供热
Search documents
事关供暖!北京5区已宣布点火调试时间
Xin Jing Bao· 2025-11-06 06:53
Heating Supply Overview - Beijing's heating supply period is from November 15 to March 15, with early activation in extreme cold weather when temperatures drop below 5°C for five consecutive days [1] - The city's heating departments are prepared to provide heating services as needed, with a unified ignition trial run scheduled for November 7 [1] District-Specific Heating Updates - Dongcheng District plans to start heating system testing on November 7, following historical practices, with ongoing system adjustments and safety checks [2] - Yanqing District's heating units are ready, with 15 heating units and 22 boiler rooms set to begin trial runs on November 6, barring any unusual weather [3] - Chaoyang District's heating units are also prepared, with a planned ignition trial run on November 7, in line with the winter heating mobilization meeting [4] - Changping District has completed preparations for heating and will initiate trial runs on November 7, ensuring a warm winter for residents [5] - Shunyi District has announced a trial run for heating on November 7, with all 54 registered heating units ready for immediate ignition [6]
北京多区7日点火试运行 供暖前你必须了解的12件事
Xin Jing Bao· 2025-11-06 06:00
Core Points - Beijing's heating season officially starts on November 15 and runs until March 15 of the following year, with provisions for early heating in extreme cold conditions [1][10] - Multiple districts in Beijing are set to begin trial heating operations on November 7, preparing for the official heating period [2][5][6][7][8] Group 1: Heating Preparation - The heating units in various districts, including Dongcheng, Yanqing, Haidian, and Chaoyang, have completed necessary preparations and will start trial heating on November 7 [2][3][4][5][6] - The trial heating period typically lasts for one week, allowing for system testing and troubleshooting before the official heating begins [1][4] Group 2: Heating Management and User Guidance - During the trial heating phase, there are no strict temperature requirements for heating units, and residents should not expect immediate heating to reach the standard [9][17] - Residents are advised to monitor their heating systems and report any issues to their heating service providers promptly [13][18] - The city has established a meteorological consultation mechanism to assess whether heating should be adjusted based on weather conditions [11] Group 3: Contact Information - A comprehensive list of contact numbers for heating management departments across various districts is provided for residents to report issues or seek assistance [15][16]
全省首个再生水热源供热项目试运行
Da Zhong Ri Bao· 2025-11-06 01:12
Core Insights - The Qingdao Lichun River Reclaimed Water Clean Energy Utilization Project (Phase I) has officially commenced trial operation, marking a significant breakthrough in the integration of wastewater resource utilization and clean energy development in Qingdao [1] - This project is the first in Shandong to utilize reclaimed water for clean energy heating, completed in just three months [1] Project Details - The project includes the installation of six 7-megawatt heat pump units and associated facilities [1] - It employs a "wastewater source heat pump" and "heat network return water heating" model to convert low-grade thermal energy from wastewater into high-grade thermal energy [1] - The project is expected to supply 544,000 gigajoules of heating annually and utilize 21.6 million cubic meters of reclaimed water [1] Environmental Impact - The initiative is projected to reduce carbon dioxide emissions by 30,000 tons per year [1] - It represents a new model for the circular utilization of water resources combined with green energy supply [1] Asset Utilization - The project makes efficient use of idle facilities and equipment from the "coal-to-gas" transition, promoting the preservation and appreciation of state-owned assets [1]
工大科雅:累计回购约151万股
Mei Ri Jing Ji Xin Wen· 2025-11-05 11:10
Group 1 - Company GDI Koya announced a share buyback of approximately 1.51 million shares, with a total transaction amount of about 28.97 million RMB, representing 1.25% of the company's total share capital [1] - The highest transaction price for the buyback was 20.2 RMB per share, while the lowest was 18.35 RMB per share, complying with the company's buyback plan and relevant regulations [1] - As of the report, the market capitalization of GDI Koya is 2.5 billion RMB [1] Group 2 - For the first half of 2025, GDI Koya's revenue composition is as follows: heating enterprises accounted for 53.64%, other clients 32.9%, construction engineering units 8.69%, government heating authorities 3.16%, and real estate developers 1.61% [1]
海淀专项检查供暖季特种设备,1100余台锅炉“持证上岗”
Xin Jing Bao· 2025-11-05 05:29
Core Points - The Haidian District Market Supervision Administration has initiated a special inspection for winter heating equipment to ensure safety during the heating season [1][2] - The inspection includes checks on boiler rooms in key locations such as heating companies, hotels, and schools, focusing on equipment inspection records and safety management [1] - A total of 51 units and 136 boilers have been inspected, with all 1,100 boilers in the district currently within the valid inspection period [1] Group 1 - The administration is implementing a "daily control, weekly inspection, monthly scheduling" mechanism for special equipment usage [1] - The "one device, one code" requirement is being promoted to enhance smart regulation in daily management [1] - Emergency response measures are being established, including a 24-hour emergency duty system and a "point-to-point" information reporting mechanism [1] Group 2 - The administration emphasizes the need for enterprises to take responsibility for the safe and stable operation of special equipment during the heating season [2]
再生水源热泵并网联供项目投产试运
Qi Lu Wan Bao· 2025-11-04 11:22
