铁路建设
Search documents
成渝中线高铁建设全面加速 成都段天然气输气管道工程迁改完工
Zhong Guo Xin Wen Wang· 2025-10-15 06:35
Core Viewpoint - The successful completion of the gas pipeline relocation project marks a significant milestone in the construction of the Chengyu Middle Line High-Speed Railway, facilitating the acceleration of the overall project [1][4]. Group 1: Project Details - The gas pipeline relocation project spans approximately 4.6 kilometers and involves complex intersections with various transportation facilities, including roads, railways, and greenways, with a total of 48 crossings [3]. - The project took 18 months from planning to completion, highlighting the technical challenges and the importance of energy security in conjunction with transportation infrastructure development [3][4]. Group 2: Strategic Importance - The D720 and D630 gas pipelines are critical for Sichuan Province, supplying about one-third of the natural gas for residential and commercial use in Chengdu, underscoring their strategic energy role [3]. - The relocation is considered a key task in the construction of the Chengyu Middle Line High-Speed Railway, recognized as one of the most challenging gas pipeline relocations in the region [4]. Group 3: Future Implications - The Chengyu Middle Line High-Speed Railway is a core component of the national high-speed rail network, designed for a speed of 350 km/h, and is expected to be completed by the end of 2027, significantly enhancing connectivity between Chengdu and Chongqing [7].
欧盟启动史上最大规模基础设施建设项目
Shang Wu Bu Wang Zhan· 2025-10-14 03:45
Core Points - The European Union has announced the planning of a high-speed railway network that will connect all member capitals and major urban areas, marking the largest infrastructure project in EU history with a total investment of €546 billion [2] - The project, driven by the Community of European Railways and Infrastructure Companies (CER), aims to create a faster, more environmentally friendly, and resilient transportation system, positioning rail as the primary mode of transport in Europe [2] - The plan includes the construction and renovation of over 49,400 kilometers of railway, with train speeds reaching 250 to 350 kilometers per hour, covering major cities and urban areas with populations over 250,000 [2] - The high-speed railway project aligns closely with the goals of the European Green Deal, which aims to reduce greenhouse gas emissions in the transport sector by 90% by 2050 [2] - Upon implementation, travel times will significantly decrease, such as the journey from Athens to Istanbul being reduced to 4 hours and from Madrid to Milan to less than 6 hours, making high-speed rail a strong competitor to the aviation industry while greatly reducing carbon emissions [2]
西十高铁接入汉十高铁,通车后西安到武汉2.5小时
Chang Jiang Ri Bao· 2025-10-14 00:44
Core Points - The construction of the Xi-Shi High-Speed Railway (HSR) in Hubei has officially begun, marking the start of the connection project with the Han-Shi HSR [1] - The Xi-Shi HSR will significantly reduce travel distance and time between Xi'an and Wuhan, enhancing connectivity in the region [4][8] - The project includes critical engineering works such as communication signal connections, track, and power supply integration, ensuring seamless operation with the existing Han-Shi HSR [10][11] Summary by Sections Project Overview - The Xi-Shi HSR will span 255.76 kilometers with a design speed of 350 km/h, featuring a bridge-tunnel ratio of 95.3% and seven stations along the route [3] - The Han-Shi HSR connects multiple cities over approximately 460 kilometers, also designed for a speed of 350 km/h, with 20 stations [3] Travel Time Reduction - The new route will shorten the distance from Xi'an to Wuhan from 1,059 kilometers to 716 kilometers, reducing travel time significantly [4] - Once operational in October 2026, the travel time from Xi'an to Shiyan will be under one hour, and to Wuhan will be approximately 2.5 hours [8] Engineering Challenges - The connection project involves complex engineering tasks, particularly in communication systems, which must maintain normal operations of the existing Han-Shi HSR during construction [10] - The construction units are employing advanced techniques and optimizing plans to ensure effective integration of the two HSR systems [11] Economic and Regional Impact - The seamless connection between Xi-Shi and Han-Shi HSRs is expected to enhance economic development, facilitate personnel movement, and promote cultural exchange in the region [11] - This project will contribute to the integration of the Central Yangtze River urban agglomeration and the Guanzhong Plain urban agglomeration, fostering cooperation between central and western regions and the eastern coastal areas [11]
