新能源公交
Search documents
预算13.14亿元!大连将采购1096辆新能源公交车
第一商用车网· 2025-10-12 13:30
Group 1 - The core viewpoint of the article highlights the procurement announcement by Dalian Public Transport Group for the replacement of old buses with new energy city buses, with a total budget of approximately 1.314 billion yuan (about 131.39 million) [1] - The project aims to procure 1,096 pure electric city buses along with an 8-year full lifecycle maintenance service [1] - The bidding process is scheduled to take place on November 3, 2025, through an online platform [1] Group 2 - The procurement is divided into four lots, including various types of pure electric buses, such as 500 units of 12-meter buses and 55 units of 8-meter buses in the first lot [2] - The second lot includes 36 units of 11-meter buses and 10 units of double-decker buses [2] - The third lot consists of 135 units of 8-meter buses, while the fourth lot includes 360 units of 10-meter buses [2]
60辆新能源公交车招标!
第一商用车网· 2025-10-03 12:53
Core Viewpoint - The Jilin Province's Jianshi New Source Passenger Transport Co., Ltd. has announced a project to purchase 60 new energy buses with a budget of 37.42 million yuan [1][3]. Group 1: Project Overview - The project involves the procurement of 60 large pure electric buses, with the tender being divided into one section [4]. - The funding for the project is sourced from self-raised funds amounting to 37.42 million yuan [3]. Group 2: Tender Conditions - The project has been approved by the relevant authorities and is now open for public tender [3]. - Bidders must meet specific qualifications, including having independent legal status, a valid business license, and financial stability over the past three years [4][5]. - Joint bids are not accepted for this project [4][6]. Group 3: Bid Submission Details - Bidders can obtain the tender documents online from September 29, 2025, to October 11, 2025 [7]. - The deadline for submitting bid documents is October 21, 2025, at 09:30 [7]. - The opening of bids will also take place on October 21, 2025, at the specified location [7].
420辆纯电动公交车招标!
第一商用车网· 2025-09-11 11:30
Core Viewpoint - Zhuhai Bus Company plans to purchase 420 pure electric buses by 2025, with a total budget of 433 million yuan [1][3]. Group 1: Project Details - The project consists of three packages, with specific delivery schedules for different types of buses, including 6-meter, 8.5-meter, 10.5-meter, and 12-meter models [1][3]. - The budget for the first package is 53.05 million yuan, the second package is 21.2 million yuan, and the third package is 358.7 million yuan [1][2][3]. - Delivery dates range from January 1, 2026, to May 31, 2026, with varying quantities for each type of bus [1][3]. Group 2: Bidder Qualifications - Bidders must be registered legal entities in China and provide relevant documentation, including business licenses and manufacturer declarations [1][2][3]. - Vehicles must be included in the Ministry of Industry and Information Technology's approved lists for electric vehicles [1][2][3]. - Bidders must not be listed on any serious credit violation lists and must provide credit information from specified platforms [1][2][3]. Group 3: Submission and Contact Information - The deadline for bid submission is September 29, 2025, at 09:30 AM, with the opening of bids occurring at the same time [6]. - Contact information for the bidding agency and the bus company is provided for inquiries and clarifications [8][9].
47辆新能源公交车招标
第一商用车网· 2025-09-01 03:32
Group 1 - The core viewpoint of the article is the announcement of the procurement of 47 new energy buses by Yichang Public Transport Group, which includes two separate bidding projects for 25 units of 10-meter buses and 22 units of 18-meter buses [1][12][22]. Group 2 - The bidding announcement for the 25 units of 10-meter new energy buses was published on August 29, 2025, with a bid submission deadline of September 22, 2025 [3][11]. - The contract performance period for the 10-meter buses is set to be completed within 45 calendar days from the signing of the contract [3][15]. - The bidding announcement for the 22 units of 18-meter new energy buses was published on August 30, 2025, with a bid submission deadline of September 23, 2025 [12][22]. - The contract performance period for the 18-meter buses is required to be completed by December 15, 2025 [15][22]. Group 3 - Bidders can participate in both bidding projects but can only win one bid segment [9][23]. - The project is funded through a World Bank loan and self-raised funds by the company [13]. - The procurement aims to enhance the public transport fleet with new energy vehicles, aligning with environmental sustainability goals [1][12]. Group 4 - The bidding documents can be downloaded online from the Yichang Public Resource Trading Electronic Service System from August 29 to September 8, 2025, for the 10-meter buses, and from August 30 to September 9, 2025, for the 18-meter buses [6][21]. - No bid security deposit is required for this project [7][22]. - Bidders must submit their electronic bidding documents through the designated electronic trading platform before the specified deadlines [10][23].
