京唐城际
Search documents
协同发展十二载:京津冀交通跑出加速度
Bei Jing Shang Bao· 2026-02-26 15:29
2026年是京津冀协同发展战略实施12周年,作为先行领域,交通一体化版图持续上新。2月26日,北京 商报记者从市交通委获悉,截至2025年底,京津冀三省市营运性铁路总里程突破1.1万公里,较2014年 增长近四成;高速公路总里程达1.1万公里,增长41.7%。京哈高铁、京唐城际、津兴城际等一批重大铁 路项目相继通车,京津冀区域主要城市之间基本实现1.5小时至2小时通达,高铁已全部覆盖京津冀所有 地级市。北京通州站投运,北京市"八站两场"现代化枢纽格局蔚然成型,区域交通组织功能实现质的飞 跃。 "轨道上的京津冀"主骨架全面成形,跨省通勤从"双城生活"迈入"同城体验",协同发展十二年,交通上 的京津冀跑出了加速度。随着"十五五"开局之年的到来,这张交通蓝图正持续上新。 "轨道上的京津冀"里程翻倍 "现在从北京通州站能直达唐山站,再也不用为换乘操心了。"在通州工作、家住唐山的李先生,是京津 冀铁路网加密的受益者。2025年12月30日,随着北京通州站开通运营,京唐城际铁路全线贯通,首 都"八站两场"综合交通枢纽格局成形,北京通州至唐山最快仅需55分钟,像他一样的通勤族,回家路走 得更快、更从容。这也正印证着跨省通勤 ...
“轨道上的京津冀”越织越密
Xin Lang Cai Jing· 2026-01-03 22:19
Core Insights - The China Railway Beijing Bureau Group Co., Ltd. has focused on serving national strategies and regional economic development since the start of the 14th Five-Year Plan, achieving significant results in expanding the railway network and improving transportation quality [1][2]. Group 1: Railway Network Expansion - During the 14th Five-Year Plan, the railway network layout has been continuously optimized, with an addition of 710 kilometers of operational railway, bringing the total operational mileage to 10,394.9 kilometers by the end of the plan, including 2,795.6 kilometers of high-speed rail and an electrification rate of 85.4% [1]. - Key high-speed rail projects, such as the Xiong'an-Shijiazhuang and Tianjin-Weifang lines, are under construction, further enhancing the regional high-speed rail backbone [1]. Group 2: Intercity Railway Development - The intercity railway network in the Beijing-Tianjin-Hebei region has been continuously optimized, with several lines like the Jing-Tang and Jing-Bin (Baodi to Beichen) now operational, creating a "four axes and eight radiations" railway layout [2]. - The region's major cities now have full coverage of high-speed and intercity rail services, establishing a 0.5-1 hour transportation circle between Beijing, Xiong'an, and Tianjin [2]. Group 3: Passenger Services Enhancement - By the end of the 14th Five-Year Plan, the scheduled passenger trains operated by the bureau reached 1,035 pairs, a 22.7% increase from the beginning of the period, with high-speed trains seeing a 68.8% increase [3]. - The coverage of train services in the Beijing-Tianjin-Hebei region now extends to 32 provincial-level administrative regions and 266 cities, significantly improving connectivity within the urban agglomeration [3].
“轨道上的京津冀”主骨架基本成型
Bei Jing Ri Bao Ke Hu Duan· 2025-08-29 05:36
Core Viewpoint - The Beijing Railway Bureau is actively integrating into the coordinated development strategy of the Beijing-Tianjin-Hebei region during the 14th Five-Year Plan period by expanding high-speed rail and improving station services, with a focus on enhancing connectivity and operational efficiency in the region [1][4]. Group 1: Railway Infrastructure Development - The operational railway mileage in the Beijing-Tianjin-Hebei region is 10,386.92 kilometers, including 2,787.64 kilometers of high-speed rail, establishing a foundational framework for "Railway on the Beijing-Tianjin-Hebei" [1][5]. - Ongoing projects include the Xiongxin, Xiongshang, and Tianwei high-speed rail lines, which will further enhance accessibility in the region upon completion [1][4]. - The Beijing-Tangshan intercity railway segment from the urban sub-center to Yanjiao is expected to commence operations by the end of the year, adding approximately 8 kilometers to the operational mileage [5]. Group 2: Service Enhancements at Beijing South Station - During the summer transportation period, the Beijing South Station has implemented a permanent opening of four rapid boarding halls, significantly reducing boarding time by 10 minutes for passengers with less than 20 minutes until departure [3][4]. - Since the start of the summer transportation season, over 3 million passengers have been sent via the Beijing South Station for the Beijing-Tianjin intercity service [3]. Group 3: Future Projections and Growth - By June 2025, the total railway operating mileage managed by the Beijing Railway Bureau is projected to reach 10,386.92 kilometers, reflecting a growth of 702.55 kilometers or 7.3% compared to the end of the 13th Five-Year Plan [5]. - The high-speed railway segment is expected to grow by 499.02 kilometers or 21.8%, reaching a total of 2,787.64 kilometers by the same date [5].