Workflow
CAP1000机组
icon
Search documents
电投产融:百万千瓦级压水堆核电机组普遍配套建设一定规模的制氢系统
Zheng Quan Ri Bao Wang· 2026-01-13 09:14
Core Viewpoint - The company Electric Power Investment Corporation (000958) is actively exploring the integration of hydrogen production and seawater desalination with its nuclear power projects, leveraging the capabilities of its CAP1000 and CAP1400 reactor models [1] Group 1: Hydrogen Production - The CAP1000 and CAP1400 nuclear reactor models are designed to support hydrogen production systems, primarily for internal equipment hydrogen supply [1] - These reactors can utilize stable and clean base-load power to enable water electrolysis for hydrogen production, integrating with established PEM electrolysis technologies [1] Group 2: Seawater Desalination - The CAP1000 and CAP1400 models also possess the capability to implement seawater desalination using membrane or thermal methods [1] - The company plans to adapt its nuclear energy applications to meet the economic and social development needs of specific project locations [1]
【电新】25年新增核准10台核电机组,可控核聚变领域近期频现突破——碳中和领域动态跟踪(一百五十七)(殷中枢/郝骞/宋黎超)
光大证券研究· 2025-04-28 09:07
点击注册小程序 查看完整报告 特别申明: 本订阅号中所涉及的证券研究信息由光大证券研究所编写,仅面向光大证券专业投资者客户,用作新媒体形势下研究 信息和研究观点的沟通交流。非光大证券专业投资者客户,请勿订阅、接收或使用本订阅号中的任何信息。本订阅号 难以设置访问权限,若给您造成不便,敬请谅解。光大证券研究所不会因关注、收到或阅读本订阅号推送内容而视相 关人员为光大证券的客户。 报告摘要 事件: 4月27日,经国务院常务会议审议,决定核准三门核电三期工程等5个核电项目,合计10台机组 。 真实能量,预计在2027年底建成。 ( 3)下一代"人造太阳"——中国聚变工程示范堆( CFEDR)正在开 展工程设计,未来将瞄准建设世界首个聚变示范电站。 风险分析: 项目建设进度不及预期、 政策变化致项目核准进度不及预期 、 原材料价格上涨风险。 发布日期: 2025-04-28 免责声明 本订阅号是光大证券股份有限公司研究所(以下简称"光大证券研究所")依法设立、独立 我国核电项目审批已经进入规模化核准阶段 根据《中国能源报》内容,此次核准的 5个核电机组具体为中核三门核电5、6号机组、中广核广西防城港 核电5、6号机组 ...