Workflow
沪杭高铁
icon
Search documents
新沪杭高铁获批 预计2029年建成
Core Viewpoint - The National Development and Reform Commission has approved the feasibility study report for the new Shanghai-Hangzhou high-speed railway, which will enhance connectivity in the Yangtze River Delta region and is expected to be completed by 2029 [1][2]. Group 1: Project Overview - The new Shanghai-Hangzhou high-speed railway, also known as "New Shanghai to Hangzhou High-Speed Railway," has a total investment of approximately 67.097 billion yuan and a length of about 223.8 kilometers [1]. - The railway will serve as an important part of the "Eight Vertical and Eight Horizontal" high-speed rail network and is expected to start construction in 2025 and be completed in 2029 [1]. - The railway will connect major cities in the Yangtze River Delta, including Shanghai and Hangzhou, and will facilitate passenger flow between these regions and other economic areas [1]. Group 2: Environmental and Technical Aspects - The environmental impact report indicates that the railway will run through Shanghai and Zhejiang provinces, with a total of 9 stations planned along the route [1]. - The design speed of the railway is targeted at 350 kilometers per hour, with a construction period of four years [1]. Group 3: Current Infrastructure and Demand - The existing Shanghai-Hangzhou high-speed railway, operational since 2010, has seen a significant increase in passenger traffic, with daily train departures rising from 50 pairs to 148 pairs, indicating a saturation of current capacity [2]. - The new railway will enhance access to Shanghai East Station, which is being developed as a major transportation hub, allowing direct high-speed train access to Pudong Airport for residents of Jiaxing and Hangzhou [2].
沪杭,新增一条高铁!
Guo Ji Jin Rong Bao· 2025-08-22 13:03
Core Viewpoint - The approval of the feasibility study for the new Shanghai-Hangzhou high-speed railway marks a significant step towards addressing the increasing transportation demand between the two cities, which has become particularly acute during holidays and peak travel times [1][2]. Group 1: Project Overview - The new high-speed railway, referred to as the "Shanghai-Hangzhou High-Speed Railway Phase II," will connect Shanghai and Hangzhou directly, covering a distance of approximately 223.8 kilometers with a total investment of about 67.097 billion yuan [2]. - The railway will have a design speed of 350 kilometers per hour and will include stations at Shanghai East, Jiaxing South, and Hangzhou West [2][4]. - The approval of the feasibility study is a crucial milestone, indicating that the project is moving closer to construction [2]. Group 2: Demand and Capacity - Since the opening of the original Shanghai-Hangzhou high-speed railway in 2010, the demand for cross-city travel has surged, with over 100 daily train services between Shanghai Hongqiao and Hangzhou East, yet ticket availability remains tight [4]. - The new railway is expected to alleviate the passenger flow on the existing line and significantly enhance transportation capacity between the two cities [3][4]. - The Shanghai East Station and Pudong Airport will form a major transportation hub, integrating various transport modes including aviation and rail [4]. Group 3: Future Prospects - The new railway is part of China's broader "Eight Vertical and Eight Horizontal" high-speed rail network and is included in the national "14th Five-Year Plan" for major railway projects [4]. - There are ongoing discussions about a future "super high-speed railway" utilizing magnetic levitation technology, although it is still in the planning stages and not yet under construction [5].
“沪杭高铁二线”来了?
3 6 Ke· 2025-08-22 03:07
Core Viewpoint - The approval of the feasibility study for the new Shanghai-Hangzhou high-speed railway marks a significant step towards its construction, with a total investment of approximately 67.1 billion yuan and a length of about 223.8 kilometers [1][3]. Infrastructure Development - The Shanghai-Hangzhou high-speed railway is a crucial part of the national "Eight Vertical and Eight Horizontal" high-speed rail network and is included in the 102 major railway projects for the 14th Five-Year Plan [3]. - The railway is designed for a speed of 350 km/h and will connect Shanghai East Station to Hangzhou West Station, enhancing connectivity in the Yangtze River Delta region [3][4]. Economic Implications - The average construction cost of the new railway is approximately 300 million yuan per kilometer, which is higher than the 233 million yuan per kilometer for the existing Shanghai-Suzhou-Huzhou railway [3]. - The new railway aims to improve the competitive edge of Hangzhou by providing a more direct connection to Shanghai, addressing the current disparity in high-speed rail connectivity compared to Nanjing [4]. Urban Integration - The new railway is expected to facilitate the integration of Hangzhou into the expanded Shanghai metropolitan area, which now includes five additional cities [4]. - The construction of the Shanghai East Station, which will serve as a major transportation hub, will further enhance the connectivity between the two cities, allowing residents to travel directly to Shanghai Pudong Airport [4][5]. Future Prospects - There is potential for further reduction in travel time between Hangzhou and Shanghai, with plans to shorten the train journey to as little as 15 minutes if future high-speed rail developments are realized [5].
