Workflow
MONGOLIA ENERGY(00276)
icon
Search documents
蒙古能源(00276) - 内幕消息 - 业务表现的最新情况
2025-10-23 09:10
香港交易及結算所有限公司及香港聯合交易所有限公司對本公告之內容概不負責,對其準確性 或完整性亦不發表任何聲明,並明確表示概不就因本公告全部或任何部分內容而產生或因依賴 該等內容而引致之任何損失承擔任何責任。 1 MONGOLIA ENERGY CORPORATION LIMITED 蒙古能源有限公司* (於百慕達註冊成立之有限公司) (股份代號:276) 內幕消息 業務表現的最新情況 本公告乃蒙古能源有限公司 (「本公司」,連同其附屬公司,統稱「本集團」) 根 據香港聯合交易所有限公司證券上市規則 (「上市規則」) 第 13.09(2)(a) 條及香 港法例第 571 章證券及期貨條例第 XIVA 部項下的內幕消息條文 (定義見上市 規則) 而刊發。 本公司董事會 (「董事會」) 謹此通知本公司股東 (「股東」) 及有意投資者,預 期本集團於截至二零二五年九月三十日止六個月 (「財政期間」) 相比於截至二 零二四年九月三十日六個月止的上個財政期間,將錄得總收入大幅減少至不多於 900,000,000 港元 (二零二四年:1,699,900,000 港元)。該收入減少主要由於全球 經濟衰退和中華人民共和國 (「 ...
中煤内蒙古能源公司增资至约20.5亿 增幅约105%
Xin Lang Cai Jing· 2025-10-17 06:21
Group 1 - The core point of the article is that China Coal Inner Mongolia Energy Co., Ltd. has increased its registered capital from 1 billion RMB to approximately 2.05 billion RMB, representing a growth of about 105% [1] - The company was established in August 2022 and is wholly owned by China Coal Energy Group Co., Ltd. [1] - The business scope of the company includes coal mining, management of state-owned trade for import and export of goods, coal washing, and sales of coal and its products [1]
内蒙古能源集团辟谣,6400余人秋招是假的!公司去年经营利润大涨331%
Hua Xia Shi Bao· 2025-10-13 15:06
Group 1 - Inner Mongolia Energy Group has announced the start of its 2026 autumn recruitment, with a deadline for applications set for October 24 and an examination date on November 8 [1] - The recruitment is aimed at graduates from national higher education institutions, specifically targeting those who have not been employed within two years of graduation [1] - The company plans to recruit over 6,400 positions across its 81 subsidiaries, covering various fields such as electrical engineering, mechanical engineering, and chemical engineering [2][5] Group 2 - A recent statement from Inner Mongolia Energy Group clarified that it has not released any official recruitment information for 2026, and any such claims made by third parties are false [3] - The company emphasized that it does not charge any fees for recruitment and has not authorized any training or recruitment agencies [3] - Legal actions may be pursued against individuals or organizations disseminating false recruitment information [3][4] Group 3 - Inner Mongolia Energy Group is a major energy enterprise in Inner Mongolia, with a registered capital of 20.8 billion and significant operational capabilities across various energy sectors [6] - The company reported a 10.3% increase in revenue and a 331% increase in operating profit for 2024, marking record highs in its financial performance [6] - As of the end of 2024, the company's total assets exceeded 150 billion, reflecting a 50% year-on-year growth [6] Group 4 - The company primarily relies on thermal power generation, with a reported total generation of 630.96 billion kilowatt-hours in 2024, a 26.31% increase from the previous year [7] - The coal power segment generated 521.55 billion kilowatt-hours, while renewable energy generation reached 109.41 billion kilowatt-hours, showing significant growth in both areas [7]
内蒙古能源集团否认“秋招拟招录6400人”!未发相关招聘
Nan Fang Du Shi Bao· 2025-10-11 11:31
