Shui Li Bu Wang Zhan
Search documents
黄河水利委员会持续推进现代化水库运行管理矩阵试点建设
Shui Li Bu Wang Zhan· 2025-09-08 04:53
会议强调,各水库管理单位高度重视运行管理矩阵建设,矩阵平台功能持续完善并实现上线运行,有效 提升了水库运行管理的精准化、信息化和现代化水平,各项重点工作推进扎实,全面完成试点建设任 务。 本站讯 9月2日至4日,黄河水利委员会党组成员、副主任赵银亮到三门峡、故县和花果山水库开展调 研,研究推进现代化水库运行管理矩阵试点建设工作。 调研组实地查看3座水库现代化运行管理矩阵试点建设情况,现场检查水库安全生产工作,并召开座谈 会,与各水库管理单位负责同志深入交流,听取基层在试点建设中的实践经验与难点问题。 会议要求,要深入贯彻水利部、黄委党组工作部署,坚持问题导向、目标导向,进一步将"四全"管 理、"四制(治)"体系、"四预"措施和"四管"工作落实向纵深推进,立足"实用、管用、好用",持续迭 代优化矩阵平台并强化应用,有机融入各工作环节,以运行管理矩阵为抓手,不断提升水库运行管理能 力和标准化管理水平,保障水库安全运行和效益充分发挥,并及时总结可复制、可推广的矩阵建设经 验。要严格落实水利安全生产风险管控"六项机制",夯实主体责任,加强风险管控和措施落实,坚决守 牢安全生产底线。 ...
水利部启动洪水防御Ⅳ级应急响应 积极应对台风“塔巴”暴雨洪水
Shui Li Bu Wang Zhan· 2025-09-07 08:27
Core Insights - The 16th typhoon "Tabha" is expected to cause significant rainfall in Guangdong and Guangxi from September 7 to 10, with heavy rain and potential flooding in specific areas [1] - The Ministry of Water Resources has initiated a level IV flood defense emergency response and is closely monitoring the typhoon's path and rainfall impact [1] - The Pearl River Water Resources Commission has activated a level III flood defense emergency response, coordinating reservoir management to mitigate flood risks [2] Group 1 - Typhoon "Tabha" is forecasted to bring heavy rainfall, particularly in western Guangdong and southern Guangxi, with some areas experiencing torrential rain [1] - Major rivers in the affected regions, including the Dongjiang, Hanjiang, and Xijiang, are expected to see significant water level rises, with risks of exceeding warning levels in smaller rivers [1] - The Ministry of Water Resources has emphasized the importance of implementing detailed flood prevention measures to ensure public safety [1] Group 2 - The Pearl River Water Resources Commission has mobilized resources for flood defense, including pre-releasing water from key reservoirs to prepare for incoming rainfall [2] - Two working groups from the Ministry of Water Resources have been dispatched to assist Guangdong and Guangxi in flood prevention efforts [2]
山西省高位推动全力构建“四水四定”政策体系
Shui Li Bu Wang Zhan· 2025-09-07 03:20
Core Viewpoint - Shanxi Province is implementing a rigid water resource constraint system and promoting comprehensive river protection and governance, aligning with national policies and setting specific targets for water resource management by 2025 and 2030 [1][2]. Group 1: Policy Implementation - Shanxi Province has introduced the "Four Waters and Four Determinations" policy framework, which includes a main implementation plan and six supporting measures aimed at enhancing water resource management and ecological protection [1][3]. - The "Four Waters and Four Determinations" framework includes specific tasks and responsibilities for 11 cities and 22 provincial departments, focusing on water allocation and usage efficiency [2][4]. Group 2: Specific Measures - The province has outlined 82 specific tasks across six categories to achieve water management goals, including total water usage, urban development boundaries, and agricultural irrigation areas [2]. - Key measures include the development of a groundwater management plan for 32 counties, a water rights trading management approach, and an ecological compensation mechanism for the Fen River basin [3]. Group 3: Financial and Structural Support - Financial support will be increased through agricultural water price subsidies and incentives for water-saving practices, aimed at enhancing agricultural productivity and restoring irrigation areas [3]. - The province is accelerating the construction of key water supply projects and reforming water pricing mechanisms to ensure sustainable water resource management [3].