Core Insights - The Qingdao Li Village River Reclaimed Water Clean Energy Utilization Project (Phase I) has officially commenced trial operation, marking a significant breakthrough in the integration of wastewater resource utilization and clean energy development in Qingdao [1][2][6] Group 1: Project Overview - The project is expected to provide an annual heating capacity of 544,000 GJ, saving approximately 18 million cubic meters of natural gas and reducing carbon dioxide emissions by about 30,000 tons each year [1][6] - It is the first project in Shandong Province to connect reclaimed water heat sources to the main heating network, representing a new model for "water" and "heat" supply [1][6] Group 2: Technological and Operational Details - The project utilizes six 7 MW water source heat pump units, which can raise the water temperature from 10 degrees Celsius to 55 degrees Celsius, demonstrating advanced technology in energy extraction [2][3] - A total of 2,160 million cubic meters of reclaimed water is expected to be utilized during the heating season, showcasing the project's resource efficiency [3] Group 3: Economic and Environmental Benefits - The project enhances the clean energy ratio in the city and expands new scenarios for reclaimed water utilization, supporting the construction of a "waste-free city" [3][5] - It establishes a closed-loop resource recycling system, effectively utilizing idle assets and reducing operational costs, thus achieving dual goals of asset preservation and sustainable operation [4][6] Group 4: Strategic Importance - The project aligns with national energy development strategies and environmental requirements, contributing to the ecological civilization construction in Qingdao [5][6] - It serves as a model for similar projects, promoting the integration of reclaimed water and clean energy, and providing a replicable path for future initiatives [6][7]
北京供热进入倒计时 全面巡检保障安全运行
Yang Shi Xin Wen· 2025-11-04 06:12
Group 1 - The heating season is approaching, and various districts in Beijing have completed preparations for the heating system, including pressure testing and cold operation [1] - The Yong'an Thermal Power Plant in Changping District is ready for ignition, with all equipment operational and undergoing final inspections [1] - Yong'an Thermal Power Company serves an area of 21 million square meters, providing heating to over 110,000 residents and enterprises, and has completed pressure testing and cold operation for all users [3] Group 2 - Changping District has 103 registered heating enterprises, covering a total area of approximately 53.1 million square meters, with 17 key residential areas undergoing special rectification work [5] - All heating units in Beijing are prepared for heating, and unless there are abnormal weather conditions, they will start ignition testing as planned [7] - The heating units in the city have established a 24-hour service system, allowing residents to report issues through a unified service hotline or WeChat public service account [7]
北京多区11月7日供暖点火
中国能源报· 2025-11-03 11:13
Group 1 - The heating units in multiple districts of Beijing are set to start trial operations on November 7, 2023, ensuring residents are prepared for winter [1] - Chaoyang District has completed preparations for heating and will begin trial operations as planned, barring any unusual weather conditions [1] - Changping District has also confirmed that all heating units are ready and will initiate heating trials on November 7, following the city's historical practices [1] - Shunyi District has reported that all 54 registered heating units are fully prepared for the winter heating season and will start trial operations on November 7 [1]
火力全开“暖屋子”——辽宁多地供暖一线见闻
Xin Hua Wang· 2025-11-03 07:20
Core Points - The heating supply in Liaoning Province officially started on November 1, ensuring adequate warmth for residents during winter [1][2] - Advanced smart heating systems are being utilized to monitor and adjust heating parameters in real-time, enhancing efficiency and reducing heat loss [1][2] - Significant infrastructure improvements have been made in Shenyang, including the renovation of 300 heating boilers and 6,800 heat exchangers, as well as the replacement of 22 outdated coal-fired boilers [2] Group 1 - The heating supply companies in Liaoning are fully operational, with a focus on maintaining optimal heating temperatures and pressure [1] - The implementation of IoT balancing valves in certain communities aims to address heating imbalances for specific households [2] - A dedicated supervision hotline has been established in Shenyang to monitor the responsiveness of heating companies to public inquiries and complaints [3] Group 2 - The proactive measures taken by local authorities, such as the "visit residents and ask about heating" initiative, have created a comprehensive service model for heating management [3] - Residents have reported increased satisfaction with heating services due to improved communication and prompt responses from service personnel [3]
北京供暖最新消息!11月7日多区供暖点火试运行!
Bei Jing Ri Bao Ke Hu Duan· 2025-11-03 05:58
Core Points - The heating season in Beijing is scheduled from November 15 to March 15, with early heating activation possible during extreme cold weather [1] - Multiple districts, including Chaoyang and Changping, plan to initiate trial heating on November 7, ensuring readiness for the winter heating season [2][4] Group 1: Heating Preparation - Chaoyang District has a heating coverage area of 227 million square meters, accounting for about one-fourth of the city's total, and has completed significant upgrades to heating infrastructure [2] - Changping District has completed 57.3 kilometers of old heating pipeline renovations and 28.18 million square meters of heating system upgrades, exceeding municipal targets [4] - Shunyi District has 54 registered heating units ready for trial heating, ensuring comprehensive preparation for winter [6] Group 2: Monitoring and Response - During the trial period, departments will supervise heating units to ensure fuel supply, maintenance, and emergency response capabilities [2][4] - A 24-hour response mechanism will be established to address any heating system issues promptly [5] - Shunyi District has implemented a dual service system for heating units, ensuring timely responses to resident repair requests [8] Group 3: Community Engagement - Heating units will publicly disclose their names, repair locations, and 24-hour contact numbers to facilitate community oversight [3][5] - Ongoing "visit residents and ask about heating" initiatives will be conducted to address community concerns regarding heating [3][5]