Core Points - The Inner Mongolia Energy Group has reported unauthorized postings regarding its 2026 recruitment on social media platforms, which mislead the public and infringe on the company's rights [1][2] - The company clarified that as of October 10, no official recruitment information for 2026 has been released, and the only legitimate channels for such information are its verified WeChat and Douyin accounts [1] - The company has not published or authorized any exam preparation materials or training classes related to its recruitment process, and it does not charge any fees for applications or related services [1][2] Company Actions - The Inner Mongolia Energy Group issued a statement urging job seekers to rely solely on information from its official accounts and to be cautious of unofficial recruitment postings [2] - The company reserves the right to pursue legal action against individuals or organizations that disseminate false recruitment information [2]
国庆中秋假期内蒙古能源集团累计发电14.2亿千瓦时
Nei Meng Gu Ri Bao· 2025-10-10 15:36
Core Insights - Inner Mongolia Energy Group played a crucial role in energy supply during the National Day and Mid-Autumn Festival holidays, achieving a total power generation of 14.2 billion kWh from October 1 to 8, with coal power contributing 8.6 billion kWh and renewable energy contributing 5.6 billion kWh [1][3]. Group 1 - The company effectively utilized coal as a stabilizing force, implementing a supply guarantee plan and arranging production tasks to ensure stable electricity supply while advancing major project construction and maintenance of heating units [3]. - During the holiday period, the company’s renewable energy generation increased by 330 million kWh compared to the previous year [5]. - The company established emergency plans and enhanced operational management, focusing on key areas and equipment to ensure reliable operations and safe power generation [5].
内蒙古能源集团“双节”发电14.2亿千瓦时!
Core Insights - During the recent National Day and Mid-Autumn Festival, electricity demand surged, prompting Inner Mongolia Energy Group to take significant measures to ensure energy supply [1][4] - From October 1 to 8, Inner Mongolia Energy Group generated a total of 14.2 billion kilowatt-hours, with the coal power sector contributing 8.6 billion kilowatt-hours and the renewable energy sector contributing 5.6 billion kilowatt-hours [1] Group 1: Coal Power Sector - The coal power sector is described as the "ballast" of energy supply, having developed supply assurance plans in advance and meticulously arranged production tasks to ensure stable electricity supply [4] - Fire power units conducted comprehensive inspections to minimize equipment failures during the holiday period, implementing deep peak regulation measures to meet grid demands while ensuring stable operation [4] - The sector also focused on coal procurement and refined coal blending to ensure the efficiency of the coal transportation and boiler systems [4] Group 2: Renewable Energy Sector - The renewable energy sector fulfilled its electricity supply responsibilities, with a year-on-year increase of 3.3 billion kilowatt-hours in generation during the holiday [7] - Operations and maintenance centers established emergency plans and enhanced monitoring management, increasing on-site inspections to ensure equipment reliability and safety [7] - The sector implemented strict safety management practices, including thorough inspections and risk assessments, to ensure safe operation and power generation [7]
蒙古能源(00276) - 截至二零二五年九月三十日止月份之股份发行人的证券变动月报表
2025-10-02 08:49
股份發行人及根據《上市規則》第十九B章上市的香港預託證券發行人的證券變動月報表 | 狀態: | | --- | | 新提交 | | 截至月份: 2025年9月30日 | 公司名稱: 蒙古能源有限公司 呈交日期: 2025年10月2日 I. 法定/註冊股本變動 | 1. 股份分類 | 普通股 | 股份類別 | 不適用 | | | 於香港聯交所上市 (註1) | | 是 | | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 證券代號 (如上市) | 00276 | 說明 | 蒙古能源有限公司 | | | | | | | | | | 法定/註冊股份數目 | | | 面值 | | | 法定/註冊股本 | | | 上月底結存 | | | 15,000,000,000 | HKD | | 0.02 | HKD | | 300,000,000 | | 增加 / 減少 (-) | | | 0 | | | | HKD | | 0 | | 本月底結存 | | | 15,000,000,000 | HKD | | 0.02 | HKD | | 300 ...
