公路建设

Search documents
“为达卡带来互联互通的新时代”
人民网-国际频道 原创稿· 2025-09-06 07:03
Core Points - The Dhaka-Ashulia Elevated Expressway project is crucial for improving transportation in Bangladesh, particularly for the textile industry, which accounts for 38% of the country's industrial output [1][2] - The project is expected to enhance connectivity for over 40 million people in the Dhaka area and contribute an estimated 0.21% to Bangladesh's GDP growth [1][2] - The expressway will connect the capital's central business district with industrial and trade zones, facilitating trade with neighboring countries and China [2][4] Project Details - The project includes a 24-kilometer four-lane elevated expressway and upgrades to existing roads, with a design speed of 80 km/h [2] - As of September 2025, significant progress has been made, including the completion of over 4,100 pile foundations and 1,100 cap/beam structures [2][4] - The project employs advanced construction techniques from Chinese companies, ensuring efficient progress despite challenging geological conditions [4][5] Workforce and Local Impact - Approximately 4,000 local workers are involved in the project, with efforts to enhance their skills through hands-on training [4][5] - The project aligns with Bangladesh's "Golden Bengal" vision and the Belt and Road Initiative, promoting regional connectivity and development [5]
调研速递|新疆交建接受广发证券等多家机构调研 透露上半年业绩增长亮点与项目进展
Xin Lang Cai Jing· 2025-09-05 11:29
Core Viewpoint - Xinjiang Transportation Construction Group Co., Ltd. (stock code: 002941) held a specific investor survey and site visit on September 4, 2025, focusing on the S228 line project, highlighting management improvements and project progress [1] Group 1: Investor Relations Activity - The investor relations activity included a site visit and survey by institutions such as GF Securities and Guotai Junan, along with media representatives [1] - Key executives present included Chairman Wang Tong and General Manager Wang Yongxue, among others [1] Group 2: Performance Highlights - The company reported revenue and profit growth due to optimized management systems and improved project management [1] - Non-recurring gains totaled 133 million yuan, primarily from the disposal of a 22.08% stake in a non-current asset [1] - The company is enhancing project management through smart control technologies and information management tools [1] Group 3: S228 Line Project Progress - The S228 line project has an estimated investment of 2.664 billion yuan, spanning 103.22 kilometers with a design speed of 100 km/h [1] - The project aims for completion by the end of 2026, with 50% of the total engineering volume expected to be completed this year [1] Group 4: Shareholder Rights and Returns - The company is improving governance and disclosure practices to ensure accurate and timely information for shareholders [1] - There are plans to enhance participation of minority shareholders and establish effective communication channels [1] - For the first half of 2025, the company plans not to distribute cash dividends or issue bonus shares, focusing on retaining funds for core business and R&D [1] Group 5: Research and Development Focus - The company is exploring the use of recycled materials and developing new eco-friendly materials [1] - Innovations in construction processes are being pursued to improve efficiency and reduce costs [1] - The company is advancing digital transformation and safety monitoring systems to address geological risks [1]
四川路桥: 四川路桥关于下属施工企业参股投资南江至三台(中江)高速公路项目的关联交易进展公告
Zheng Quan Zhi Xing· 2025-09-04 08:16
Core Viewpoint - Sichuan Road and Bridge Construction Group Co., Ltd. is involved in a joint venture for the investment in the Nanjing to Santai (Zhongjiang) Expressway project, with a total investment of 48.723 billion yuan, and the company holds a 3.3% stake in the project [2][3]. Group 1 - The project has a total investment of 48.723 billion yuan, with a self-raised capital ratio of 20.20%, amounting to approximately 9.842 billion yuan [2]. - The company’s shareholding structure includes Sichuan Road and Bridge Group (1.7%), Sichuan Transportation Construction Group (0.8%), and Sichuan Lu Hang Construction Engineering Co., Ltd. (0.8%), requiring a total capital contribution of about 324.8 million yuan [2]. - The joint venture has received a bid notification confirming it as the winning bidder for the project, which has a capital contribution requirement of 20.20% of the total investment and a tolling period of 29 years and 319 days [3].
