Workflow
陇东—山东±800千伏特高压直流工程
icon
Search documents
山东政商要情(5.5—5.11)
Jing Ji Guan Cha Bao· 2025-05-11 07:31
Group 1: Energy Infrastructure - The Longdong-Shandong ±800 kV UHVDC project is China's first "integrated wind-solar-thermal-storage" large-scale energy delivery project, capable of transmitting over 36 billion kWh of electricity annually to Shandong, with more than 50% from green energy sources [1][2] - The project will meet approximately 4% of Shandong's annual electricity demand, significantly contributing to ecological protection and high-quality development in the Yellow River basin [1][2] Group 2: Economic Development Initiatives - Shandong has introduced 23 new policies to enhance the Shanghai Cooperation Organization (SCO) demonstration zone, focusing on comprehensive reform, major platform construction, economic and trade cooperation, and optimizing the development environment [3][4] - The policies aim to accelerate the development of the SCO demonstration zone, positioning it as a high-level open economic area [4] Group 3: Rural Development - Shandong's government has released 20 measures to promote high-quality rural industries, targeting a per capita disposable income of over 30,000 yuan for farmers by 2027 [5][6] - The focus is on developing six key agricultural sectors and enhancing the processing of agricultural products to increase value and employment opportunities [6] Group 4: Supply Chain and Industrial Upgrades - The "Ten Chains, Hundred Groups, Thousand Enterprises" initiative aims to enhance supply chain resilience and support over 100,000 small and medium-sized enterprises through a structured chain management system [7][8] - The initiative includes the identification of key industrial chains and the development of supportive policies to drive investment and technological upgrades [8] Group 5: Youth Employment and Entrepreneurship - Shandong has implemented 26 measures to promote youth employment and entrepreneurship, focusing on service systems, expanding job channels, and creating supportive environments for young people [9][10] - The measures include establishing youth employment practice bases and promoting new job opportunities tailored for young individuals [9][10]
陇东风光扮靓齐鲁灯光!陇东-山东±800千伏特高压工程投产
Qi Lu Wan Bao· 2025-05-08 07:15
Core Insights - The completion and commissioning of the Longdong-Shandong ±800 kV UHVDC project marks China's first large-scale integrated energy base for wind, solar, and thermal power, facilitating cross-regional energy resource optimization and addressing energy shortages in North China while leveraging abundant resources in the West [1][4] Group 1: Project Overview - The Longdong-Shandong project has a total investment of 20.2 billion yuan and spans 915 kilometers, utilizing ±800 kV rated voltage and 8 million kW rated capacity, making it the first UHVDC project to be fully commissioned at once [4] - The project is expected to deliver 36 billion kWh of electricity annually to Shandong, equivalent to the annual electricity consumption of 10 million households, while reducing carbon dioxide emissions by approximately 16 million tons and replacing 6 million tons of coal [2][4] Group 2: Technological Advancements - The project incorporates domestically developed key technologies, including a transformer with load tap changer and DC control protection based on domestic chips, enhancing the resilience and control of China's high-end power transmission and transformation equipment supply chain [7] - The successful implementation of the project has established a new benchmark for UHV construction, marking a transition to standardized and large-scale development in the sector [7] Group 3: Strategic Importance - The project supports the construction of the "Shagouhuan" new energy base and the large-scale development of renewable energy, contributing to the high-quality development of Gansu and Shandong provinces and promoting regional coordinated development [1][4] - It plays a crucial role in enhancing the electricity supply capacity to Shandong, increasing it to 38 million kW, thereby ensuring safe and green energy use during peak summer demand [2][4]