宁淮城际铁路跨淮河入江水道段连续梁全部合龙
Xin Hua She· 2025-10-13 07:14
Core Points - The successful completion of the continuous beams for the Hongze to Jinhu double-line bridge marks a significant breakthrough in the construction of the Ninghuai Intercity Railway, which is crucial for the project's timely operation [1] - The Ninghuai Intercity Railway spans approximately 179 kilometers with a design speed of 350 kilometers per hour, connecting key cities in Jiangsu and Anhui provinces [1] - The bridge, measuring about 31.7 kilometers in length, is a critical control project for the railway, featuring the largest water area crossing and the longest span of continuous beam bridges along the route [1] - Once completed, the railway will enhance connectivity within the Yangtze River Delta intercity rail transit network, enabling a one-hour direct travel time between Huai'an and Nanjing, thus promoting regional integration and high-quality development [1]
陕西西安:西康高铁全线铺轨正式启动
Ren Min Wang· 2025-10-12 03:11
Core Points - The Xi-Kang High-Speed Railway has officially commenced track laying across its entire line [1][2][3] Group 1 - The Xi-Kang High-Speed Railway is a significant infrastructure project aimed at enhancing transportation connectivity in the region [1][2] - This project is expected to boost local economies and improve travel efficiency between key cities [1][3] - The commencement of track laying marks a critical milestone in the railway's construction timeline [2][3]
深汕高铁再迎新进展!两大站点全面开工
Nan Fang Du Shi Bao· 2025-10-11 09:41
Core Insights - The construction of the Shenzhen-Shanwei High-Speed Railway (深汕高铁) is progressing with two major stations, including Shenzhen's largest high-speed station and the Luohu North Station, now under construction [1][2] - The Xili Comprehensive Transportation Hub is a key project for enhancing Shenzhen's role as a national railway hub and improving the connectivity within the Guangdong-Hong Kong-Macao Greater Bay Area [1][2] Group 1: Project Progress - The Xili Comprehensive Transportation Hub has entered the main structure construction phase, with significant progress made during the recent National Day and Mid-Autumn Festival holidays [1] - Key milestones include the completion of 100% of the protective structure and engineering piles for the North Square, and 72.15% of the earthwork excavation, setting the stage for underground structure construction [1] - The project aims to complete most of the underground structure by the end of December this year, with the main structure expected to be finished by August 2027 [1] Group 2: Infrastructure Details - The Xili Comprehensive Transportation Hub will feature a total of 13 platforms and 25 lines, surpassing the existing Shenzhen North Station's 11 platforms and 20 lines [2] - The hub will integrate four high-speed rail lines, two intercity rail lines, and four metro lines, creating a multi-level rail transport network [2] - The Luohu North Station, which began construction on September 30, has an estimated investment of approximately 2.343 billion yuan and is expected to be completed by November 30, 2027 [2] Group 3: Connectivity and Impact - The Shenzhen-Shanwei High-Speed Railway will span 125.5 kilometers, significantly reducing travel time from Shenzhen to the Shanwei Special Cooperation Zone from 47 minutes to 30 minutes [3] - This railway will enhance connectivity between Shenzhen's urban center and the Shanwei Special Cooperation Zone, playing a crucial role in developing coastal high-speed railways and optimizing external railway access for Shenzhen [3]
西康高铁全线铺轨正式启动
Zhong Guo Xin Wen Wang· 2025-10-11 09:20
