公路建设

Search documents
波黑塞族共和国政府将为建设两段高速公路提供3.5亿欧元担保
Shang Wu Bu Wang Zhan· 2025-08-02 15:53
Group 1 - The government of the Republika Srpska in Bosnia and Herzegovina has approved guarantees totaling €1.19 billion for the construction of a 17-kilometer highway segment from Burchik to Bijeljina [2] - Additionally, the government has approved guarantees amounting to €2.33 billion for another highway project, which involves the construction of a 33-kilometer segment from Vukosavlje to Burchik [2] - The Ministry of Transport and Communications and the Ministry of Finance have been tasked with implementing the procedures for providing guarantees for the aforementioned credit debts [2]
河南加快建设交通强省 交通项目投资建设“双过半”
He Nan Ri Bao· 2025-08-01 23:15
Group 1: Transportation Infrastructure Development - The current summer transportation season sees Henan as a crucial transportation hub, effectively managing the flow of people and goods while maintaining strong investment in major transportation projects [2] - A provincial transportation work conference held on July 29 in Zhengzhou emphasized the acceleration of various engineering projects to enhance the construction of a strong transportation province, contributing to high-quality economic and social development in Henan [2] Group 2: Highway Expansion Goals - The completion of the last beam installation for the Huanghe Grand Bridge marks significant progress in the key project of the "13445 Project," which aims to achieve over 10,000 kilometers of highway by the end of 2025 [3] - As of mid-2023, Henan has completed 530.4 billion yuan in fixed asset investment in transportation, achieving 53% of the annual target of 1 trillion yuan, with 27 ongoing highway projects accounting for 62.2% of their annual investment plan [3] Group 3: Inland Waterway Development - The establishment of the Henan Jialu River Construction Company aims to revitalize the Jialu River for water transport, reflecting Henan's ambition to enhance its inland waterway capabilities [4][5] - By the end of June, Henan's inland waterway investment reached 100.2 billion yuan, with a port throughput of 35.14 million tons, marking a year-on-year increase of 70.33% [4] Group 4: Integration of Transportation and Tourism - The development of tourism highways, such as the ecological Funiu No. 1 tourism highway, has exceeded targets with 1,804 kilometers completed, enhancing connectivity between scenic spots and local economies [6] - The provincial transportation department aims to expand the total length of tourism highways to over 16,600 kilometers, promoting new economic models that integrate services and tourism [6]
西藏交通基础设施建设日新月异
Zhong Guo Zheng Quan Bao· 2025-07-31 21:02
Core Viewpoint - The rapid development of transportation infrastructure in Tibet since the 18th National Congress of the Communist Party of China has significantly contributed to economic and social development, benefiting various ethnic groups [1] Investment and Infrastructure Development - From 2012 to 2024, Tibet has completed a total fixed asset investment in transportation of 401.925 billion yuan [1] - The total length of roads in Tibet has increased from 65,200 kilometers in 2012 to 124,900 kilometers by the end of 2024 [1] Transportation Network - A comprehensive and multi-dimensional transportation network centered around Lhasa has been fully established, radiating to Shigatse, Shannan, Nyingchi, and Nagqu [1] - The development of this transportation network plays a crucial role in supporting economic and social development in the region [1]
四川成渝:联合体中标G5京昆高速公路成都至雅安段扩容工程项目
news flash· 2025-07-28 09:01
