Workflow
桥梁建设
icon
Search documents
全球最大、国内首条……上周末 我国多领域迎来新突破!
Yang Shi Xin Wen· 2025-11-23 22:10
Core Insights - China's "Hualong One" nuclear power unit 2 has successfully connected to the grid, marking a significant advancement in the mass construction of this technology [2] - The completion of the "Hualong One" nuclear power base in Zhangzhou, Fujian, with six units planned, is expected to provide over 60 billion kilowatt-hours of clean energy annually, meeting 75% of the electricity demand for Xiamen and Zhangzhou [4] Clean Energy Industry - China has established the world's largest and most complete clean energy industrial chain, with a significant decrease in coal power's share from 58.7% in 2015 to 33.1% in the first half of 2025 [5] - The country's green hydrogen production capacity exceeds 150,000 tons per year, accounting for over 50% of the global total, with 540 hydrogen refueling stations built, representing 40% of the global share [8] Satellite IoT Business - The commercial trial of China's satellite IoT business has officially started, aimed at supporting the safe and healthy development of emerging industries such as commercial aerospace and low-altitude economy [9] Infrastructure Development - The completion of the world's largest span four-cable-stayed bridge, the Yanjin Changjiang Bridge, with a main span of 1860 meters, adds to China's infrastructure achievements [11] Battery Technology - China has built its first large-capacity all-solid-state battery production line, which is expected to enhance electric vehicle range from 500 kilometers to over 1000 kilometers [13] - The production line is currently undergoing small batch testing, with plans for mass production between 2027 and 2030 [15]
奋战四季度 确保全年红丨平高铁洛阳黄河公铁大桥:助力畅通豫西发展新通道
He Nan Ri Bao· 2025-11-22 23:22
Core Insights - The construction of the Jiaoluo-Ping High-Speed Railway, particularly the Luoyang Yellow River Road-Rail Bridge, is a significant part of the national "Eight Vertical and Eight Horizontal" transportation network, aimed at enhancing regional collaboration and development [2][4] - The bridge, measuring 13.36 kilometers in length, features a dual-layer design with an upper layer for road traffic and a lower layer for high-speed rail, designed for speeds of up to 350 km/h [2][4] - The project faces considerable challenges, including environmental protection, safety risks, and complex construction conditions due to its location near sensitive areas and the Yellow River [3][4] Construction Details - The Jiaoluo-Ping High-Speed Railway spans 230 kilometers and connects four cities: Jiaozuo, Jiyuan, Luoyang, and Pingdingshan, facilitating regional economic growth [2] - The bridge's design includes innovative structural elements, such as a large span of 4×180 meters for the main steel truss, which sets a record for similar bridges in China [2] - The project employs advanced construction techniques, including automated and information-based equipment, to enhance efficiency and minimize environmental impact [3] Winter Construction Measures - A specialized winter construction plan has been implemented to ensure progress during colder months, including heating systems for materials and safety measures for workers [4] - The project team emphasizes safety, with strict regulations against open flames and regular inspections of electrical equipment [4] Economic Impact - Once completed, the bridge is expected to significantly improve transportation capacity and efficiency across the Yellow River, enhancing connectivity for the western Henan region and stimulating growth in tourism and logistics sectors [4]
黑龙江省最长高速公路桥梁完成主桥体系转换关键工序
Zhong Guo Xin Wen Wang· 2025-11-22 11:29
(文章来源:中国新闻网) 中新网哈尔滨11月22日电 22日,记者从黑龙江省交通运输厅获悉,日前,总重达1.17万吨的松花江特大 桥主桥钢箱梁完美脱离顶推临时支架,顺利完成主桥体系转换关键工序,这一标志性进展不仅展现了黑 龙江省在严寒地区桥梁建设领域的卓越技术实力,更标志着我国在寒区大跨度自锚式悬索桥建设领域取 得的又一突破性进展。 项目团队针对大跨度空间缆索夹角度调整难度大、大倾角索夹滑移风险高、吊索入锚难度大、张拉轮次 多等难题,提前制定应对方案,围绕体系转换的荷载转移逻辑、重力释放过程及钢支墩支撑稳定性等关 键环节反复推演模拟,并创新采用"跳拉法"进行吊杆张拉与主索鞍顶推作业,以非线性顺序同步实施吊 杆张拉与主索鞍顶推。运用自主研发的智能缆索安装设备与液压同步顶升系统,精密控制吊索、斜拉索 张拉过程,集成缆索智能检测功能的巡检装备全程监测桥梁健康状态,智慧工地指挥中心实时预警施工 风险,以毫米级精度全程监控主缆、吊索等构件的线形、垂度、张力等参数变化,确保主桥上部结构荷 载由临时支架平稳过渡至永久缆索系统,同步实现从临时支撑到永久受力体系的无缝转换。 作为东北三省一区范围内跨径最大的自锚式悬索桥、黑龙江 ...