浙江交通科技股份有限公司关于项目中标的公告
Shang Hai Zheng Quan Bao· 2025-09-02 20:31
Core Viewpoint - Zhejiang Transportation Technology Co., Ltd. has recently announced winning bids for multiple highway construction projects, which are expected to positively impact the company's performance and strengthen its market position in the Yangtze River Delta region [8][17]. Group 1: Project Overview - The company has received notification of winning bids for the Yi Long Qing Expressway and the G92 Hangzhou Bay Ring Expressway, with specific segments awarded to its subsidiaries [1][4]. - For the Yi Long Qing Expressway, the company won three segments with bid amounts of approximately RMB 1.43 billion, RMB 1.87 billion, and RMB 1.46 billion for segments TJ02, TJ04, and TJ07 respectively [3][4]. - The G92 Hangzhou Bay Ring Expressway project includes two segments with bid amounts of approximately RMB 3.92 billion for segment TJ01 and RMB 1.43 billion for segment TJ04 [6][7]. Group 2: Project Details - The project durations are set at 1,462 calendar days for segment TJ02 and 1,158 calendar days for segments TJ04 and TJ07 of the Yi Long Qing Expressway [2]. - The G92 Hangzhou Bay Ring Expressway has a project duration of 1,672 calendar days for segment TJ01 and 1,491 calendar days for segment TJ04 [5]. - Quality requirements for the projects include a minimum score of 95 for acceptance and a quality index of RQI≥95.5 for road surface quality [6][15]. Group 3: Impact on the Company - Winning these projects aligns with the company's strategic business layout and is expected to enhance its competitiveness and market share in the Yangtze River Delta region [8][17]. - Successful implementation of these projects is anticipated to have a positive effect on the company's financial performance [8][17].
浙江交科(002061.SZ)下属公司拟中标相关高速公路项目
智通财经网· 2025-09-02 04:08
Core Viewpoint - Zhejiang Jiaokao (002061.SZ) announced that its subsidiaries have been selected as the first candidates for several segments of the G2531 Hangzhou to Shangrao Expressway project [1] Group 1: Project Involvement - The subsidiaries involved are Zhejiang Jiaogong Group Co., Ltd., Zhejiang Jiaogong Jinzhu Transportation Construction Co., Ltd., Zhejiang Jiaogong Road and Bridge Construction Co., Ltd., and Zhejiang Jiaogong Hongtu Transportation Construction Co., Ltd. [1] - The project is the G2531 Hangzhou to Shangrao Expressway (Hangzhou section) [1] Group 2: Bid Details - The segments for which the subsidiaries are the first candidates include TJ03, TJ05, TJ06, and TJ07 [1] - Proposed bid amounts are as follows: - Segment TJ03: 1.965 billion yuan - Segment TJ05: 1.718 billion yuan - Segment TJ06: 1.747 billion yuan - Segment TJ07: 1.748 billion yuan [1]
浙江交科(002061.SZ):下属公司中标项目
Ge Long Hui A P P· 2025-09-02 04:06
Core Viewpoint - Zhejiang Jiaokao (002061.SZ) announced that its subsidiaries have been awarded the first candidate for several project segments, indicating a positive development in their project bidding activities [1] Group 1: Project Awards - The company’s subsidiaries, Zhejiang Jiaogong Group Co., Ltd., Zhejiang Jiaogong Road and Bridge Construction Co., Ltd., and Zhejiang Jiaogong Jinzhu Transportation Construction Co., Ltd., have been selected as the first candidates for the Yiwu to Longquan section of the Yilongqing Expressway and the Ningbo Qijia Mountain to Zhoushan Jintang section of the G92 Hangzhou Bay Ring Expressway [1] - The company has received notification letters regarding the successful bids for these project segments [1]
“豆腐里雕花” 久马高速查针梁子隧道双幅贯通
Si Chuan Ri Bao· 2025-09-02 00:04