Core Viewpoint - Sichuan Chengyu has won the bid for the G5 Jingkun Expressway expansion project from Chengdu to Ya'an, indicating a significant investment opportunity in infrastructure development [1] Group 1: Project Details - The project route spans a total length of 159.115 kilometers [1] - The estimated total investment for the project is approximately RMB 28.548 billion [1] - The project's capital contribution is 20.20% of the total investment, amounting to about RMB 5.767 billion [1] Group 2: Company Involvement - Sichuan Chengyu's investment in the project is approximately RMB 4.902 billion, representing an 85% ownership stake [1] - The project has a toll collection period of 29 years and 305 days [1]
48亿省级重点交通工程公示 路桥特许模式再行“山西实践”
Xin Lang Cai Jing· 2025-07-26 10:47
Core Insights - The construction of the new section of National Highway 307 in Shanxi, with an estimated total investment of over 4.8 billion yuan, marks a significant step towards substantial construction and is a beneficial attempt at the BOT (Build-Operate-Transfer) model in Shanxi [1] - Shanxi Road and Bridge has won 17 concession projects totaling 1,296 kilometers and an investment of 99.2 billion yuan, demonstrating the importance of the concession model for the company [2] - The company reported a revenue of 785 million yuan from highway concession projects in the first half of 2023, a year-on-year increase of 2.31%, accounting for 99.32% of its total revenue [2] Investment and Financing - The new highway project will have a construction period of 36 months, with 20% of the total investment funded by the government and the concessionaire, while the remaining funds will be raised through project company financing [1] - The BOT model is the most commonly used method in Shanxi Road and Bridge's concession operations, providing a diversified financing model that ensures the smooth progress of projects [1] Recent Developments - In the second half of 2024, Shanxi Road and Bridge won multiple concession projects, including the Dazhong Ring Expressway and National Highways 109 and 208, with a total bid amount of approximately 12.9 billion yuan [4] - The first highway concession project in Shanxi, the Fenzhi to Wutai Expressway, has been signed, with a total length of 71.246 kilometers and an investment of 10.498 billion yuan [5] - The company currently manages and operates approximately 3,992 kilometers of various grades of highways, establishing itself as a key player in transportation project investment and construction in Shanxi [5]
*ST交投:拟与关联方都香公司签订高速公路施工总承包合同
Mei Ri Jing Ji Xin Wen· 2025-07-26 03:59
Group 1 - The company announced its participation in a consortium to bid for the "National Highway Network G7611 Duyun to Shangri-La Highway Ninglang to Shangri-La Section and Hongning Branch Project" in collaboration with Yunnan Provincial Transportation Investment Construction Group and other entities [1] - The company will invest 2 million yuan in the project and hold a 0.4% equity stake in the newly established project company, Yunnan Duxiang Highway Co., Ltd. [1] - The company plans to sign a construction general contract for the project, with a contract amount of 977.627 million yuan, which involves landscape greening, environmental protection facilities, and related construction works [2] Group 2 - The construction contract constitutes a related party transaction, as the project company is a subsidiary of the company's controlling shareholder, Yunnan Transportation Investment [2] - The related party transaction amount is 977.627 million yuan, and it has been submitted for approval by the company's board and supervisory committee, with certain directors abstaining from voting [2] - This related party transaction does not qualify as a major asset restructuring under relevant regulations and does not require additional approvals [2]
*ST交投: 第八届董事会第十五次会议决议公告
Zheng Quan Zhi Xing· 2025-07-25 16:37