北京市最大水利钢结构设施将变身“大花篮”
Shui Li Bu Wang Zhan· 2025-09-04 23:39
Core Viewpoint - The construction of the pressure regulating facility in the Beijing section of the South-to-North Water Diversion Project has officially commenced, aiming to enhance ecological integration and urban landscape quality [1] Group 1: Project Overview - The pressure regulating facility, located in Fangshan District, Beijing, is crucial for maintaining the safety of the water supply pipeline from the south to the capital, having been put into operation in October 2022 [1] - The facility features two circular towers with an outer diameter of approximately 15 meters and a height of about 35 meters, set against a picturesque mountainous backdrop [1] Group 2: Design and Aesthetics - The design concept, termed "a flower basket scattered in the forest," aims to transform the water facility into an ecological landscape, with a planned completion of the main construction by the end of this year [1] - The final design includes a 45-meter high steel structure resembling a flower basket, covered with climbing plants, enhancing the visual appeal and ecological environment [2] Group 3: Engineering and Safety Measures - The project emphasizes ecological integration, combining rigid and flexible elements, and features a streamlined steel structure with a hollow curtain wall technology [2] - Safety measures include wind tunnel tests conducted by a qualified national laboratory to optimize the building's design for stability, along with thorough reviews of design plans by a top-tier engineering design firm [2]
南水北调东线山东段工程委托管理备忘录签订
Shui Li Bu Wang Zhan· 2025-09-04 02:46
东线一期山东段工程2013年11月通水以来,已累计引调长江水80.87亿立方米,受益人口4000多万人, 在保障山东受水区供水安全方面发挥了关键作用。与此同时,工程还在复苏河湖生态、缓解地下水超 采、提升防洪排涝能力及内河航运能力等方面发挥了显著的综合效益。 本站讯 8月27日,中国南水北调集团和山东省水利厅负责同志在济南签订南水北调东线一期山东段新增 中央投资建设的工程委托山东省运行维护管理的备忘录。水利部王道席副部长见证签字,山东省陈平副 省长出席。 东线一期山东省境内有关工程委托运行维护管理备忘录的签订,是贯彻落实习近平总书记重要讲话指示 批示精神和加快构建国家水网战略部署,推进理顺有关工程运管体制,进一步调动中央和地方积极性, 确保工程安全、供水安全和水质安全,更好发挥工程综合效益的具体举措。 ...
珠江水利委员会会同广东省水利厅专题部署推进粤港澳大湾区水安全保障工作
Shui Li Bu Wang Zhan· 2025-09-04 02:03
Group 1 - The meeting focused on advancing water security in the Guangdong-Hong Kong-Macao Greater Bay Area, emphasizing the importance of implementing the water security guarantee plan over the past five years [1][2] - The meeting highlighted the significant progress and achievements made under the leadership of the Ministry of Water Resources and local water authorities in the region [1] - Key areas of focus included flood prevention, water supply security, green water ecology, and smart regulatory services [1] Group 2 - Departments and units were urged to enhance political awareness and ensure the effective implementation of the water security guarantee plan [2] - The meeting called for a systematic evaluation of the plan's progress and the formulation of strategies to address challenges and promote high-quality completion of key tasks [2] - Emphasis was placed on strengthening collaboration and unified management in river protection and governance across the Greater Bay Area [2]
长江水利委员会推进江垭和皂市水库现代化运行管理矩阵建设
Shui Li Bu Wang Zhan· 2025-09-03 03:51
Core Insights - The Yangtze River Water Resources Commission has conducted a survey on the operation and management of reservoir projects at the Li River Company, focusing on the modernization of the Jiangya and Zaoshi reservoirs [1] - The survey team acknowledged the achievements of the Li River Company in building a modern reservoir operation management matrix, emphasizing its role in promoting high-quality water conservancy development [1] Group 1 - The construction of a modern reservoir operation management matrix is a practical measure to advance high-quality water conservancy development and is essential for building "safe, ecological, and intelligent dams" [1] - The Li River Company is encouraged to enhance the matrix platform's construction, focusing on showcasing key highlights and strengthening its application in daily engineering management [1] - The company is urged to summarize experiences and highlight distinctive features to become a leader in modern reservoir operation management matrix construction [1] Group 2 - The Jiangya and Zaoshi reservoirs are among the first pilot reservoirs for the matrix initiative, tasked with exploring innovation and demonstrating leadership [2] - The Li River Company has strengthened coordination and resource integration, focusing on key projects such as the construction of a co-management mechanism and safety production risk control [2] - The digital application platform with Li River characteristics has been successfully implemented, notably during the flood defense in June, preventing potential water level crises in the Shimen River section [2]