世界最大跨径四主缆悬索桥燕矶长江大桥合龙
Zhong Guo Xin Wen Wang· 2025-11-22 10:22
Core Viewpoint - The completion of the Yanjing Yangtze River Bridge marks a significant achievement as it is recognized as the world's largest span four-cable suspension bridge, with the main structure now finished [1][2]. Group 1: Project Overview - The Yanjing Yangtze River Bridge spans approximately 26 kilometers, featuring a main span of 1860 meters. The upper deck accommodates a six-lane expressway with a design speed of 100 km/h, while the lower deck serves a four-lane urban expressway with a design speed of 80 km/h [2]. - The bridge's main tower stands at 184 meters, achieving an unprecedented span-to-height ratio of 1:15 among thousand-meter-level suspension bridges [2]. Group 2: Technical Innovations - The construction team implemented a world-first design of a double-layer suspension bridge with different cable heights and lengths, which helps distribute loads and enhance stability [2]. - A total of 69 beam segments were used in the main span, with each standard segment measuring 27 meters in length, 41 meters in width, and 9.5 meters in height, weighing approximately 830 tons. The total weight of the bridge is around 56,000 tons [5]. Group 3: Construction Techniques - The project utilized 1436 suspension cables and introduced a large-scale application of fully welded cable clamps, totaling 544 sets, which contributed to the lightweight and standardized manufacturing of the clamps [5][6]. - Precise monitoring and measurement of environmental factors such as temperature and wind were conducted to ensure the accurate installation of the steel beams, achieving millimeter-level precision during the final assembly [6]. Group 4: Economic Impact - The Yanjing Yangtze River Bridge is a critical infrastructure project that connects Ezhou and Huanggang, enhancing economic and transportation links between the two cities and significantly improving the regional comprehensive transportation system, including road, rail, water, and air [6].
湖北燕矶长江大桥合龙
Xin Hua Wang· 2025-11-22 07:43
燕矶长江大桥横跨鄂州、黄冈两地,采用"一跨过江"设计,项目全长约26千米,大桥主跨1860米,上层为六车道高速公路,设计时速100公 里,下层为四车道城市快速路,设计时速80公里。 11月22日,湖北燕矶长江大桥顺利合龙。(葛利龙 摄/新华社发) 因上受花湖机场航空限高影响,下要满足长江通航需要,燕矶长江大桥主塔高度仅184米,垂跨比也达到了千米级悬索桥中前所未有的1:15。 为解决这一结构难题,建设团队采用不同垂度四主缆双层悬索桥结构体系,其同侧主缆高度、长度、垂度均不同,以此分散荷载,并提高桥梁的 稳定性,且优化了索鞍及主缆规模,使主缆受力更合理。 燕矶长江大桥所在江面宽阔、水文条件复杂、四主缆钢桁梁吊装精度要求高。"为保障大桥顺利合龙,我们精确计算温度、风力等环境因素对 钢桁梁形变的影响,最终钢桁梁以毫米级的精度平稳嵌入预定位置,南北两岸顺利'牵手'。"中交二航局燕矶长江大桥项目总工程师罗航说。 11月22日上午,随着最后一段巨型钢桁梁精准吊装到位,由湖北交投投资、中交二航局和中铁大桥局承建的湖北燕矶长江大桥顺利合龙,长 江武汉段再添一道"飞虹"。 11月22日,湖北燕矶长江大桥顺利合龙。(陆落义 摄/ ...
两万吨“巨无霸”凌空“转身” 新疆百里风区上演“空中芭蕾”
Xin Hua She· 2025-11-19 13:56
Core Viewpoint - The G30 Lianhuo Expressway Hatu Section expansion project features the largest rotating bridge in Xinjiang, utilizing innovative construction methods to minimize disruption to railway operations [1][2]. Group 1: Project Overview - The G30 Lianhuo Expressway Hatu Section expansion project spans 345 kilometers and is a key project in the national expressway network [2]. - The project includes the construction of a T-shaped continuous beam bridge that was rotated 61 degrees with millimeter-level precision, completed in 70 minutes [1]. Group 2: Construction Techniques - The project team overcame harsh weather and complex geological conditions by integrating information technology into construction processes, employing techniques such as 3D intelligent paving and unmanned compaction machinery [2]. - The use of the rotation method for bridge construction was chosen to avoid risks to railway operations and to ensure zero disruption during the construction phase [1]. Group 3: Significance - Upon completion, the expansion project is expected to significantly enhance regional traffic efficiency and contribute to the high-quality development of transportation in Xinjiang, as well as the overall national transportation network [2].
世界在建最大跨径公轨两用悬索桥完成首节钢桁梁吊装
Xin Hua She· 2025-11-17 04:44
黄桷沱长江大桥是渝长高速复线连接道工程的控制性节点工程,联系重庆主城区长江南北两岸,全长 1260米,主跨765米,为单跨悬吊双塔三跨连续钢桁梁悬索桥,是世界在建最大跨径公轨两用悬索桥, 大桥采用双层桥面设计,上层为6车道内环快速路,下层中央预留双向轨道,两侧为4车道城市主干路。 作者:陈诚、黎华玲、林意俊 近日,位于重庆的黄桷沱长江大桥顺利完成首节钢桁梁吊装工作,标志着大桥正式转入主梁结构拼装阶 段,为主桥合龙奠定坚实基础。 ...
