Workflow
网约车候车区
icon
Search documents
北京发布上半年疏整促“成绩单” 42项任务有序推进
Zhong Guo Xin Wen Wang· 2025-08-19 18:27
Core Viewpoint - The "Relocation, Rectification, and Promotion" initiative in Beijing is making significant progress in urban planning and development, with 42 tasks being implemented effectively by mid-2025 [1] Group 1: Non-Capital Function Relocation - The initiative is advancing the dual approach of internal function restructuring and external relocation, leading to new achievements in the relocation efforts [2] - Educational and healthcare resources are being accelerated towards external layouts, including the opening of the first batch of students at the Beijing Institute of Fashion Technology's Tongzhou campus and the construction of a new pediatric hospital with 1,200 beds [2] - The orderly implementation of cultural relics relocation is underway, with significant sites like the former residences of Prince Chun and the Qing Army and Navy departments starting the relocation process [2] - The logistics center relocation is deepening, with the construction of a smart logistics hub in the Doudian area of Fangshan District [2] Group 2: Urban Fine Governance - The initiative has made solid progress in environmental remediation, traffic order, and key area challenges, including the completion of 10.71 million square meters of illegal construction remediation [3] - The city has reduced and improved urban furniture, managing over 50,000 locations and addressing more than 500 instances of illegal setups [3] - Traffic order has been systematically managed, with enhancements at 36 subway stations and the addition of over 7,000 non-motorized vehicle parking spaces [3] - Key transportation hubs like Beijing West Station and Beijing Station have improved passenger experiences through better facilities and services [3] Group 3: Urban Quality Enhancement - The initiative focuses on improving living conditions, enhancing public spaces, and promoting green development, resulting in tangible benefits for residents [4] - The "one community, one plan" approach has been implemented in 129 old residential areas, transforming them into livable communities [4] - Public space utilization has been optimized, with 234 bridges undergoing environmental improvements and the addition of 42,000 parking spaces in central areas [4] - The city is enhancing its green infrastructure by converting 353.29 hectares of land into green spaces and constructing 10 tree-lined roads [4]
沈阳机场出租车与网约车停车功能区升级 在桃仙机场打车更方便了
Liao Ning Ri Bao· 2025-07-09 01:37
Group 1 - The core viewpoint of the article highlights the significant upgrades made to the taxi and ride-hailing parking areas at Shenyang Airport, enhancing convenience for travelers [1] - The taxi waiting area project covers approximately 12,000 square meters, achieving breakthroughs in smart management, functional improvement, and capacity upgrade [2] - The upgraded taxi area features an intelligent dispatch system that monitors real-time vehicle and passenger flow, reducing waiting times for travelers and allowing drivers to take breaks to prevent fatigue [2] Group 2 - The ride-hailing waiting area project spans about 1,700 square meters, with an expected daily service capacity of over 5,000 passengers, significantly improving ride-hailing efficiency and traveler experience [3] - The smart upgrade in the ride-hailing area includes high-precision positioning and real-time data analysis, reducing average waiting time by 35% for passengers [3] - The airport collaborates with ride-hailing platforms and industry management departments to optimize dispatch algorithms and enhance vehicle turnover efficiency, ensuring a safe and convenient travel environment for passengers [3]