内蒙古能源集团:以文明生产“小切口”聚安全高效发展“大能量”
Core Insights - Inner Mongolia Energy Group has implemented a "civilized production" approach to enhance management and create a safe and efficient production environment [1][2][3] Group 1: Civilized Production Initiatives - Inner Mongolia Energy Group emphasizes a long-term mechanism of "everyone participates, always maintains" to improve production standards [1] - The company has established clear operational zones and organized tools according to the "five fixed" principle, which has eliminated tool loss incidents [1] - The company integrates civilized production with hazard identification, conducting regular cleaning and training sessions to instill the idea that "civilized production equals safe production" [1] Group 2: Safety Management Enhancements - Jinshan Thermal Power Company has adopted 7S management since 2023, significantly improving safety management during equipment maintenance [2] - The company has set detailed standards for maintenance processes, aiming for zero personal injuries, equipment damage, and environmental pollution [2] - The company has equipped its control room with over 100 safety tools and upgraded over 10,000 equipment labels to enhance operational clarity and reduce operational risks [2] Group 3: Maintenance and Inspection Practices - Xilin Thermal Power Company is conducting a C-level maintenance of its unit, ensuring a clean and organized work environment [3] - The maintenance department has implemented customized area management and tool tracking to achieve zero tool loss and zero safety blind spots [3] - The defect elimination rate during maintenance has reached 100%, showcasing the effectiveness of the implemented practices [3]
内蒙古能源乌拉特中旗150万千瓦风储基地项目,正式投入商业运行
Ke Ji Ri Bao· 2025-09-16 02:39
Core Insights - The first large-scale land-based wind power project in China, the Inner Mongolia Energy Urat Qianqi 1.5 million kW wind-storage base project, has officially commenced commercial operation [1] Group 1: Project Overview - The project is located in Ganchi Maodu Town, Urat Qianqi, Bayannur City, Inner Mongolia, and utilizes 150 units of 10 MW wind turbines, making it the largest land-based wind power "giant array" in the country [3] Group 2: Technological Advancements - The super-large wind turbines feature all-carbon fiber blades, with a root diameter of 3.6 meters, enhancing the load-bearing capacity by over 26% [3] - The distance between the blade tips and the tower has increased by over 12%, significantly improving the safety of the blades during operation [3] - The project employs a main bearing with a diameter of 1.7 meters, which has notable advantages in width and thickness, resulting in a load-bearing capacity improvement of over 20% [3] - Overall safety performance of the turbine units has been significantly enhanced [3]
内蒙古能源集团5个独立储能项目开工
Xin Hua Cai Jing· 2025-09-15 15:24
Core Viewpoint - Inner Mongolia Energy Group has officially commenced construction on five independent energy storage projects, which are expected to enhance the region's energy management and stability [1] Project Details - The five projects include: - Tuquan: 500,000 kW / 2,000,000 kWh independent energy storage station - Dengkou: 400,000 kW / 1,600,000 kWh independent energy storage project - Huade: 500,000 kW / 2,000,000 kWh independent energy storage project - Chifeng City, Balinzuoqi: 400,000 kW / 1,600,000 kWh independent energy storage project - Sunite Right Banner: 300,000 kW / 1,200,000 kWh independent energy storage station [1] Technology and Safety Measures - The projects will utilize advanced blade battery stacking technology and square lithium iron phosphate batteries, adhering to strict fire safety requirements [1] - Fire safety measures include the installation of physical fire-retardant paint and dual fire protection systems using perfluorohexane gas and water sprinklers [1] Operational Benefits - Once completed, the large-capacity energy storage systems will effectively implement "peak shaving and valley filling," improving the management of renewable energy sources and enhancing the flexibility of marketing strategies [1] - The projects will ensure reliable power supply by increasing the frequency of charge and discharge cycles and significantly improving grid regulation and stability [1]