BIM技术
Search documents
盈建科前三季度实现营收7258.41万元 同比下降3.02%
Zheng Quan Ri Bao Zhi Sheng· 2025-10-27 12:18
Core Insights - The company reported a revenue of 72.5841 million yuan for the first three quarters of 2025, representing a year-on-year decline of 3.02% [1] - The net profit attributable to shareholders was -47.4 million yuan, showing a year-on-year decrease of 25.83% [1] Company Overview - The company, Beijing Yingjianke Software Co., Ltd., was established in 2010 and specializes in software development, sales, and related technical services for various sectors including construction, municipal, electric power, subway, industrial plants, and bridges [1] - It provides BIM standardized products and digital comprehensive solutions specifically for infrastructure industries such as construction, bridges, municipal services, electric power, and water conservancy [1]
董梁高速上跨瓦日铁路立交桥成功转体
Yang Shi Xin Wen· 2025-10-21 14:55
Core Viewpoint - The successful completion of the rotation construction of the overpass bridge on the Dongliang Expressway marks a significant breakthrough in the project, which is crucial for enhancing regional industrial cooperation and cultural tourism exchange in Shandong Province [1][4]. Group 1: Project Details - The overpass bridge is a double-cantilever cable-stayed bridge with spans of 80 meters and 100 meters, and a total rotation length of 177 meters, requiring a counterclockwise rotation of 67.4 degrees [4]. - The bridge weighs 25,000 tons, equivalent to the weight of 20,000 ordinary cars, and is located just 12.9 meters from the nearest railway fence, necessitating high safety standards during construction [1][4]. Group 2: Technological Implementation - The project utilized BIM technology to create a three-dimensional model, allowing for precise predictions of stress points and posture changes during construction [4]. - A BeiDou real-time monitoring system was employed to achieve millimeter-level precision in the completion of the bridge's rotation and alignment [4]. Group 3: Project Significance - The Dongliang Expressway's Shenxin section spans 197.108 kilometers and is designed with a dual four-lane standard, with a planned speed of 120 kilometers per hour [4]. - The completion of this project is expected to significantly promote industrial cooperation and cultural tourism exchanges along the route [4].
大渡河金川水电站进入投产倒计时
Zhong Guo Jing Ji Wang· 2025-10-21 07:47
Core Points - The Jinchuan Hydropower Station has officially entered the countdown to production with the completion of water storage, marking a significant milestone for the National Energy Group [1] - The project has a total installed capacity of 860 megawatts and is a key construction project in Sichuan Province's 14th Five-Year Energy Development Plan [1] Group 1 - The Jinchuan Hydropower Station is located in the Aba Tibetan and Qiang Autonomous Prefecture of Sichuan Province and is the sixth hydropower station in the Dadu River's 28-level planning scheme [1] - The station is expected to generate an average annual power output of approximately 3.5 billion kilowatt-hours, replacing about 1 million tons of coal consumption and reducing carbon dioxide emissions by approximately 2.6 million tons annually [1] - The construction of the station faced significant geological challenges, including deep sediment layers and fractured rock formations, requiring advanced construction techniques [1] Group 2 - The project incorporates Building Information Modeling (BIM) technology to assist in geological analysis, construction simulation, and risk assessment, establishing a national standard for the full lifecycle information model of hydropower projects [1] - An ecological fishway, the longest in Asia, has been constructed to protect migratory fish species in the Dadu River, demonstrating a commitment to environmental conservation [2]
董梁高速建设新进展!山东最长不等跨斜拉转体桥成功转体
Qi Lu Wan Bao· 2025-10-21 06:24
Core Points - The completion of the key control project, the turning construction of the overpass bridge over the Wari Railway, marks a significant milestone for the Dongliang Expressway, which is invested by Shandong Highway Group and constructed by China Railway 14th Bureau [1][3] Group 1: Project Overview - The Dongliang Expressway, specifically the section from Shenhai to Xintai, has successfully completed a critical engineering task with the overpass bridge construction [1][3] - The bridge is located close to the operational line of the Wari Railway, with the nearest edge of the bridge being only 12.9 meters from the railway fence, presenting dual challenges in safety management and construction organization [3] Group 2: Construction Techniques - The project utilized advanced construction techniques, including the seventh-generation dual-side dual-direction anti-slip cable system, which extends the lifespan of the stay cables and ensures the quality of the bridge [3] - BIM technology was employed to create a three-dimensional model for simulating the entire turning process, allowing for precise predictions of stress points and posture changes [3] Group 3: Project Significance - Once completed, the Dongliang Expressway will span a total length of 197.108 kilometers, featuring a dual four-lane standard and a design speed of 120 kilometers per hour, enhancing connectivity between the eastern coastal region and the central-western region of Shandong Province [5] - The expressway is expected to facilitate the timely delivery of fresh seafood and local agricultural products, as well as promote tourism in the Yimeng region, thereby fostering deeper industrial cooperation and cultural exchanges among cities along the route [5]