Core Points - The official launch of track laying for the Xikang High-Speed Railway marks a significant milestone in its construction, entering a comprehensive offensive phase [1][2] - The railway will traverse the Qinling Mountains with a high bridge-tunnel ratio of 94%, involving complex geological structures [2] - The total length of the main line track is 341.49 kilometers, with 19.62 kilometers of station track and 78 sets of switches being installed [2] Construction Progress - All 20 tunnels have been completed, 26 bridge main bodies are finished, and 406 box girders have been erected [2] - The design completion for the new station buildings is at 70%, while the overall completion of the four-electrical integration project exceeds 72% [2] - The ballastless track has achieved 97% of its design completion, indicating a rapid advancement in construction [2] Technological Advancements - The construction unit has optimized long rail transport plans, utilizing 32 intelligent cranes for efficient unloading, transfer, and storage of long steel rails [3] - The use of intelligent cranes has improved efficiency by over 40% compared to traditional manual operations, enhancing safety significantly [3] Project Management - The project employs advanced management techniques, including grid management and penetration management, to eliminate safety hazards and ensure intelligent, information-based, and green construction [5] - The Xikang High-Speed Railway is a crucial part of the national medium- and long-term railway network, significantly reducing travel time from Xi'an to Ankang from approximately 3 hours to under 1 hour [5]
京津冀城际铁路投资公司搬进雄安办公
Bei Jing Wan Bao· 2025-10-11 06:43
本报讯(记者胡子傲)记者从国铁集团获悉,10月10日起,国铁集团所属单位京津冀城际铁路投资有限 公司正式由北京迁驻雄安新区办公,为疏解北京非首都功能、推动雄安新区高质量发展、促进京津冀协 同发展注入新动能。 京津冀铁路公司负责人介绍,京津冀铁路公司是国铁集团重点监管的铁路公司,于2015年3月注册成 立,目前注册资本金800亿元,主要负责京津冀区域内城际铁路项目规划、建设、运营、投融资和综合 开发等工作。 京津冀铁路公司迁驻雄安新区将促进资源要素聚集,带动相关产业发展,有效发挥铁路建设投资对地区 经济的拉动作用,为雄安新区建设"千年大计"提供有力支撑。下一步,该公司将不断完善京津冀地区高 速铁路网布局,促进区域互联互通,着力打造"轨道上的京津冀"。 "十四五"期间,该公司承担11个铁路项目建设任务,总里程约1220公里,总投资约2950亿元。其中,北 京至唐山铁路(京唐城际)燕郊至唐山段、北京至天津滨海新区铁路(京滨城际)宝坻至北辰段、天津 至北京大兴国际机场铁路(津兴城际)、北京怀柔至北京大兴国际机场铁路(怀兴城际)廊坊至大兴段 相继建成通车;京唐城际北京城市副中心段、石家庄至黄骅港城际(石港城际)、京滨城 ...
深江铁路首座转体桥完成转体
Zhong Guo Xin Wen Wang· 2025-10-10 11:55
Core Points - The successful rotation of the T-shaped structure of the Guangzhongjiang Bridge marks the completion of the first rotating bridge construction for the Shenzhen-Jiangmen Railway [1][3] - The Shenzhen-Jiangmen Railway, approximately 116 kilometers long, connects Shenzhen and Jiangmen, with design speeds of 200 km/h and 250 km/h for different segments [3][6] - The construction of the bridge involved significant engineering challenges, including the need to rotate a 11,216-ton structure over an existing freight railway [3][4] Construction Details - The Guangzhongjiang Bridge spans 13.41 kilometers and features a T-shaped structure that was rotated 30.2 degrees to align with the existing railway [3][4] - The project utilized advanced technology, including 5G and a dynamic intelligent monitoring platform based on BIM and digital twin technology, to ensure precision during the rotation process [4] - The rotation process was conducted under challenging conditions, with the main support structure only 9.78 meters from the center of the freight line, which carries an average of 30 freight trains and 51,000 tons of cargo daily [3][4] Strategic Importance - The Shenzhen-Jiangmen Railway is a crucial part of the Guangdong-Hong Kong-Macao Greater Bay Area's rail network, enhancing connectivity between key economic zones [6] - Once completed, the railway will facilitate high-speed connections between major trade areas, contributing to regional economic development and integration [6]
合武高铁安徽段首座隧道贯通
Xin Hua She· 2025-10-10 08:01
Core Viewpoint - The successful completion of the Dazhu Garden Tunnel marks a significant milestone in the construction of the Hefei-Wuhan High-Speed Railway, indicating important progress in the project [1] Company Summary - China Railway Construction Corporation (CRCC) is overseeing the construction of the Dazhu Garden Tunnel, which is the first tunnel to be completed in the Anhui section of the Hefei-Wuhan High-Speed Railway [1] - The project is being executed by China Railway 21st Bureau Group, highlighting the company's involvement in major infrastructure projects [1] Industry Summary - The Hefei-Wuhan High-Speed Railway spans approximately 360 kilometers and is designed for a speed of 350 kilometers per hour, forming a crucial part of China's "eight vertical and eight horizontal" high-speed rail network [1] - The Dazhu Garden Tunnel, measuring about 675 meters in length, is a single-hole double-track high-speed railway tunnel, showcasing advancements in high-speed rail infrastructure [1] - The construction faced challenges due to complex geological conditions and undulating terrain, necessitating the use of a tunnel geological forecasting system to ensure safety and efficiency [1]