Group 1 - The company held its 15th meeting of the 8th Board of Directors on July 25, 2025, with all 9 directors present, complying with relevant laws and regulations [1][2] - The Board approved a construction contract with Yunnan Duxiang Expressway Co., Ltd. for the G7611 Duan to Shangri-La Highway project, with a contract amount of 977.627 million yuan [1] - The independent directors reviewed the related party transaction and provided independent opinions, ensuring transparency in the decision-making process [1] Group 2 - The voting results for the contract approval were 5 votes in favor, 0 against, and 4 abstentions, with the proposal needing to be submitted to the shareholders' meeting for further approval [2] - The company scheduled a meeting for August 11, 2025, at 14:30 for the capital contributors and the third temporary shareholders' meeting of 2025 [2] - The voting results for the shareholders' meeting were unanimous approval with 9 votes in favor, 0 against, and 0 abstentions [2]
*ST交投: 第八届监事会第十三次会议决议公告
Zheng Quan Zhi Xing· 2025-07-25 16:37
Group 1 - The company held its 13th meeting of the 8th Supervisory Board on July 25, 2025, with all three supervisors present, complying with relevant laws and regulations [1][2] - The Supervisory Board approved a proposal for a related party transaction involving a construction contract with Yunnan Duxiang Expressway Co., Ltd., valued at 977.63 million yuan, aimed at increasing the company's business reserves and revenue [1][2] - The transaction was deemed to align with the company's actual situation and not harm the interests of the company or its shareholders, with necessary decision-making procedures followed [1][2] Group 2 - The voting results for the proposal were 2 votes in favor, 0 against, and 0 abstentions, with 1 supervisor recusing themselves [2] - The proposal will be submitted for approval at the company's shareholders' meeting [2] - The decision document was signed by the attending supervisors and stamped with the Supervisory Board's seal [2]
武汉都市圈环线高速孝感北段关键方案通过评审 钢箱梁施工与枢纽保通有了“技术指南”
Zhong Guo Fa Zhan Wang· 2025-07-23 08:40
评审会上,项目施工单位聚焦两大核心方案展开详细汇报:钢箱梁安装环节,从构件运输、吊装定位到焊接工艺,全流程技术要点逐一拆解,精准呈现施工 中的精度控制与安全保障措施;枢纽互通保通专项方案则围绕施工期间的交通导改、车辆分流、临时设施搭建等内容,系统阐述如何在保障既有道路通行的 前提下推进工程建设。 来自桥梁工程、交通组织等领域的专家组成员认真听取汇报,结合项目实际地形地貌与施工难点,从技术可行性、工艺规范性、安全冗余度等多个维度深入 研讨。经过两天的细致评审,专家组一致认为,两套方案数据详实、逻辑清晰,施工工艺成熟可行,能够满足项目建设需求。同时,专家们还针对钢箱梁焊 接质量把控、复杂工况下的交通疏导细节等提出优化建议,为方案"再升级"提供专业支撑。 式汉都市圈环线高速 中国发展网讯武汉都市圈环线高速公路建设再传捷报。7月12日至13日,孝感北段一期土建工程钢箱梁安装及枢纽互通保通方案顺利通过专家评审,这一关 键节点的突破,为项目后续高效施工、安全推进筑牢技术根基,也让武汉都市圈环线高速的"孝感速度"再添加速度。 下一步,项目团队将根据专家意见细化完善方案,迅速启动钢箱梁安装及枢纽互通施工准备工作。随着各项技术 ...
利咸高速:一条会“呼吸”的路 铺就生态与发展的和谐乐章
Zhong Guo Fa Zhan Wang· 2025-07-23 07:48
Core Viewpoint - The construction of the Lixian Expressway by Hubei Communications Investment Group emphasizes ecological priority, showcasing innovative techniques that harmonize engineering with nature [2] Group 1: Environmental Initiatives - The expressway features a remarkable 98% coverage rate of vegetation along its slopes, achieved through the planting of 63,042.5 square meters of grass and shrubs, equivalent to five standard basketball courts [3] - An innovative ecological "green base" of nearly 800 cubic meters was created using special bags filled with soil and grass seeds, effectively addressing the challenges of planting on steep terrain while preventing soil erosion [4] Group 2: Technological Innovations - Advanced dust suppression technologies, including a mist spraying system and mobile dust suppression vehicles, are employed to minimize construction dust at the source [5] - An intelligent environmental monitoring system operates 24/7, tracking noise and dust levels, with real-time data uploads and automatic alerts when thresholds are approached, ensuring compliance with national standards [5] Group 3: Sustainable Practices - The project team conducts thorough site assessments to determine the best plant species for local conditions, ensuring sustainable growth on steep slopes [7] - Regular ecological protection training is provided to all construction personnel, fostering a culture of environmental stewardship among workers [7]