黄河水利委员会专题研究高标准推进古贤水利枢纽工程建设
Shui Li Bu Wang Zhan· 2025-09-02 04:47
Core Points - The Yellow River Water Resources Commission is focusing on high-standard construction of the Guxian Water Conservancy Hub Project, aiming to establish a new benchmark for water conservancy projects in the Yellow River basin with goals of being a "people's project, quality project, and clean project" [1][2] - The project has made steady progress this year, with the project entity effectively coordinating design, supervision, and construction units, ensuring that milestone targets are being met [1][2] Group 1 - The meeting emphasized the importance of enhancing political awareness regarding the Guxian project and the need to increase responsibility, mission, and urgency in completing tasks such as project design, quality system establishment, and talent development [2] - There is a focus on precise and efficient service support, addressing key challenges, and ensuring that all measures are implemented thoroughly [2] - The project entity's capacity to fulfill responsibilities and improve management levels is being prioritized, with an emphasis on establishing a quality assurance system and ensuring accountability among all parties involved [2] Group 2 - Safety production is a critical focus, with the implementation of six risk control mechanisms for water conservancy safety, and an emphasis on managing safety during construction [2] - Departments are required to enhance supervision and management, ensuring that safety hazards are identified and rectified to maintain orderly and safe construction processes [2]
松辽水利委员会调研松辽流域“十五五”水安全保障规划工作
Shui Li Bu Wang Zhan· 2025-09-01 23:45
Group 1 - The core objective of the research is to enhance water security in the Songliao River Basin, focusing on high-quality development and addressing key issues in water resource management [1][4] - The research emphasizes the need for a comprehensive water network layout to ensure water supply security, considering the uneven distribution of water resources in the region [2] - The study aims to strengthen flood control measures by identifying and addressing weaknesses in flood management systems, including reservoir operations and flood channel construction [3] Group 2 - The initiative includes systematic governance to maintain the ecological health of rivers and lakes, with specific goals for the ecological restoration of the Xiliao and Hohlin Rivers [4] - The planning process involves extensive field research and stakeholder engagement to gather insights and recommendations for effective water management strategies [1][4] - The Songliao Water Resources Committee is committed to developing actionable plans for flood safety, water supply security, resource conservation, and ecological restoration [4]
珠江水利委员会审议上报珠江片跨省河流生态流量保障实施方案成果
Shui Li Bu Wang Zhan· 2025-09-01 23:45
Core Viewpoint - The establishment and assurance of ecological flow in rivers and lakes is crucial for the protection of ecological environments, with the Pearl River Water Resources Commission completing plans for 135 inter-provincial rivers [1][2] Group 1: Implementation and Oversight - The Ministry of Water Resources has prioritized the completion of ecological flow assurance plans for inter-provincial rivers as a key task for 2025 [1] - The Pearl River Water Resources Commission has formed a specialized working group to ensure high-quality completion of these tasks, involving technical experts and clear task assignments [2] - The commission has conducted thorough investigations and discussions with provincial authorities to gather feedback and ensure consistency across different water systems [2] Group 2: Technical and Scientific Approach - The commission emphasizes the scientific and practical aspects of determining ecological flow, ensuring that assessments are tailored to the specific conditions of each river basin [1][2] - The ecological flow assurance plans include detailed control measures, monitoring, and evaluation responsibilities, covering five major river systems [2] - The results have been revised based on feedback from meetings and are now submitted for review by the Ministry of Water Resources [3]