沈海高速上跨胶济、胶新铁路立交桥钢箱梁完成转体施工
Zhong Guo Xin Wen Wang· 2025-11-13 14:17
Core Viewpoint - The successful completion of the steel box girder rotation for the upgrade of the Shenhai Expressway marks a significant technical achievement, laying a solid foundation for the project's full connectivity [1][5]. Group 1: Project Overview - The Shenhai Expressway spans 359.079 kilometers within Shandong Province and is being upgraded to a dual eight-lane highway with a design speed of 120 km/h [3]. - The bridge, constructed by China Railway 10th Bureau, is located near the northern outer ring of Jiaozhou City and measures 275 meters in length [3]. - The steel box girder used in the bridge weighs 5,286 tons, making it the largest unequal span railway crossing steel box girder project in Shandong Province [3]. Group 2: Material and Structural Innovations - The entire bridge is made of weathering steel, which eliminates the need for traditional rust-proof coatings, thus saving construction time and extending the bridge's lifespan while reducing future maintenance costs [3][4]. - The bridge employs a fully welded structure, moving away from traditional bolt connections to mitigate risks associated with bolt loosening and replacement difficulties [3][4]. Group 3: Construction Challenges and Solutions - The bridge crosses two major railway lines, with over a hundred passenger and freight trains passing through the construction area daily, necessitating precise operations within limited time windows [4]. - Advanced technologies such as hole detection instruments and electronic curtain systems were utilized to ensure safety and precision during the critical rotation process [4]. - The project team implemented intelligent construction techniques to accurately calculate traction and safety factors, establishing a dynamic correction model to support the precise rotation [4][5]. Group 4: Strategic Importance - The Shenhai Expressway upgrade is a key project under Shandong Province's "14th Five-Year Plan" for comprehensive transportation, connecting several strategic development zones and important transportation hubs [5]. - Upon completion, the project is expected to enhance regional transportation service levels, optimize network structure, and promote economic integration in the Jiaodong Economic Circle [5].
国内首座三塔四跨“O”形矮塔斜拉桥通车
Ke Ji Ri Bao· 2025-11-12 09:31
Core Points - The Yili River Third Bridge, the first three-tower four-span "O" shape cable-stayed bridge in China, officially opened on November 11, marking a significant breakthrough in bridge structure design and contributing to the Belt and Road Initiative and high-quality development in Xinjiang [1][2] - The bridge spans 2028 meters in length and 23.5 meters in width, designed for a dual four-lane highway standard with a speed limit of 60 km/h [1] - The main bridge features a unique design with a main span of 492 meters and a central tower height of 51 meters, constructed using C50 concrete and "O" shape steel structures [1] Project Details - The bridge connects the Horgos Economic Development Zone in Yining to the north and the northern side of the Chabuchar Yili River National Wetland Park to the south, significantly reducing travel time from 1.5 hours to several minutes [2] - It links key areas such as Horgos City, Yining City, Chabuchar County, and Zhaosu County, facilitating the transportation of specialty agricultural products and tourism development [2] - The project involved the manufacturing, installation, and coating of approximately 4532 tons of steel structures, with significant challenges in construction due to complex design and environmental factors [1]
002480,重大资产重组
Zhong Guo Ji Jin Bao· 2025-11-08 13:56
Core Viewpoint - The company plans to strategically exit its magnetic levitation and bridge component businesses while focusing on clean energy generation through significant asset restructuring involving the sale and acquisition of various subsidiaries and assets [1][3]. Group 1: Asset Transactions - The company intends to sell 100% equity of Chuanfa Maglev and related assets to Shudao Group's subsidiary, Shudao Rail Transit Group, for 1.392 billion yuan [2]. - The company will also sell 100% equity of Xinzhong Jiaoke and related assets to Sichuan Road and Bridge for an undisclosed amount, with the transaction aimed at enhancing the latter's competitive edge in bridge construction [2]. - The company plans to acquire 60% equity of Shudao Clean Energy from Shudao Group for 5.814 billion yuan, with the transaction constituting a major asset restructuring [1][4]. Group 2: Financial Performance - The company has reported continuous losses for four consecutive years, with total losses amounting to 1.55 billion yuan from 2021 to 2024 [8]. - The company's net profits for the years 2021 to 2024 were -233 million yuan, -566 million yuan, -342 million yuan, and -409 million yuan, respectively [8]. - As of the first three quarters of 2025, the company reported a loss of 42.29 million yuan [8]. Group 3: Strategic Shift - The company aims to focus on clean energy generation, marking a significant shift from its previous core businesses, which have struggled to achieve market breakthroughs and profitability [3][10]. - The decision to exit the magnetic levitation and bridge component sectors is driven by the low conversion efficiency of maglev technology and increasing competition in the bridge component industry [2][10]. Group 4: Leadership Changes - The company's chairman resigned in September 2025, following a period of significant financial losses, with total losses exceeding 1.8 billion yuan during his tenure [10].