西十高铁西南联络线跨陇海铁路连续梁成功转体
Shan Xi Ri Bao· 2025-10-19 00:32
Core Points - The successful rotation of the continuous beam across the Longhai Railway marks a significant milestone for the Xi'an East Station and the Southwest Liaison Line of the Xi'an to Ten High-speed Railway project, laying a solid foundation for subsequent engineering progress [2][3] Group 1 - The rotating bridge is a critical and challenging engineering component of the Xi'an to Ten High-speed Railway, being the only rotating bridge that crosses an operational railway line along the entire route [3] - The construction area for the rotation is only 5.3 meters from the safety boundary of the main line, presenting high safety risks and demanding precision in construction technology [3] - To ensure safety and precision during the rotation, the project team utilized BIM technology and software modeling to create a dynamic simulation of the entire rotation process [3] Group 2 - Prior to the official rotation, the project team conducted a trial rotation to collect and adjust parameters, optimizing the rotation process and enabling visual risk management [3] - During the official rotation phase, an information system was employed to monitor the real-time position, speed, and angle of the rotating structure, achieving millimeter-level precision in alignment with design requirements [3] - Comprehensive safety measures were implemented, including electronic intrusion radar barriers, vehicle warning systems, and fully enclosed protective canopies, ensuring a secure construction environment near the operational line [3]
能源早新闻丨晋北采煤沉陷区,百万千瓦风电项目,全面开工
中国能源报· 2025-10-16 22:33
Regulatory Developments - The "Regulations on Fair Access to Oil and Gas Pipeline Facilities" will be implemented starting November 1, 2025, requiring independent operation and financial management for oil and gas pipeline operators [2] - The National Energy Administration emphasizes the need for enhanced safety management for users connected to the grid, mandating strict quality control in equipment design and installation [2] Energy Projects - The first batch of hydrogen energy pilot projects has been announced, supporting 41 projects including integrated green ammonia and hydrogen applications in Inner Mongolia [2] - The world's largest single-unit solar thermal power project has commenced construction in Golmud, Qinghai, with a capacity of 350 MW [3] - The first pumped storage power station in western Henan has officially started generating power, with a total investment of 8.88 billion yuan and a capacity of 1.4 million kilowatts [5] Infrastructure and Technology - The "Nordic Wind" installation vessel, capable of lifting over 3,000 tons, has been delivered in Yantai, marking a technological breakthrough in large-scale wind power installation [4] - The application of Building Information Modeling (BIM) technology is being promoted in major infrastructure projects across various sectors including energy [2] Corporate Developments - The 1 million kilowatt wind power project in the Jinbei coal mining subsidence area has officially started construction, with an investment of approximately 4.09 billion yuan [7]
从深圳速度到深圳精度:湾区之眼的诞生,从数字副本开始
Nan Fang Du Shi Bao· 2025-10-13 07:33
Core Insights - The "Bay Area Eye" is a new cultural landmark in Shenzhen, symbolizing a shift from speed-focused construction to a more intelligent and quality-driven approach in urban development [1][6]. Project Overview - The "Bay Area Eye" covers an area of 66,000 square meters with a total construction area of 131,000 square meters, making it one of the largest bookstores globally and a cultural landmark in Bao'an District [2][3]. - The design concept is inspired by "Heaven and Earth," featuring two circular structures that represent the bookstore and a folk museum, complemented by square buildings [3]. Construction Challenges - The project faced significant complexity due to its large scale and unique architectural features, including numerous curved and large-span structures [3][5]. - The construction team utilized Building Information Modeling (BIM) technology to create a digital twin of the building, allowing for early detection of conflicts and optimization of various systems [4][7]. Technological Innovations - BIM technology enabled the integration of all professional drawings and data, facilitating a "one model to the end" approach, which minimized rework and waste during construction [4]. - A custom intelligent scaffolding software was developed to optimize the arrangement of scaffolding, resulting in a 25% reduction in material usage and increased efficiency [4]. Structural Integrity - The project utilized over 11,000 tons of steel, with significant challenges in connecting the two main areas through a large corridor [5][6]. - A closed-loop workflow involving simulation, measurement, and correction was employed to ensure precision in the construction of complex curved shapes [6]. Future Implications - The data from the "Bay Area Eye" will contribute to a City Information Model (CIM), supporting future smart city initiatives in Shenzhen [7]. - The project reflects a broader trend in Shenzhen, where BIM technology has become a standard in large public buildings and infrastructure projects [7].
