Shang Wu Bu Wang Zhan
Search documents
驻奥克兰总领馆经商处出席新西兰风能协会访华团分享会
Shang Wu Bu Wang Zhan· 2025-12-13 02:14
Group 1 - The New Zealand Wind Energy Association (NZWEA) organized a delegation sharing session in China to explore mutual cooperation opportunities after visiting several Chinese wind power companies [2] - The event was attended by over 50 participants, including NZWEA CEO Kevin Hart and members of the New Zealand-China Relationship Promotion Committee [2] - The session highlighted the rich wind resources in New Zealand and the ambitious wind power installation targets set by the country [4] Group 2 - The Chinese Consulate in Auckland, represented by Consul Wang Chengguang, discussed China's 2035 national contribution goals and the "14th Five-Year Plan" for wind power development [4] - Chinese wind power companies are recognized for their efficient, innovative, and reliable products, which have gained a foothold in the global market [4] - Collaboration in the wind power sector between New Zealand and China is seen as beneficial for addressing climate change challenges [4]
瑞典11月失业率第三次达到9%的年度高点
Shang Wu Bu Wang Zhan· 2025-12-13 02:03
Group 1 - The core point of the article is that Sweden's unemployment figures have risen, with the unemployment rate reaching 9.0% in November 2025, marking the third month of the year at this annual high [1] - The number of unemployed individuals in Sweden has increased, with a specific focus on youth unemployment, which stands at 155,000 individuals [1] - The youth unemployment rate for those aged 15 to 24 is reported at 23.8%, indicating a significant challenge in the job market for younger demographics [1]
毛里塔尼亚与世界银行探讨加强合作伙伴关系
Shang Wu Bu Wang Zhan· 2025-12-13 01:50
Core Insights - The Mauritanian Minister of Energy and Petroleum, Khalid, discussed strengthening cooperation with a World Bank delegation to support national development priorities [1] Group 1: Power System Development - The Minister outlined the vision for reforming the electricity system and ongoing projects, including the expansion of a dual-fuel power plant with an increased capacity of 72 megawatts [1] - Plans include the construction of a 225-megawatt power plant at the Ahmeyim gas field, a 60-megawatt renewable energy plant, and a 300-megawatt power plant utilizing the Banda gas field [1] Group 2: Infrastructure Projects - Discussions included the Nouakchott-Nema high-voltage transmission line, which aims to provide electricity to 150 towns along the route [1] - The progress of emergency electrification in Nouakchott and inland areas was also a topic of discussion, along with World Bank-funded projects such as the $90 million REMDIER and BEST projects [1] Group 3: Electrification Goals - The Ministry's statement indicated that ongoing electricity projects, including the Kaedi-Selibaby-Kaedi ring network, aim to electrify 1,100 towns and villages, adding approximately 950,000 new electricity users [1]
世界银行发布毛里塔尼亚增长与就业国别报告
Shang Wu Bu Wang Zhan· 2025-12-13 01:46
Core Insights - The World Bank's report on Mauritania highlights the need for economic diversification beyond the mining sector to achieve sustainable and inclusive growth, as the current model is insufficient to meet the country's 2050 income aspirations [1] Economic Challenges and Policy Recommendations - Mauritania faces four long-term economic challenges: low labor demand, weak productivity growth, limited investment outside the mining sector, and high volatility in growth and income [2][3][4] - The labor participation rate is low, especially among youth and women, with 30% of the population living in poverty and only 42% of the labor force engaged in economic activities [2] - Recommendations include enhancing skills training, improving basic education, modernizing labor market regulations, and increasing female labor participation [2] - Productivity growth has been stagnant, with only a 26% increase over the past 22 years, primarily in the mining sector, necessitating reforms to stimulate enterprise innovation and competition [2] - Investment in sectors outside mining is limited, with 52.6% of foreign investment directed towards mining, indicating a need for improved business conditions and a more flexible labor market [3] - Economic growth is highly dependent on the mining sector, making it vulnerable to commodity price fluctuations and climate impacts, which necessitates better fiscal management and climate resilience strategies [4] Strategic Priorities for Reform - The report suggests prioritizing reforms based on feasibility, potential leverage, and impact on growth and employment, focusing on education, regulatory modernization, and private sector support [4] - Emphasis is placed on investing in human capital, particularly in STEM education, to facilitate economic diversification and reduce reliance on commodities [4]
摩洛哥开放国际银行卡境内购汇
Shang Wu Bu Wang Zhan· 2025-12-13 01:29
据摩洛哥7news网站12月9日报道,摩洛哥外汇管理局(Office des Changes)近日发布监管新规,正式授权 摩境内金融机构接受国际银行卡进行外汇购买操作,标志着摩金融交易规则与国际标准进一步接轨。 根据新规,用户可通过电子支付终端(POS机)直接使用国际银行卡以摩洛哥迪拉姆结算方式购买外币。 与此同时,授权机构还可为客户发行预存迪拉姆的专用支付卡作为外汇交易载体,这在摩外汇市场尚属 首次。值得注意的是,监管机构在推行便利化措施的同时,特别强调合规监管要求。新规明确所有交易 均须与符合金融行动特别工作组(FATF)《建议17》所载尽职调查标准的合作方进行,在反洗钱与打击恐 怖主义资金方面保持高标准管控,确保每笔交易全程可追溯。 分析指出,这项改革不仅拓展了摩数字化外汇交易渠道,更通过"电子化+可追溯"的双重机制,在提升 跨境支付便利性的同时强化金融风险防控能力。 ...