3亿元招标341辆新能源公交,谁会中标?
第一商用车网· 2025-08-23 13:29
Core Viewpoint - Ningbo Public Transport Group Co., Ltd. has announced a tender for the procurement of 341 pure electric buses for 2025, with a total budget of approximately 324.95 million yuan (about 32.5 million USD) [1] Group 1: Tender Conditions - The project is funded entirely by self-raised funds and is not a legally required tender project [2] - The tender is open to domestic bidders and has met the conditions for public bidding [2] Group 2: Project Overview - The procurement consists of four segments, with specific quantities and types of buses detailed for each segment [4] - Segment 1 includes 155 units of 10.5-meter pure electric buses, Segment 2 includes 90 units of 8.5-meter buses, Segment 3 includes 79 units of 8.5-meter buses, and Segment 4 includes 17 units of 7-meter buses [4] - The maximum price per unit for each segment is specified, with Segment 1 at 1,078,429 yuan, Segment 2 at 869,571 yuan, Segment 3 at 856,143 yuan, and Segment 4 at 699,833 yuan [4] Group 3: Bidder Qualifications - Bidders must possess a valid business license and demonstrate good commercial reputation and financial accounting systems [7] - Bidders should not be listed as untrustworthy by relevant authorities and must not have major legal violations in the past three years [8][9] Group 4: Bid Submission and Opening - Bids must be submitted electronically by September 2, 2025, at 09:30 AM (Beijing time) [20] - The opening of bids will occur on the same day and will be conducted online, allowing bidders to view the process live [24] Group 5: Other Important Notes - Bidders must ensure that they do not have direct control or management relationships with other bidders in the same segment [26] - The system usage fee for the bidding platform is specified, and bidders must comply with the platform's operational guidelines [29]
6300万元公交车招标大单来了
第一商用车网· 2025-08-20 06:58
Group 1 - The core viewpoint of the article is the procurement of electric buses by Shanghai Xiantong Rapid Bus Construction Management Co., Ltd., which includes the purchase of 20 units of 18-meter fast-charging electric buses and 15 units of 12-meter fast-charging electric buses, totaling 35 units with a total budget of 63 million yuan [1][3][12] Group 2 - The project for the 18-meter electric bus has a budget of 42 million yuan and requires an 8-year warranty for the vehicles [3][6] - The deadline for submitting bids for the 18-meter bus project is September 8, 2025, at 11:00 AM Beijing time [2][8] - The project for the 12-meter electric bus has a budget of 21 million yuan, with a similar warranty requirement [12][14] - The deadline for submitting bids for the 12-meter bus project is also September 8, 2025, but at 10:30 AM Beijing time [21] Group 3 - The procurement is open to various types of suppliers, including large, medium, small, and micro enterprises, as well as social organizations [6][19] - The procurement process emphasizes compliance with government procurement laws and policies, particularly those promoting energy-saving and environmentally friendly products [6][18] Group 4 - The procurement documents for both projects can be obtained online through specified channels, with a document fee of 2000 yuan [8][20] - The contracts for both projects require delivery and completion of vehicle registration by November 5, 2025 [4][15]
宇通连中三标!
第一商用车网· 2025-08-19 06:08
Core Viewpoint - Yutong Bus has recently secured three contracts for electric bus battery replacement projects, indicating a strong position in the electric vehicle market and potential growth in public transportation electrification [1][15]. Group 1: Project Wins - On August 13, Yutong Bus won a contract for the battery replacement of 20 electric buses for Jiangmen Public Bus Company, with a bid amount of 2.59348 million yuan [2][3]. - On the same day, Yutong also secured a contract for the battery replacement of 30 electric buses for Jiangmen Cultural Tourism Transportation Investment Group, with a bid amount of 3.89022 million yuan [9][10]. - On August 15, Yutong was awarded the contract for the 2025 Urban New Energy Bus Procurement Project in Yishui, with a total contract value of 9 million yuan [15][16]. Group 2: Financial Details - The total value of the contracts won by Yutong Bus amounts to approximately 15.482 million yuan, showcasing the company's capability to secure significant public transportation projects [2][9][15]. - The service fees for the projects are set at 20,000 yuan for the first project and 30,000 yuan for the second project, indicating additional revenue streams for the company [4][11]. Group 3: Market Implications - The successful bids reflect Yutong's competitive edge in the electric bus sector, which is expected to grow as cities increasingly adopt electric public transportation solutions [1][15]. - The contracts align with broader trends in the transportation industry towards sustainability and electrification, positioning Yutong favorably for future opportunities [1][15].
