Workflow
怀兴城际
icon
Search documents
“轨道上的京津冀”越织越密
Xin Lang Cai Jing· 2026-01-03 22:19
Core Insights - The China Railway Beijing Bureau Group Co., Ltd. has focused on serving national strategies and regional economic development since the start of the 14th Five-Year Plan, achieving significant results in expanding the railway network and improving transportation quality [1][2]. Group 1: Railway Network Expansion - During the 14th Five-Year Plan, the railway network layout has been continuously optimized, with an addition of 710 kilometers of operational railway, bringing the total operational mileage to 10,394.9 kilometers by the end of the plan, including 2,795.6 kilometers of high-speed rail and an electrification rate of 85.4% [1]. - Key high-speed rail projects, such as the Xiong'an-Shijiazhuang and Tianjin-Weifang lines, are under construction, further enhancing the regional high-speed rail backbone [1]. Group 2: Intercity Railway Development - The intercity railway network in the Beijing-Tianjin-Hebei region has been continuously optimized, with several lines like the Jing-Tang and Jing-Bin (Baodi to Beichen) now operational, creating a "four axes and eight radiations" railway layout [2]. - The region's major cities now have full coverage of high-speed and intercity rail services, establishing a 0.5-1 hour transportation circle between Beijing, Xiong'an, and Tianjin [2]. Group 3: Passenger Services Enhancement - By the end of the 14th Five-Year Plan, the scheduled passenger trains operated by the bureau reached 1,035 pairs, a 22.7% increase from the beginning of the period, with high-speed trains seeing a 68.8% increase [3]. - The coverage of train services in the Beijing-Tianjin-Hebei region now extends to 32 provincial-level administrative regions and 266 cities, significantly improving connectivity within the urban agglomeration [3].
“轨道上的京津冀”主骨架基本成型
Core Viewpoint - The Beijing Railway Bureau is actively integrating into the coordinated development strategy of the Beijing-Tianjin-Hebei region during the 14th Five-Year Plan period by expanding high-speed rail and improving station services, with a focus on enhancing connectivity and operational efficiency in the region [1][4]. Group 1: Railway Infrastructure Development - The operational railway mileage in the Beijing-Tianjin-Hebei region is 10,386.92 kilometers, including 2,787.64 kilometers of high-speed rail, establishing a foundational framework for "Railway on the Beijing-Tianjin-Hebei" [1][5]. - Ongoing projects include the Xiongxin, Xiongshang, and Tianwei high-speed rail lines, which will further enhance accessibility in the region upon completion [1][4]. - The Beijing-Tangshan intercity railway segment from the urban sub-center to Yanjiao is expected to commence operations by the end of the year, adding approximately 8 kilometers to the operational mileage [5]. Group 2: Service Enhancements at Beijing South Station - During the summer transportation period, the Beijing South Station has implemented a permanent opening of four rapid boarding halls, significantly reducing boarding time by 10 minutes for passengers with less than 20 minutes until departure [3][4]. - Since the start of the summer transportation season, over 3 million passengers have been sent via the Beijing South Station for the Beijing-Tianjin intercity service [3]. Group 3: Future Projections and Growth - By June 2025, the total railway operating mileage managed by the Beijing Railway Bureau is projected to reach 10,386.92 kilometers, reflecting a growth of 702.55 kilometers or 7.3% compared to the end of the 13th Five-Year Plan [5]. - The high-speed railway segment is expected to grow by 499.02 kilometers or 21.8%, reaching a total of 2,787.64 kilometers by the same date [5].