Workflow
京津冀交通协同发展
icon
Search documents
京雄快线开通后雄安可速达大兴机场!京雄快线今年具备与大兴机场线贯通运营调试条件
Xin Lang Cai Jing· 2026-02-08 14:25
(来源:北京新闻广播) 【#京雄快线开通后雄安可速达大兴机场#!京雄快线今年具备与大兴机场线贯通运营调试条件】"瓣瓣 同心京津冀"集中采访活动近日来到河北雄安新区,实地探访京雄快线施工现场。目前,京雄快线全线 主体结构已完工,正全力推进车站装修、机电安装调试和运营筹备等工作。《2026年北京市交通综合治 理行动计划》中提出,协同推进雄安R1线(京雄快线)建设和贯通改造,今年具备与大兴机场线贯通 运营调试条件。京雄快线开通运营后,从雄安航站楼站出发,半小时可达北京大兴国际机场,一小时可 达丽泽商务区,将为京雄两地提供便捷高效的通勤服务。(@北京新闻广播 记者 刘旭)#京雄快线进入 综合联调阶段# ...
“十五五”时期北京通州将围绕环球度假区等重点区域“量身定制”交通配套
Bei Jing Shang Bao· 2026-01-30 09:31
Core Viewpoint - The Tongzhou District is focusing on enhancing transportation infrastructure to support high-quality urban development and improve connectivity within the Beijing-Tianjin-Hebei region [1][2] Group 1: Transportation Infrastructure Development - The district will promote collaborative development in the transportation sector, addressing road bottlenecks and advancing key road network projects such as the west extension of the Jingqin Expressway and the east extension of Yaojiayuan Road [1] - By the end of this year, the Pinggu Line is expected to be ready for operation, enhancing cross-regional rail transport [1] - The district aims to optimize traffic organization in the Grand Canal Business District and accelerate the construction of critical cross-river roads and railways [1] Group 2: Public Transport and Connectivity - The district plans to improve the bus connection system around rail stations, reduce redundant routes, and introduce micro-circulation and "short, frequent, fast" routes to enhance last-mile connectivity [2] - There will be a focus on developing diverse transportation options, including customized express buses and ride-hailing services, to meet varied travel demands [2] - The integration of transportation and tourism will be promoted, with a scientific approach to setting up passenger and tourism lines around key transport hubs [2]
通州将围绕安贞医院通州院区、环球度假区等“量身定制”交通配套
Xin Jing Bao· 2026-01-30 09:20
Group 1 - The Beijing sub-center's "14th Five-Year" plan focuses on enhancing transportation infrastructure, with the Pinggu Line expected to be operational by the end of this year [1][2] - The sub-center will customize transportation support around key areas such as Anzhen Hospital's Tongzhou branch and the Universal Resort [1][3] - The plan includes the acceleration of M101 and Yizhuang lines, as well as the construction of additional stations to expand the rail network [2][3] Group 2 - The sub-center aims to strengthen interconnectivity and create a transportation model for the Beijing-Tianjin-Hebei region, addressing road bottlenecks and enhancing major road networks [2] - There will be a focus on optimizing traffic organization in the Grand Canal Business District and improving service capabilities in the southeast manufacturing corridor [3] - The initiative includes the development of a comprehensive bus connection system, introducing micro-circulation routes and "short, frequent, fast" lines to enhance last-mile connectivity [3]