新能源及新能源装备制造
Search documents
甘肃将建全国重要新能源装备制造基地
Zhong Guo Chan Ye Jing Ji Xin Xi Wang· 2025-06-10 22:35
Core Viewpoint - Gansu Province aims to establish itself as a significant national base for renewable energy and renewable equipment manufacturing, targeting 160 million kilowatts of installed renewable energy capacity and over 200 billion yuan in production value by the end of 2030 [1][2]. Group 1: Current Status and Future Goals - As of April, Gansu's installed renewable energy capacity reached 67.2 million kilowatts, accounting for 64.7% of the total installed capacity [1]. - By the end of this year, the province aims to achieve 80 million kilowatts of installed renewable energy capacity and exceed 100 billion yuan in production value [3]. - The long-term goal is to double both installed capacity and production value by 2030, reaching 160 million kilowatts and over 200 billion yuan, respectively [1][3]. Group 2: Action Plan and Strategic Focus - The "Action Plan" emphasizes the development of the renewable energy and equipment manufacturing industry as a key focus for building a modern industrial system and accelerating the development of new productive forces [2]. - The plan outlines five functional areas to support the establishment of a national renewable energy base, including a comprehensive development demonstration area, a consumption transformation leading area, an industrial integration cluster area, a reform pilot area, and a multilateral cooperation experimental area [2]. Group 3: Key Tasks and Initiatives - The "Action Plan" includes 22 key tasks across five areas: supply, consumption, technology, system, and cooperation [3]. - Initiatives include enhancing the development of the Shage Desert base, upgrading the power grid, and promoting high-voltage transmission channels to improve renewable energy consumption [3]. - The plan also focuses on building an integrated industry system that combines production, education, research, and application, while advancing electricity market construction and ensuring stable power supply [3].
聚焦集群建设 加快转型升级 甘肃支柱产业增势强劲
Jing Ji Ri Bao· 2025-05-24 22:16
Group 1 - In the first quarter of this year, Gansu Province's industrial added value above designated size grew by 11% year-on-year, ranking second in the country [1] - The non-ferrous metals and electricity industries made significant contributions, driving industrial growth by 4.4 and 2.3 percentage points, respectively [1] - Key industrial products such as gold, lead, refined copper, nickel, and integrated circuits experienced double-digit growth, with natural gas production increasing by 89.3%, the highest in the country [1] Group 2 - The non-ferrous metal industry accounts for 25.5% of Gansu's total industrial output, with the "Jinbailanwu Non-ferrous Metal Cluster" selected as a national advanced manufacturing cluster for 2024 [1] - Recently, 29 projects, including a 12,000-ton ultra-fine high-purity metal powder material project, were signed with a total investment of 10.5 billion yuan [1] - A nickel-based alloy advanced material production line project with a capacity of 10,000 tons is under construction, expected to produce high-temperature corrosion-resistant alloys and pure nickel for various industries [1] Group 3 - The petrochemical industry is the largest pillar industry in Gansu, projected to account for 29.7% of the province's industrial output in 2024 [2] - Gansu is focusing on the high-end, intelligent, and green development of the petrochemical industry through various strategies, including integrated chain strengthening and green expansion [2] - In the first quarter, Lanzhou Petrochemical Company produced 409,000 tons of ethylene, an increase of 17,000 tons year-on-year, and new material output reached 171,000 tons, up by 9.3% [2] Group 4 - Gansu is a significant base for new energy and new energy equipment manufacturing, with 1.606 million kilowatts of new energy added to the grid in the first quarter [2] - The total installed capacity of new energy reached 65.97 million kilowatts, with a 12.4% increase in new energy generation [2] - By the end of March, Gansu's external electricity delivery from new energy reached 8.848 billion kilowatt-hours, a year-on-year increase of 71.55% [2]