半导体用光刻胶及配套树脂
Search documents
江苏艾森半导体材料股份有限公司第三届董事会第二十二次会议决议公告
Shang Hai Zheng Quan Bao· 2026-01-27 19:48
Core Viewpoint - Jiangsu Aisen Semiconductor Materials Co., Ltd. plans to establish a wholly-owned subsidiary in Nantong Economic and Technological Development Zone to invest in the Aisen Integrated Circuit Materials East China Manufacturing Base project, with a total estimated investment of 2 billion RMB [3][26][31]. Group 1: Board Meeting Summary - All directors attended the board meeting, and no directors opposed or abstained from voting [2][4]. - The board meeting was convened on January 27, 2026, and complied with relevant laws and regulations [2][3]. - The board approved the proposal to sign the project investment agreement and establish a wholly-owned subsidiary [3][5]. Group 2: Project Investment Details - The total estimated investment for the project is 2 billion RMB, with the final amount based on actual construction costs [3][27][31]. - The project will be constructed in two phases, with the first phase expected to be operational by 2028 and the second phase by 2030, reaching full production by 2035 [28][40]. - The project will cover approximately 159 acres and aims to produce 23,000 tons of integrated circuit materials annually [31][38]. Group 3: Shareholder Meeting Information - The company plans to hold its first extraordinary shareholder meeting on February 12, 2026, to review the investment proposal [6][10]. - The meeting will allow for both on-site and online voting, with specific timeframes for participation [11][12]. - Shareholders must register to attend the meeting, with detailed registration procedures provided [19][20].
艾森股份:拟投建集成电路材料华东制造基地项目
Bei Ke Cai Jing· 2026-01-27 11:16
Core Viewpoint - The company plans to establish a wholly-owned subsidiary in Nantong Economic and Technological Development Zone to invest in the construction of a semiconductor materials manufacturing base, with a total investment of 2 billion RMB [1] Group 1: Project Details - The project will be developed in two phases, with the first phase expected to commence production in 2028 and the second phase in 2030 [1] - The overall project is anticipated to reach full production capacity by 2035 [1] Group 2: Products and Funding - The manufacturing base will primarily produce semiconductor photoresists, supporting resins, electroplating solutions, and high-purity reagents [1] - Funding for the project will come from the company's own resources and self-raised funds, with potential future financing through debt or equity [1]