
Core Viewpoint - The activation of the new flight procedures and the third runway at Shenzhen Airport marks a significant enhancement in operational efficiency and capacity for the airport, facilitating simultaneous operations of three runways [1][2][3] Group 1: Operational Enhancements - The new flight information and procedures became effective on November 27, 2025, allowing for the first aircraft to utilize the new departure procedures shortly after [1] - The number of departure and arrival procedures at Shenzhen Airport has been optimized from 107 to 36, resulting in a clearer and more efficient air traffic network [2] - The operational modes for runway usage have been refined into four strategies based on flight volume, leading to a total of eight operational modes for dual-direction runway use [2] Group 2: Infrastructure and Training - Over a period of three years and seven months, Shenzhen Air Traffic Control Station completed significant upgrades, including the installation of 13 sub-items across six major categories of air traffic control engineering [2] - Extensive training was conducted for air traffic controllers and pilots, totaling nearly 2000 hours, to ensure familiarity with the new runway designations and flight procedures [2] - Safety assessments and emergency drills were conducted multiple times to ensure a smooth transition to the new operational model [2] Group 3: Future Outlook - The introduction of the third runway is expected to create a coordinated operational framework at Shenzhen Airport, supporting the development of a world-class airport cluster in the Guangdong-Hong Kong-Macau Greater Bay Area [3]
英国空中交通管理局:斯旺威克空中交通管制中心出现技术问题。
news flash· 2025-07-30 15:26
Core Viewpoint - The UK Air Traffic Management Authority reported a technical issue at the Swanwick Air Traffic Control Centre, which may impact air traffic operations [1] Group 1 - The technical problem at the Swanwick Air Traffic Control Centre could lead to disruptions in air traffic management [1] - The incident highlights potential vulnerabilities in air traffic control systems that could affect flight schedules and safety [1]
空管系统故障致巴黎奥利机场大量航班延误或取消
news flash· 2025-05-19 06:22
Group 1 - The air traffic control system at Paris Orly Airport experienced a failure on May 18, leading to significant flight delays and cancellations [1] - The French Civil Aviation Authority reported that the disruption is expected to continue until May 19 due to the unresolved issues [1]