富煌钢构创新驱动建筑领域绿色变革
Zheng Quan Ri Bao Zhi Sheng· 2025-10-08 09:35
Core Viewpoint - Anhui Fuhuang Steel Structure Co., Ltd. has established an integrated service system covering design, production, and construction, leveraging its top-level qualifications in construction and design [1] Group 1: Company Achievements - The company has implemented the EPC engineering general contracting model, achieving a reduction in carbon emissions by 14% to 40% throughout the entire lifecycle of projects, aligning with the national "dual carbon" strategy [1] - Fuhuang Steel Structure focuses on low-rise residential buildings, integrated housing, and reinforcement and renovation projects, utilizing layered assembly technology and standardized component systems [1] - The company has successfully completed projects such as the Huai Bei Lin Huan Coal Mine resettlement site and Saudi medical cabins, with a modular design and factory production model that significantly shortens construction time and achieves a cost control accuracy of 95% [1] Group 2: Technological Integration - In the public building sector, projects like Hefei Ziyun Plaza have integrated BIM technology and intelligent construction processes, resulting in complex structures that are both functional and iconic, thereby enhancing building quality [1] - The company plans to deepen its digital management system and promote the standardization and internationalization of engineering services in the future [1]
施工不减速 延榆高铁建设正酣
Shan Xi Ri Bao· 2025-10-08 01:41
Core Points - The construction of the Yan-Yu High-Speed Railway is progressing rapidly, with over 500 workers and more than 50 machines actively engaged in tunnel excavation during the National Day and Mid-Autumn Festival holidays [1][2] - The project is a significant part of the national "eight vertical and eight horizontal" high-speed railway network and is expected to reduce the travel time from Xi'an to Yulin from 5 hours to 2 hours upon completion in 2028 [2] Group 1 - The Yan-Yu High-Speed Railway's 6th section, constructed by the Xi'an Company of the West Chengdu High-Speed Railway and undertaken by China Railway 14th Bureau, spans 21.96 kilometers with a bridge and tunnel ratio of 90.5% [1] - The construction site is located in a challenging geological area characterized by steep slopes and potential geological hazards, necessitating high safety standards and complex construction techniques [1][2] Group 2 - The project team adheres to a "safety first, prevention-oriented, comprehensive management" principle, implementing a leadership presence and key position duty system to monitor high-risk operations [2] - The use of BIM technology allows for dynamic optimization of construction processes, ensuring continuous operation of critical tasks such as excavation and spoil removal during holiday periods [2]
全部标准节梁段吊装完成 中山东环香山大桥预计10月合龙
Nan Fang Ri Bao Wang Luo Ban· 2025-09-29 08:00
Core Insights - The Zhongshan East Ring Expressway project in Guangdong Province has achieved a significant milestone with the completion of the hoisting work for all standard beam segments of the Xiangshan Bridge, marking the final phase of the main structure construction, expected to be completed by the end of October [1] Group 1: Project Details - The Xiangshan Bridge spans 1776 meters with a main span of 880 meters and a tower height of 270 meters, designed as a dual-layer, eight-lane bridge, making it the largest and widest dual-layer steel truss cable-stayed bridge for highways in China [1] - The main beam consists of 79 segments, weighing approximately 79,000 tons in total, with each standard segment measuring 25.6 meters in length, 42.2 meters in width, and 15.6 meters in height, exceeding 1200 tons in weight [1] Group 2: Technology and Safety Measures - The project team utilized BIM technology for digital simulation to optimize the hoisting plan, ensuring precision in the assembly of the large segments [1] - The intelligent bridge deck hoisting machine on-site features real-time monitoring capabilities, automatically tracking weight, height, amplitude, and stress data at critical points, with an immediate alarm system to halt operations in case of anomalies, ensuring safety during the hoisting process [1]