Workflow
抽水泵
icon
Search documents
市应安委办召开全市防汛抗旱会商调度会,部署防汛抗旱应对工作
Chang Sha Wan Bao· 2025-08-29 03:21
Core Points - The meeting organized by Changsha's Emergency and Safety Production Committee focused on deploying flood and drought response measures due to severe drought conditions [1][2] - As of August 28, 2023, Changsha recorded a cumulative rainfall of 921.7 mm, which is 24.5% less than the historical average for the same period [2] - The river inflow has decreased by 30% to 80% compared to historical averages since August 1, indicating a critical drought situation [2] Summary by Categories Drought Response Measures - The meeting emphasized the need to ensure water safety for both living and production needs during moderate droughts, and basic living water security during severe droughts [2] - It was highlighted that monitoring, early warning, and scientific support for drought decision-making are crucial [2] - The city has increased water storage by 140 million cubic meters in reservoirs since June, and the river channel capacity has increased by approximately 8.3 million cubic meters [2] Resources and Preparedness - Currently, there are 981 drought relief wells and a stockpile of 1,004 water pumps, 249 water trucks, 110 water storage tanks, 120,155 meters of water hoses, and 438 generator sets available for drought relief [2] - Since June, 198 rounds of artificial rainfall operations have been conducted to alleviate local drought conditions [3] - All personnel, equipment, and materials for weather modification operations are in place, with continuous monitoring of cloud development [3]
党旗在基层一线高高飘扬丨先到后撤,他们在抗洪中赓续荣光
Xin Hua Wang· 2025-07-18 09:07
Core Viewpoint - The article highlights the dedication and effectiveness of the national emergency rescue team during the flood relief efforts in Rongjiang County, showcasing their rapid response, teamwork, and commitment to public safety [1][3][6]. Group 1: Rescue Operations - On June 24, a sudden flood hit Rongjiang County, prompting a rapid deployment of 60 rescue personnel who faced significant challenges such as disrupted communication and treacherous conditions [3]. - The rescue team successfully evacuated 103 trapped individuals, including a pregnant woman, demonstrating their quick response and coordination with local community members [3][5]. - The team completed drainage tasks at 11 operational points, notably reducing water levels in an underground shopping mall by 5.6 meters and draining 205,000 cubic meters of water within 24 hours [5]. Group 2: Continued Commitment - After the initial rescue operations, the team voluntarily stayed on to assist in post-disaster recovery, monitoring toxic gas levels in 54 underground spaces [6]. - The rescue team received heartfelt appreciation from the local community, reflecting their strong sense of responsibility and commitment to their mission [6]. - The team emphasizes discipline, practical skills, and readiness, with a commitment to remain on standby 24/7 to ensure public safety in future emergencies [6][7].
国网庆阳供电公司:未雨绸缪保供电 严检细查护安澜
Core Viewpoint - The company is proactively conducting inspections and preparations for flood prevention to ensure the safety and stability of the power grid during the upcoming flood season [3][5]. Group 1: Flood Prevention Measures - The company has initiated a comprehensive inspection of flood prevention emergency materials and equipment across all substations, aiming for "zero hazards, zero blind spots" [3]. - Inspections include checking the quality and quantity of flood prevention materials such as sandbags, pumps, and waterproof barriers, ensuring they meet specifications and are in good condition [3][5]. - A "carpet-style" investigation is being conducted on key equipment, including drainage systems and cable trench waterproofing, with immediate rectification of identified issues [3][4]. Group 2: Emergency Response Enhancements - The company is enhancing its emergency response capabilities by refining flood emergency plans and conducting practical drills to improve staff proficiency in handling equipment failures and rapid water removal during extreme weather [4]. - A 24-hour duty and leadership rotation system is in place, with real-time collaboration with meteorological departments to monitor weather alerts [4]. Group 3: Progress and Future Plans - As of now, the company has completed inspections of 32 substations and updated over 200 flood prevention materials [5]. - The company plans to maintain a high-pressure stance on flood prevention, increasing the frequency of equipment inspections and dynamically optimizing material reserves to ensure readiness for potential risks [5].