Workflow
广州地铁线路
icon
Search documents
从“线”到“网”跃升!保民生促发展 粤港澳大湾区交通网越织越密
Yang Shi Wang· 2025-10-22 02:18
Core Insights - Infrastructure investment in China is steadily increasing, with a focus on enhancing public welfare and connectivity in the Guangdong-Hong Kong-Macao Greater Bay Area [1] - The opening of five new subway lines in Guangzhou has improved connectivity among six cities, contributing to the development of a "railway network" in the Greater Bay Area [3] - The construction of the Lion Rock Channel, a significant dual-layer highway project, is progressing, with expectations to create multiple world records upon completion [7][8] Infrastructure Investment - In the first three quarters of the year, Guangdong's transportation investment exceeded 130 billion yuan, maintaining a high level of activity [10] - The Lion Rock Channel's main bridge construction has surpassed 30% completion, with significant structural advancements already made [8] Transportation Connectivity - The Greater Bay Area's intercity railway network has evolved from a "line" to a "network," enabling a "one-hour living circle" for residents [5] - Future developments in Guangzhou's subway system will further enhance connectivity within the Greater Bay Area [5] Major Projects - The Lion Rock Channel will be the first dual-layer composite highway in the Pearl River Estuary, featuring a total length of approximately 35 kilometers and designed for 16 lanes [7] - The main span of the Lion Rock Channel will measure 2,180 meters, with a main tower height of 342 meters, setting five world records upon completion [7][8]
广州轨道交通迎来通车“大年”
Nan Fang Du Shi Bao· 2025-08-20 06:39
Group 1: Metro and Intercity Rail Developments - Guangzhou Metro has opened the 10th line (Yangji East to Xilang section) and the 12th line (Xunfenggang to Guangzhou Sports Center, and Ersha Island to South University Town) on June 29, enhancing connectivity with multiple lines including the Guangfo Line and Line 22 [1] - The Guangzhou Metro plans to open a total of 10 lines (sections) this year, covering a total length of 173 kilometers, which includes 6 metro lines and 4 intercity lines, forming a three-dimensional transportation network of "metro + intercity" [1] - Three intercity railways have passed preliminary acceptance, including the Guangfo East Ring, the Pazhou Branch of the Suiguan-Shenzhen Intercity Railway, and the New Baiyun-Guangzhou Airport T2 section, marking significant progress towards operational readiness [3] Group 2: High-Speed Rail Progress - The construction of the Guangzhan High-Speed Railway has completed the full track laying, with a total length of approximately 401 kilometers and over 897 kilometers of track laid, aiming for completion by the end of the year [2] - Guangzhan High-Speed Railway is a key component of the national high-speed rail network and is expected to significantly reduce travel time between the western Guangdong region and the Guangdong-Hong Kong-Macao Greater Bay Area [2] Group 3: Baiyun Airport Developments - Baiyun Airport has served over 50.2 million passengers from January 1 to August 13, 2025, marking an 8.3% increase compared to the same period last year [4] - The T3 terminal of Baiyun Airport is set to be operational this year, contributing to a large hub structure of "three terminals + five runways" [6] - Baiyun Airport is positioned as a crucial air bridge connecting the Greater Bay Area to the world, with over 240 domestic and international destinations and more than 1,700 international flights weekly [5]