1.91亿元招标180辆公交车!
第一商用车网· 2025-08-17 13:18
Core Viewpoint - The article discusses the recent procurement of 180 pure electric buses in Guizhou Province, with a total budget of 191 million yuan, highlighting the investment estimates for different bus models and the overall significance of this procurement in the context of new energy transportation development [1][2]. Group 1: Procurement Details - The procurement involves 180 pure electric buses with a total budget of 191 million yuan [1]. - The investment estimates for the buses are as follows: EQ802 (80 buses) at 89.12 million yuan, EQ803 (50 buses) at 50.78 million yuan, and EQ804 (50 buses) at 50.78 million yuan [1][2]. Group 2: Project Background - The project is part of the Asian Development Bank's loan for the development of a smart transportation system in the Gui'an New Area [2]. - The total estimated investment for the project is 339.652 million yuan, funded by the Asian Development Bank and domestic matching funds [2]. Group 3: Market Context - The article notes significant growth in the new energy bus market, with companies like Yutong and BYD experiencing substantial increases in sales [6]. - The competitive landscape is highlighted, with various manufacturers vying for market share in the rapidly expanding new energy vehicle sector [6].
总金额超3.46亿元!又一批新能源公交车采购项目来了
第一商用车网· 2025-08-14 10:28
Group 1 - The core viewpoint of the article highlights the ongoing demand for new energy buses, with multiple procurement projects announced on August 13 across various provinces and cities in China, totaling 358 vehicles and a budget exceeding 346 million yuan [1] Group 2 - Inner Mongolia Baotou is procuring 100 new energy buses with a budget of 92 million yuan, indicating a single winning bidder for the project [2][3] - The project in Baotou has specific qualification requirements for bidders, including independent legal status and good credit records [4] Group 3 - Sichuan Chengdu is inviting bids for 79 new energy buses with a total budget of 61.73 million yuan, including different sizes of buses [13][14] - The project in Chengdu also has strict qualification criteria, prohibiting joint bids [16] Group 4 - Shandong Weihai is procuring 50 new energy buses with a total budget of 54.38 million yuan, divided into two packages [21][22] - The procurement includes specific requirements for the buses, such as electric air conditioning and delivery timelines [23] Group 5 - Shanghai Minhang is planning to procure 68 pure electric buses with a total budget of 95 million yuan, with different models specified [27][28] Group 6 - Jiangsu Lianyungang is inviting bids for 19 buses with a total budget of 10.37 million yuan, divided into two segments [29][30] Group 7 - Chongqing Wulong District is procuring 30 new energy electric buses with a budget of 27.6 million yuan, with specific delivery timelines [36][37] Group 8 - Guangxi Liuzhou is inviting bids for 6 pure electric buses with a budget of 4.56 million yuan, emphasizing the need for compliance with national standards [46][47]
超3.3亿元招标350辆纯电公交车!
第一商用车网· 2025-08-13 04:34
Core Viewpoint - Shenzhen Bus Group announced a procurement plan for 350 pure electric buses, with a total financing amount of 331.972 million RMB, indicating a strong push towards electrification in public transport [1][3]. Group 1: Project Overview - The project involves financing leasing for 350 pure electric buses, including 290 low-floor and 60 high-floor buses [3]. - The total financing amount for the project is 331.972 million RMB, with a full post-sale leaseback model [3]. - The financing term is set for 8 years for low-floor buses and 10 years for high-floor buses, aligning with the vehicles' service life [3]. Group 2: Financial and Procurement Details - The controlled interest rate for the financing is set at 3.2% [4]. - The procurement method is open inquiry, with the evaluation method based on the lowest price [4]. - A deposit of 500,000 RMB is required for participation in the bidding process [5]. Group 3: Timeline and Contact Information - The procurement document acquisition starts on August 11, 2025, at 10:00 [5]. - The deadline for submitting response documents is August 21, 2025, at 10:00 [5]. - Contact information for the procurement unit includes a phone number for inquiries [5].