沪渝蓉高铁武宜段

Search documents
大环线呼之欲出,“金三角”跑起来了
Mei Ri Jing Ji Xin Wen· 2025-05-15 23:43
Core Viewpoint - The Wuhan to Yichang section of the Huhangrong High-Speed Railway has commenced joint debugging and testing, aiming for operational readiness within the year, significantly reducing travel time between Wuhan and Yichang from 2 hours to approximately 1 hour [1][3]. Group 1: Project Overview - The Huhangrong High-Speed Railway Wuhan to Yichang section spans 313 kilometers with a design speed of 350 km/h [1]. - This section connects with other high-speed rail lines, enhancing regional connectivity and facilitating a travel time reduction to around 4 hours between Wuhan and Chongqing [3]. Group 2: Economic Impact - The completion of the Huhangrong High-Speed Railway will contribute to the "Golden Triangle" of Han, Xiang, and Yi cities, which is crucial for economic growth in Hubei province [5]. - As of 2024, Wuhan's GDP has reached 2.11 trillion yuan, with both Yichang and Xiangyang surpassing 600 billion yuan, indicating significant economic development in the region [5]. Group 3: Regional Development Strategy - The Huhangrong High-Speed Railway is part of a broader strategy to enhance regional coordination and economic integration, with the "Golden Triangle" identified as a key area for collaborative innovation [5][6]. - The establishment of a one-hour commuting circle is expected to foster urban clusters and metropolitan areas, enhancing the efficiency of human, logistics, and information flows [6].
1小时到武汉,沪渝蓉高铁武宜段开启动态验收
Chang Jiang Ri Bao· 2025-05-15 07:43
Core Points - The launch of the first testing train 55103 marks the start of comprehensive testing for the Wuhan to Yichang section of the Shanghai-Chongqing-Rongcheng High-Speed Railway (referred to as "Wuhan-Yichang High-Speed Railway") [1] - The Wuhan-Yichang High-Speed Railway spans 313 kilometers with a design speed of 350 km/h, featuring 88 new bridges and 25 tunnels, with bridges and tunnels accounting for 85% of the total length [3] - The project began construction in September 2021 and is expected to complete track laying by January 2025, followed by a static acceptance phase in April 2025 [3] Group 1 - The comprehensive testing phase includes dynamic acceptance, covering joint debugging, dynamic testing, and operational trials [5] - The China Railway Wuhan Group and construction units will conduct daily adjustments on the "four electrical" systems, ensuring smooth testing [5] - The Wuhan-Yichang High-Speed Railway will significantly reduce travel time from 2 hours to approximately 1 hour, enhancing connectivity for cities along the route [7] Group 2 - After the dynamic acceptance is completed, the world's fastest high-speed train CR450 will conduct operational assessment tests on this line [7] - The railway will connect with the ongoing Yichang to Xingshan high-speed railway and the Zheng-Chongqing high-speed railway, further reducing travel time from Wuhan to Chongqing to around 4 hours [7]