Group 1 - The completion of the Chazhenliangzi Tunnel marks a significant advancement in the construction technology of highland soft rock deformation tunnels, transitioning from the exploratory phase to a mature phase, providing a replicable technical solution for similar tunnel constructions [1][2] - The tunnel, located in Aba Prefecture, spans 3100 meters with an average elevation of 3650 meters, and is recognized as a rare highland soft rock deformation tunnel in the country, presenting significant construction challenges [2] - The project team implemented innovative construction methods such as rapid excavation, support, anchoring, and sealing, achieving a "zero invasion limit" requirement with no collapse or deformation post-construction [2] Group 2 - The Jiuma Expressway is a core segment of the national expressway network, connecting the G6 Beijing-Lhasa Expressway and facilitating transportation between northwest and southwest regions of the country [3] - Upon completion in 2027, the travel time from Chengdu to Jiuzhi County in Qinghai Province will be reduced from 8.5 hours to 5.5 hours, enhancing the integration of tourism and transportation in the "Great Jiuzhai" area [3] - The expressway plays a crucial role in improving the national and regional road network structure, promoting Sichuan's integration into the Belt and Road Initiative, and fostering regional economic development and ethnic unity [3]
赋能宁镇一体化发展 !312国道镇江段快速化改造主线试通车,双向六车道无红绿灯
Yang Zi Wan Bao Wang· 2025-09-01 14:20
Core Points - The 312 National Road Zhenjiang section has officially opened for trial operation, marking a significant milestone in the city's transportation modernization during the 14th Five-Year Plan period [1][3] - This project is a key component of Zhenjiang's rapid road network, connecting Nanjing and Zhenjiang's main urban areas, enhancing regional integration and economic development [3][5] Group 1: Project Overview - The project spans approximately 35.2 kilometers, with 13.7 kilometers in the urban area and 21.5 kilometers in the Jurong section [3] - It aims to create a new pattern of industrial innovation by linking key areas such as Jurong Baohua, Xiashe, and Zhenjiang High-tech Zone [5] Group 2: Infrastructure Improvements - The upgraded road features a dual six-lane design, with a maximum speed of 100 km/h, eliminating traffic lights and improving traffic efficiency [7] - The project includes advanced technology integration, such as "smart road" features and enhanced landscaping, contributing to the city's aesthetic appeal [7] Group 3: Construction Efforts - The construction faced challenges of simultaneous operation and traffic management, requiring meticulous planning and coordination among various stakeholders [7] - Significant resources were allocated, including personnel, materials, and machinery, to ensure timely completion of the project [7]
加力突破 提档进阶|这一项目中标,助力“电池之都”通行时间锐减50%
Qi Lu Wan Bao· 2025-09-01 10:25
Core Viewpoint - The successful bid by Hunan Provincial Highway Design Co., Ltd. for three transportation infrastructure projects in Linwu County is expected to significantly enhance the region's logistics and support the development of the lithium mining industry, crucial for the "Battery City" initiative [1] Group 1: Project Details - The projects include the S568 Linwu Zimu to Majiakou Highway (Phase I), Linwu County Shanmuxi to Huatangpu Highway (Phase I), and Linwu County Shanmuxi to Huatangpu Highway (Phase II) [1] - These projects are part of the "14th Five-Year" plan for Linwu County's highway network, which aims to improve connectivity through a "three vertical and four horizontal" layout [1] Group 2: Economic Impact - The completion of these projects is projected to reduce transportation time by at least 50%, significantly improving regional traffic conditions [1] - The infrastructure will serve as a major transportation route for lithium ore, enhancing the development of the lithium industry in Linwu County and supporting Hunan's new industrialization strategy [1] Group 3: Company Performance - Hunan Provincial Highway Design Co., Ltd. has been recognized for its engineering design capabilities, having received an "AA" credit rating for eight consecutive years in Hunan Province's annual highway design enterprise evaluation [1] - The successful bid reflects the company's commitment to local development and its role in contributing to public welfare [1]
龙建股份:中标3.1亿元公路项目
Xin Lang Cai Jing· 2025-09-01 09:14
龙建股份公告,公司近日收到哈尔滨市双城区农村公路建设指挥部和黑龙江省信诚工程招标有限公司发 来的中标通知书。公司被确定为哈尔滨市双城区2024年农村公路提质改造工程及农村公路危桥改造工程 施工招标A1标段的中标人。中标价为3.1亿元。项目地点位于黑龙江省哈尔滨市双城区,计划工期自合 同签订之日起至2025年11月30日。工程包括41条路段,全长315.37公里,采用三、四级公路标准建设, 施工内容涵盖路基、路面、桥梁、涵洞及交通安全设施等。 ...