法国阿尔斯通加大在摩投资
Shang Wu Bu Wang Zhan· 2025-12-13 01:29
Core Insights - Alstom Group announced a $10 million investment in Morocco to establish the world's first dedicated train control console production line adaptable to multiple vehicle platforms, positioning Morocco in the high-value industrial sector of the international railway supply chain [1] Group 1: Investment and Development - The investment aims to enhance the local railway industry and create over 200 direct jobs [1] - Alstom will also double the production capacity of the Mitrac transformers at its Fez factory and establish a local R&D engineering center to promote technological innovation and improve the technical ecosystem [1] Group 2: Current Operations and Projects - Alstom currently employs 1,400 people in Morocco and has successfully delivered several key projects, including 270 Citadis trams for Rabat and Casablanca, 12 Avelia high-speed trains for Morocco's first high-speed rail line, and 77 Prima locomotives for the national railway network [1]
加纳议会通过《2025年道路交通修正法案》
Shang Wu Bu Wang Zhan· 2025-12-12 15:45
此次修订主要内容包括:设立更严格的驾驶员酒精浓度标准、将商业摩托车运营纳入法律框架、建 立机动车强制排放检测制度。立法重点在于允许并规范摩托车等车型开展付费载客及网约车服务,同时 致力于提升道路安全、促进青年就业,为交通运输业建立系统化监管机制。 据"加纳网"12月11日报道,加纳议会近日通过《2025年道路交通修正法案》,正式将摩托车、三轮 车及四轮车的商业客运与网约车服务合法化,并纳入国家交通监管体系。该法案旨在规范长期缺乏管理 的道路运输行业,预计将使超过一百万原处于非正规运营的从业人员获得合法身份,回应了此前行业协 会推动合法化的呼吁。 (原标题:加纳议会通过《2025年道路交通修正法案》) ...
2026年古巴电力系统供电将略有改善
Shang Wu Bu Wang Zhan· 2025-12-12 15:45
(原标题:2026年古巴电力系统供电将略有改善) 古巴多家媒体综合报道,12月4日,古巴能矿部长德拉欧在接受采访时表 示,2026年古国家电力系统稳定性将略有改善,但停电依然存在,主因是持续 性的燃料短缺。2025年有四台火电机组完成大修并将投运,安装的1000兆瓦太 阳能也将于2026年初并网,加上埃拉杜拉1号风电场的投产,发电量将进一步 增加。当前有超过1000兆瓦分布式发电因缺燃料而闲置,根本原因在于资金不 足。 ...
古巴西部地区多省电力中断
Shang Wu Bu Wang Zhan· 2025-12-12 15:45
(原标题:古巴西部地区多省电力中断) 古巴多家媒体综合报道,12月3日凌晨5时,古巴西部地区因圣克鲁斯与吉 特拉斯热电厂间的输电线路故障引发连锁反应,致使西恩富戈斯至比那尔德里 奥等多省大面积停电。截至下午15时,各省供电陆续得以恢复。 ...
古巴公共卫生部确认虫媒病毒病死亡病例
Shang Wu Bu Wang Zhan· 2025-12-12 15:45
(原标题:古巴公共卫生部确认虫媒病毒病死亡病例) 古巴格拉玛报12月1日报道,当日,古巴公共卫生部通报,在登革热和基 孔肯雅热广泛传播的复杂疫情下,全国已确认33人死于虫媒病毒病,其中登革 热致死12例(其中7例为18岁以下),基孔肯雅热致死21例(其中14例为18岁 以下),除青年岛特别市和马坦萨斯省外,全国其他省份均呈现疫情发展态 势。 ...