新建上海至杭州高速铁路 可行性研究报告获批
Mei Ri Shang Bao· 2025-08-21 22:23
Core Viewpoint - The approval of the feasibility study for the new Shanghai-Hangzhou high-speed railway marks a significant step towards its construction, with a total investment of approximately 67.1 billion yuan and a length of about 223.8 kilometers [2]. Group 1: Project Overview - The new Shanghai-Hangzhou high-speed railway is an important part of the national "Eight Vertical and Eight Horizontal" high-speed railway network and is included in the 102 major railway projects of the national "14th Five-Year Plan" [2]. - The railway is designed for a speed of 350 kilometers per hour and will connect Shanghai East Station to Hangzhou West Station, passing through several key areas and stations [2]. Group 2: Demand and Benefits - The new railway will serve as the second high-speed rail link between Shanghai and Hangzhou, addressing the increasing demand for cross-city business travel and daily commuting, which has led to ticket shortages on the existing line [3]. - Once completed, the travel time from Hangzhou West Station to Shanghai East Station will be reduced to 40 minutes, enhancing convenience for residents and strengthening the "city integration effect" in the Yangtze River Delta region [3]. - The railway will also connect with the Hangzhou Airport high-speed railway at Tongxiang Station, facilitating better access to both Xiaoshan and Pudong airports [3].
城市24小时 | 造价约3亿元/公里 这条高铁有多重要?
Mei Ri Jing Ji Xin Wen· 2025-08-21 16:03
Group 1 - The feasibility study report for the new Shanghai-Hangzhou high-speed railway has been approved, with a total investment of approximately 67.097 billion yuan and a length of about 223.8 kilometers [1] - The Shanghai-Hangzhou high-speed railway is a key component of the national "Eight Vertical and Eight Horizontal" high-speed railway network and is included in the 102 major railway projects of the 14th Five-Year Plan [1][2] - The average construction cost of the new railway is about 300 million yuan per kilometer, which is higher than the 233 million yuan per kilometer for the existing Shanghai-Suzhou-Lake high-speed railway [1] Group 2 - The new railway will enhance connectivity between Shanghai and Hangzhou, two major cities in the Yangtze River Delta, which is crucial for regional collaboration and urban competition [2] - The Shanghai East Station, the eastern terminus of the new railway, will be part of a large integrated transportation hub that includes the Shanghai Pudong Airport, benefiting residents of both cities [2] - The new railway is expected to significantly reduce travel time between Shanghai and Hangzhou, with future plans to further shorten the travel time to as little as 15 minutes [3]
城市24小时 | 造价约3亿元/公里,这条高铁有多重要?
Mei Ri Jing Ji Xin Wen· 2025-08-21 16:01
Core Viewpoint - The approval of the feasibility study for the new Shanghai-Hangzhou high-speed railway marks a significant step towards its construction, with a total investment of approximately 67.1 billion yuan and a length of about 223.8 kilometers [1][2]. Group 1: Project Overview - The Shanghai-Hangzhou high-speed railway is a crucial part of the national "Eight Vertical and Eight Horizontal" high-speed rail network and is included in the 102 major railway projects for the 14th Five-Year Plan [2]. - The railway is designed for a speed of 350 kilometers per hour and will connect Shanghai East Station to Hangzhou West Station, passing through key areas such as Jiaxing and Tongxiang [2][3]. - The average construction cost of the new railway is approximately 3 billion yuan per kilometer, which is higher than the 2.33 billion yuan per kilometer cost of the existing Huzhou-Su Lake high-speed railway [2]. Group 2: Strategic Importance - The new railway aims to enhance connectivity between Shanghai and Hangzhou, two major cities in the Yangtze River Delta, which is vital for regional development and competition [2][3]. - Currently, there are multiple high-speed rail connections between Nanjing and Shanghai, but fewer direct connections between Hangzhou and Shanghai, highlighting a competitive disadvantage for Hangzhou [3]. - The new railway is expected to facilitate a more direct and efficient connection, potentially reducing travel time between the two cities to as little as 15 minutes in the future [6]. Group 3: Broader Implications - The Shanghai East Station, the eastern terminus of the new railway, will be part of a larger transportation hub that integrates air, rail, and urban transit, benefiting not only Hangzhou but also surrounding cities like Jiaxing [6]. - The project aligns with the broader goals of the "14th Five-Year" modern comprehensive transportation system development plan, which emphasizes strengthening rapid connections between core cities in major urban clusters [3].
沪杭高铁正式获批,杭州人可以直接坐高铁去浦东机场了
第一财经· 2025-08-21 13:12
Core Viewpoint - The newly approved Shanghai-Hangzhou high-speed railway project aims to enhance connectivity between the two cities, facilitating travel and economic interaction, with a total investment of approximately 67.1 billion yuan [1][3]. Group 1: Project Overview - The Shanghai-Hangzhou high-speed railway is designed for a maximum speed of 350 km/h and spans approximately 223.8 kilometers [1]. - The project includes the construction of 9 stations, with 4 new stations and 5 existing stations being expanded or utilized [2][3]. Group 2: Economic and Social Impact - The new railway will significantly improve access for Hangzhou residents to Shanghai's Pudong Airport, enhancing travel convenience for both cities [2].